New contract with Skanska S.A. on construction of the Brdowski Bridge in Szczecin

Brdowski Bridge in Szczecin

Kliknij na zdjęcie, aby powiększyć

Our group of welders, on behalf of the main contractor – Skanska S.A., took part in the construction of the three-span Brdowski Bridge in Szczecin. The 200-metre-long bridge was designed as a steel structure on reinforced concrete latticing to connect the left bank of the River Oder with Ostrow Brdowski. In the long term perspective, the investment will accelerate the development of the shipyard area and help to increase employment in this area. The project schedule assumes that all work will be completed by September 2015.

Galeria zdjęć

Lifting of Brdowski Bridge elements in Szczecin
Preparation for transport of Brdowski Bridge

Supplying top-class specialists to accelerate your projects, prevent delays, and achieve industry-leading quality across Europe.

POLAND
SEC Pomorze Sp. z o.o.
Twarda 12
80-871 Gdańsk
NIP 957 104 71 98
NORWAY
SEC Norge AS
Kårevikstølen 47
5412 Stord
MVA 898 125 882
GERMANY
SEC GmbH
Kurfürstendamm 226
10719 Berlin
HRB 248467B
UNITED KINGDOM
SEC GB&NI Ltd
18 London Road, Portsmouth
England, PO2 0LH, UK
Company no. 13763919

© Copyrights 2026 SEC Pomorze Sp. z o.o. All rights reserved.

Designed by Product and Business Developer Marcin Piłat