Execution of bridge construction elements

SEC Pomorze welding teams have assisted Vistal Eko in execution of bridge construction elements. The 30-ton duplex construction is part of the Hardanger Bridge. The Hardanger Bridge opened August 2013 is an 1,380 meter long suspension bridge floats 200m above water. It connects two shores between Hardanger Fjord to improve travel and transport on the routes between Odda - Voss and Bergen - Hardanger.

Levererar specialister i världsklass för att accelerera dina projekt, förhindra förseningar och uppnå branschledande kvalitet i hela Europa.

POLAND
SEC Pomorze Sp. z o.o.
Twarda 12
80-871 Gdańsk
NIP 957 104 71 98
NORWAY
SEC Norge AS
Kårevikstølen 47
5412 Stord
MVA 898 125 882
GERMANY
SEC GmbH
Kurfürstendamm 226
10719 Berlin
HRB 248467B
UNITED KINGDOM
SEC GB&NI Ltd
18 London Road, Portsmouth
England, PO2 0LH, UK
Company no. 13763919

© Copyrights 2026 SEC Pomorze Sp. z o.o. Alla rättigheter förbehållna.

Designad av Product and Business Developer Marcin Piłat