[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fakskm0masdiz":3},[4,61,106,158,205,252,298,365,410,459,502,584,685,740,796,866,1019,1083,1148,1190,1240,1276,1326,1377,1428,1451,1471,1522,1569,1616,1677,1732,1795,1875,1934,1997,2043,2097,2128,2180,2227,2265,2315,2358,2405,2449,2498,2521,2572,2619,2671,2721,2755,2804,2863,2900,2946,3005,3063,3111,3165,3207,3236,3286,3313,3335,3387,3437,3486,3511,3541,3572,3597,3619,3645,3671,3712,3736,3763,3790,3814,3839,3878,3915,3941,3969,3997],{"id":5,"Title":6,"Slug":7,"Date":8,"Story":9,"Links":10,"createdAt":11,"updatedAt":12,"publishedAt":13,"MainVisualContent":14,"Projects":55,"Clients":56,"Countries":57,"Locations":58,"Companies":59,"Tags":60},91,"Achilles Sustainability Assessment 2026: Audit summary and results for SEC Norge AS","achilles-sustainability-assessment-2026-audit-summary-and-results-for-sec-norge-as","2026-10-05","The Achilles Sustainability Assessment is an external independent audit that verifies a company’s operations in four areas: environmental, social, governance and financial situation. The assessment is objective and provides data on the company’s organizational development and sustainability. This year, our company, SEC Norge AS, achieved an overall score of 78%, which corresponds to a 4-star rating! \n\n## What does the Achilles certification proces look like? ##\n\nThe certification proces is based on a detailed, independent verification of procedures in use at the company. The audit analyses environmental and financial aspects, as well as internal management systems. SEC Norge AS achieved the highest score in the Social category – 96% - which reflects the effectiveness of our approach to safety and health procedures, the competence of our staff and our social responsibility. In the Governance category, we received a score of 87%, which confirms the effectiveness of our corporate procedures and ethical standards. The Environment and Financial scores are approximately 70%, demonstrating our stable and sustainable growth and our readiness to undertake challenging projects. \n\n## Why is the Achilles Sustainability Assessment certificate is important to us? ##\n\nThe Achilles certification confirms the transparency policy of our company, SEC Norge AS. For a companies operating on our industry, it is important to base cooperation on what can actually be evaluated and confirmed. These results confirm that our internal procedures, safety systems and corporate stability meet all necessary market standards. \n\n## What does the Achilles certification mean for us? ##\n\nReceiving the Achilles Sustainability Assesment certification is official confirmation that we fulfill the standards required by our industry. This document confirms that our company is ready to undertake challenging projects while maintaining a highly competent workforce, effective health and safety procedures, business ethics, and transparent management. A huge thank you to all our employees, thanks to whom we were able to once again earn the Achilles certificate! ",null,"2026-10-15T10:33:55.020Z","2026-10-15T10:35:56.518Z","2026-10-15T10:33:59.360Z",{"id":15,"name":16,"alternativeText":16,"caption":16,"width":17,"height":18,"formats":19,"hash":50,"ext":21,"mime":24,"size":51,"url":52,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":54,"updatedAt":54},238,"Achilles Sustainability Assessment Certification 2026 78 score.png",2479,3508,{"large":20,"small":29,"medium":36,"thumbnail":43},{"ext":21,"url":22,"hash":23,"mime":24,"name":25,"path":10,"size":26,"width":27,"height":28},".png","https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Achilles-Sustainability-Assessment-Certification-2026-78-score_2026-10-15T10-35-49.png","b552e2c398f598115d5876d1f1d47f4d","image\u002Fpng","large_Achilles Sustainability Assessment Certification 2026 78 score.png",596.13,707,1000,{"ext":21,"url":30,"hash":31,"mime":24,"name":32,"path":10,"size":33,"width":34,"height":35},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Achilles-Sustainability-Assessment-Certification-2026-78-score_2026-10-15T10-35-49.png","28deb3cac7f085f27aa02f0bb81a4400","small_Achilles Sustainability Assessment Certification 2026 78 score.png",180.21,353,500,{"ext":21,"url":37,"hash":38,"mime":24,"name":39,"path":10,"size":40,"width":41,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Achilles-Sustainability-Assessment-Certification-2026-78-score_2026-10-15T10-35-49.png","d13138a2e43d7f2d740ec2866aef8c60","medium_Achilles Sustainability Assessment Certification 2026 78 score.png",364.81,530,750,{"ext":21,"url":44,"hash":45,"mime":24,"name":46,"path":10,"size":47,"width":48,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Achilles-Sustainability-Assessment-Certification-2026-78-score_2026-10-15T10-35-45.png","eeb94834839cad8f46ee3b028cf8968a","thumbnail_Achilles Sustainability Assessment Certification 2026 78 score.png",24.09,110,156,"47ff4d12dc78f7da5344e7681744570e",3346.33,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FAchilles-Sustainability-Assessment-Certification-2026-78-score_2026-10-15T10-35-44.png","strapi-do-spaces-pabd","2026-10-15T10:35:49.969Z",[],[],[],[],[],[],{"id":62,"Title":63,"Slug":64,"Date":8,"Story":65,"Links":10,"createdAt":66,"updatedAt":67,"publishedAt":10,"MainVisualContent":68,"Projects":100,"Clients":101,"Countries":102,"Locations":103,"Companies":104,"Tags":105},90,"SEC Norge AS with Revidert Arbeidsgiver certification","sec-norge-as-with-revidert-arbeidsgiver-certification","In the shipbuilding industry, transparency and care for our employees are the foundations of the trust between us and our team. We are proud to announce that SEC Norge AS has successfully passed an external audit and received the Revidert Arbeidsgiver certification from NHO Service og Handel. \n\n## What is Revidert Arbeidsgiver certification, and how does it work? ## \n\nRevidert Arbeidsgiver is an audit standard in Norway, and certification involves a detailed process that includes an external administrative audit. The process verifies the company’s internal procedures are compliant with Norwegian labor law and that the company prioritizes the well-being and safety of their employees. \n\n ## Why is this certification so important? ##\n \nToday’s market in our industry needs clear evidence of a company’s professionalism and reliability. In Norway, employment agencies are expected to provide not only declarations but also proof that employees are treated fairly and in the highest standards. Holding the Revidert Arbeidsgiver certification guarantees that working in our company means working with a well-established agency that manages its employees transparently and cares about full compliance with employees’ rights. \n\n ## What exactly was audited?  ##\n\nThe audit focused on key areas of the company’s operations, such as full compliance of employment contracts with current laws, transparent and equitable compensation in accordance with the principle of equal treatment, proper record-keeping and adherence to working time standards, the implementation of reliable health and safety procedures in cooperation with business partners, as well as complex social benefits. \n\nWhat does this certification mean? \n\nFor our company, receiving this certification confirms our strategy of building relationships based on partnership and transparency. This certification gives our employees the assurance that their employment conditions, pay rates, vacation time, issues related to working hours, and safety are well managed. It is true confirmation that SEC Norge AS cares for every member of the team in a professional and trustworthy way, making us a reliable employer. \n\n ## A common success  ##\n\nWe were able to achieve this important certification thanks to the commitment of our entire team. We thank our employees for their daily work and their responsible and reliable work. It is thanks to you we are building a safe work environment. This certification is a common success for all of us, and it motivates us to continue growing and raising our standards. ","2026-10-13T10:22:20.701Z","2026-10-13T10:24:07.739Z",{"id":69,"name":70,"alternativeText":70,"caption":70,"width":71,"height":72,"formats":73,"hash":96,"ext":21,"mime":24,"size":97,"url":98,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":99,"updatedAt":99},234,"Revidert Arbeidsgiver certification for SEC Norge AS signed under NHO Service og Handel.png",2480,3506,{"large":74,"small":79,"medium":85,"thumbnail":91},{"ext":21,"url":75,"hash":76,"mime":24,"name":77,"path":10,"size":78,"width":27,"height":28},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Revidert-Arbeidsgiver-certification-for-SEC-Norge-AS-signed-under-NHO-Service-og-Handel_2026-10-13T10-22-14.png","27d6d7e4a4385667c271105c5ad0c28a","large_Revidert Arbeidsgiver certification for SEC Norge AS signed under NHO Service og Handel.png",386.1,{"ext":21,"url":80,"hash":81,"mime":24,"name":82,"path":10,"size":83,"width":84,"height":35},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Revidert-Arbeidsgiver-certification-for-SEC-Norge-AS-signed-under-NHO-Service-og-Handel_2026-10-13T10-22-14.png","7d6ad413b88b0a93d8d8859bf59ac28d","small_Revidert Arbeidsgiver certification for SEC Norge AS signed under NHO Service og Handel.png",135.24,354,{"ext":21,"url":86,"hash":87,"mime":24,"name":88,"path":10,"size":89,"width":90,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Revidert-Arbeidsgiver-certification-for-SEC-Norge-AS-signed-under-NHO-Service-og-Handel_2026-10-13T10-22-14.png","0f79832c4223b4254789a8ed2844dc2a","medium_Revidert Arbeidsgiver certification for SEC Norge AS signed under NHO Service og Handel.png",258.15,531,{"ext":21,"url":92,"hash":93,"mime":24,"name":94,"path":10,"size":95,"width":48,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Revidert-Arbeidsgiver-certification-for-SEC-Norge-AS-signed-under-NHO-Service-og-Handel_2026-10-13T10-22-10.png","28d1998f77149dd347a01b486a7432dc","thumbnail_Revidert Arbeidsgiver certification for SEC Norge AS signed under NHO Service og Handel.png",18.55,"b76ae827947f46e3829b833c06310c27",1084.87,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FRevidert-Arbeidsgiver-certification-for-SEC-Norge-AS-signed-under-NHO-Service-og-Handel_2026-10-13T10-22-09.png","2026-10-13T10:22:14.770Z",[],[],[],[],[],[],{"id":107,"Title":108,"Slug":109,"Date":110,"Story":111,"Links":10,"createdAt":112,"updatedAt":113,"publishedAt":114,"MainVisualContent":115,"Projects":152,"Clients":153,"Countries":154,"Locations":155,"Companies":156,"Tags":157},89,"Prefabrication standards for the Rosebank FPSO at ISO Fabrikk, Aker Solutions","prefabrication-standards-for-the-rosebank-fpso-at-iso-fabrikk-aker-solutions","2026-03-16","The modernization of the Petrojarl Rosebank FPSO has reached its next phase. Following the initial surveying in Dubai, our operations moved to Aker Solutions’ ISO Fabrikk in Stord, Norway, for the prefabrication stage. The project focuses on upgrading insulation systems to ensure the vessel’s safe and efficient operation in the demanding conditions of the North Sea, where protection against low temperatures and high winds is essential.\n\nDuring this stage, our team of tinsmiths and workshop technicians manufactured specialized insulation components based on the precise technical drawings collected during the Dubai surveying phase. This direct link between measurement and production ensured that all elements were built to the exact specifications of the FPSO's existing infrastructure. By maintaining this continuity, we minimize the risk of fitment issues during the final offshore installation.\n\nA key part of the work involved the prefabrication of removable insulation boxes compliant with the NORSOK M-004 standard. Specifically, our team produced Class IV insulation boxes designed to protect the installation from freezing, heavy rainfall, and internal condensation. These removable systems allow for easy access during future maintenance while providing a robust barrier against the North Sea’s corrosive and volatile environment.\n\nWith the prefabrication in Stord now complete, the components are being prepared for transport to the final location. The FPSO is currently in transit from Dubai to the Rosebank field, situated approximately 130 km west of the Shetland Islands. Once the vessel arrives at its destination, the final stage will begin, involving the on-site installation of the boxes to ensure the unit is fully protected for its long-term production cycle.\n\nThis phase marks the successful integration of technical documentation, expert craftsmanship, and international logistics. By combining the skills of our insulation tinsmiths with standardized NORSOK requirements, we provide the Petrojarl Rosebank with an insulation system ready for decades of offshore service. The completion of these components brings the project one step closer to full operational readiness.","2026-03-18T11:16:12.968Z","2026-03-23T11:07:11.913Z","2026-03-18T11:16:13.955Z",{"id":116,"name":117,"alternativeText":118,"caption":118,"width":119,"height":120,"formats":121,"hash":148,"ext":123,"mime":126,"size":149,"url":150,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":151,"updatedAt":151},207,"Prefabrication and Technical Standards for the Rosebank FPSO at ISO Fabrikk Aker Solutions Stord.jpg","Prefabrication and Technical Standards for the Rosebank FPSO at ISO Fabrikk Aker Solutions Stord",2296,4080,{"large":122,"small":130,"medium":136,"thumbnail":142},{"ext":123,"url":124,"hash":125,"mime":126,"name":127,"path":10,"size":128,"width":129,"height":28},".jpg","https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Prefabrication-and-Technical-Standards-for-the-Rosebank-FPSO-at-ISO-Fabrikk-Aker-Solutions-Stord_2026-03-18T11-19-20.jpg","90546213882ab76dec62a0a2db74b8f5","image\u002Fjpeg","large_Prefabrication and Technical Standards for the Rosebank FPSO at ISO Fabrikk Aker Solutions Stord.jpg",86.39,563,{"ext":123,"url":131,"hash":132,"mime":126,"name":133,"path":10,"size":134,"width":135,"height":35},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Prefabrication-and-Technical-Standards-for-the-Rosebank-FPSO-at-ISO-Fabrikk-Aker-Solutions-Stord_2026-03-18T11-19-20.jpg","46f043962a2076bbddd0e2f0cf068082","small_Prefabrication and Technical Standards for the Rosebank FPSO at ISO Fabrikk Aker Solutions Stord.jpg",26.19,281,{"ext":123,"url":137,"hash":138,"mime":126,"name":139,"path":10,"size":140,"width":141,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Prefabrication-and-Technical-Standards-for-the-Rosebank-FPSO-at-ISO-Fabrikk-Aker-Solutions-Stord_2026-03-18T11-19-20.jpg","4acbe1f7fe228b60cffb9ce3feff1b26","medium_Prefabrication and Technical Standards for the Rosebank FPSO at ISO Fabrikk Aker Solutions Stord.jpg",51.82,422,{"ext":123,"url":143,"hash":144,"mime":126,"name":145,"path":10,"size":146,"width":147,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Prefabrication-and-Technical-Standards-for-the-Rosebank-FPSO-at-ISO-Fabrikk-Aker-Solutions-Stord_2026-03-18T11-19-19.jpg","270b2098c53e0996ec0f9e30d0fe0c16","thumbnail_Prefabrication and Technical Standards for the Rosebank FPSO at ISO Fabrikk Aker Solutions Stord.jpg",4.09,88,"86e51434fbec98d2cbe50d176b7235ca",2144.89,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FPrefabrication-and-Technical-Standards-for-the-Rosebank-FPSO-at-ISO-Fabrikk-Aker-Solutions-Stord_2026-03-18T11-19-19.jpg","2026-03-18T11:19:20.783Z",[],[],[],[],[],[],{"id":147,"Title":159,"Slug":160,"Date":161,"Story":162,"Links":10,"createdAt":163,"updatedAt":164,"publishedAt":165,"MainVisualContent":166,"Projects":199,"Clients":200,"Countries":201,"Locations":202,"Companies":203,"Tags":204},"Modernization of the Rosebank FPSO: Insulation surveying and measurement in Dubai","modernization-of-the-rosebank-fpso-insulation-surveying-and-measurement-in-dubai","2026-02-03","Our team is currently involved in the modernization of the Petrojarl Knarr unit (to be renamed Petrojarl Rosebank) at Dubai Drydocks World. This project, managed by Aker Solutions for Altera Infrastructure, aims to prepare the FPSO for 25 years of continuous operation on the Rosebank field in the North Sea. The upgrade is designed to ensure the vessel can operate long-term without the need for additional drydocking.\n\nOur work starts with technical documentation and site surveying in Dubai. Our insulation surveyors and site engineer are responsible for taking precise measurements and creating technical drawings of the unit. This step is essential to ensure that all later components fit the existing installation exactly, which helps avoid delays and reduces downtime during the final integration.\n\nIn the North Sea, insulation systems must handle extreme weather, including freezing temperatures and high winds. Our offshore insulation engineers and specialized personnel focus on thermal protection and preventing corrosion under insulation (CUI). By upgrading these systems, we help maintain the vessel's operational integrity and safety for its upcoming decades of service in the UK offshore sector.\n\nOnce the data collection in Dubai is complete, the project moves to the prefabrication stage at Aker Solutions’ ISO Fabrikk in Stord, Norway. Our team will support this phase by providing insulation fitters and supervisors to execute the work. Having the sameteam handle both the initial site surveying and the production stage ensures that the prefabricated parts meet the technical requirements and the project stays on schedule.\n\nThis project is a practical example of our experience in FPSO modernization and manpower supply. By providing skilled insulation engineers and technical staff across different international locations, we support the delivery of reliable infrastructure for the offshore energy industry.","2026-03-18T10:56:35.206Z","2026-03-18T11:05:45.147Z","2026-03-18T11:05:45.134Z",{"id":167,"name":168,"alternativeText":169,"caption":169,"width":170,"height":171,"formats":172,"hash":195,"ext":123,"mime":126,"size":196,"url":197,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":198,"updatedAt":198},204,"Insulation surveying specialists taking measurements on the Petrojarl Rosebank FPSO during upgrade works at Drydocks World Dubai..jpg","Insulation surveying specialists taking measurements on the Petrojarl Rosebank FPSO during upgrade works at Drydocks World Dubai",1536,2048,{"large":173,"small":178,"medium":184,"thumbnail":189},{"ext":123,"url":174,"hash":175,"mime":126,"name":176,"path":10,"size":177,"width":42,"height":28},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Insulation-surveying-specialists-taking-measurements-on-the-Petrojarl-Rosebank-FPSO-during-upgrade-works-at-Drydocks-World-Dubai._2026-03-18T10-56-30.jpg","2a723b310563ff27ec2663c46ea181f5","large_Insulation surveying specialists taking measurements on the Petrojarl Rosebank FPSO during upgrade works at Drydocks World Dubai..jpg",190.9,{"ext":123,"url":179,"hash":180,"mime":126,"name":181,"path":10,"size":182,"width":183,"height":35},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Insulation-surveying-specialists-taking-measurements-on-the-Petrojarl-Rosebank-FPSO-during-upgrade-works-at-Drydocks-World-Dubai._2026-03-18T10-56-30.jpg","64bf657ee3024320e4af69b993b9f894","small_Insulation surveying specialists taking measurements on the Petrojarl Rosebank FPSO during upgrade works at Drydocks World Dubai..jpg",58.12,375,{"ext":123,"url":185,"hash":186,"mime":126,"name":187,"path":10,"size":188,"width":129,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Insulation-surveying-specialists-taking-measurements-on-the-Petrojarl-Rosebank-FPSO-during-upgrade-works-at-Drydocks-World-Dubai._2026-03-18T10-56-30.jpg","bd290d939743a83f88896d466ba6511b","medium_Insulation surveying specialists taking measurements on the Petrojarl Rosebank FPSO during upgrade works at Drydocks World Dubai..jpg",117.87,{"ext":123,"url":190,"hash":191,"mime":126,"name":192,"path":10,"size":193,"width":194,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Insulation-surveying-specialists-taking-measurements-on-the-Petrojarl-Rosebank-FPSO-during-upgrade-works-at-Drydocks-World-Dubai._2026-03-18T10-56-29.jpg","9ae1589f1f0d9e1a4920b0355a7ce1c6","thumbnail_Insulation surveying specialists taking measurements on the Petrojarl Rosebank FPSO during upgrade works at Drydocks World Dubai..jpg",7.55,117,"a6642af00019d61dfad4413554ee21d0",940.63,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FInsulation-surveying-specialists-taking-measurements-on-the-Petrojarl-Rosebank-FPSO-during-upgrade-works-at-Drydocks-World-Dubai._2026-03-18T10-56-29.jpg","2026-03-18T10:56:30.908Z",[],[],[],[],[],[],{"id":206,"Title":207,"Slug":208,"Date":209,"Story":210,"Links":10,"createdAt":211,"updatedAt":212,"publishedAt":213,"MainVisualContent":214,"Projects":246,"Clients":247,"Countries":248,"Locations":249,"Companies":250,"Tags":251},87,"A Voice for 900 Specialists: SEC Group at Aker Solutions Stord’s Year-End Town Hall","a-voice-for-900-specialists-sec-group-at-aker-solutions-stord-s-year-end-town-hall","2025-12-17","As the year draws to a close, SEC Group received a distinct honor an invitation to speak at the Joint All-Meeting for the Hugin A and Valhall PWP projects at Aker Solutions in Stord. Speaking before a massive audience of over 3000 employees from all involved companies, it was a privilege for our leader, Marcin Piłat, to share the stage during the joint session alongside top industry decision-makers. The meeting was opened by Arne Hammer (Yard Director Stord), followed by key addresses from Geir Glømmi (EVP Aker Solutions), Peter Kupka (Project Director Yggdrasil\u002FAker BP), and Sigurd Sævareid (Union Chair). Being included in this lineup confirms our role not just as a supplier, but as a strategic partner representing the voice of the hired-in workforce.\n\nWe are incredibly proud that currently, over 900 of our employees are actively working on these landmark projects. Our team is diverse and highly skilled, covering a vast range of disciplines including welding, scaffolding, insulation, prefabrication, and warehousing. Our contribution extends beyond skilled labor, we provide essential support through HSSE personnel, team leaders, and foremen, as well as engineers and inspectors. This impressive number confirms that Polish specialists are the backbone of operations at Stord and other Norwegian yards.\n\nDuring the session, the focus was on summarizing the status of these massive projects and setting clear expectations for the year ahead. While the executives highlighted the competitive challenges Europe faces from Asian shipyards, we emphasized the solution the quality and efficiency of our people. It was a moment to acknowledge the professionalism of the Polish workforce and to motivate both leaders and specialists to continue proving that our model of cooperation delivers world-class results.\n\nLooking ahead to 2026, we remain committed to supporting Aker Solutions with the best talent available. We want to thank every single one of our employees for their hard work on Hugin A and Valhall PWP. Your dedication builds our reputation every day. We wish you all a safe and restful holiday season, ready to take on new challenges and achieve shared success in the coming year.","2025-12-21T22:20:13.266Z","2026-02-01T20:32:12.829Z","2025-12-21T22:20:14.477Z",{"id":215,"name":216,"alternativeText":216,"caption":216,"width":217,"height":218,"formats":219,"hash":242,"ext":21,"mime":24,"size":243,"url":244,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":245,"updatedAt":245},187,"SEC Norge leader Marcin Pilat at Joint All-meeting at Stord for project Valhall PWP & Hugin A .png",3840,2160,{"large":220,"small":225,"medium":230,"thumbnail":235},{"ext":21,"url":221,"hash":222,"mime":24,"name":223,"path":10,"size":224,"width":28,"height":129},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-leader-Marcin-Pilat-at-Joint-All-meeting-at-Stord-for-project-Valhall-PWP-&-Hugin-A _2025-12-21T22-14-05.png","e3859a2b57bfabd0caeaac5b3ced2767","large_SEC Norge leader Marcin Pilat at Joint All-meeting at Stord for project Valhall PWP & Hugin A .png",1175.67,{"ext":21,"url":226,"hash":227,"mime":24,"name":228,"path":10,"size":229,"width":35,"height":135},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-leader-Marcin-Pilat-at-Joint-All-meeting-at-Stord-for-project-Valhall-PWP-&-Hugin-A _2025-12-21T22-14-05.png","97fad8a7b642968838416367b837206a","small_SEC Norge leader Marcin Pilat at Joint All-meeting at Stord for project Valhall PWP & Hugin A .png",324.61,{"ext":21,"url":231,"hash":232,"mime":24,"name":233,"path":10,"size":234,"width":42,"height":141},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-leader-Marcin-Pilat-at-Joint-All-meeting-at-Stord-for-project-Valhall-PWP-&-Hugin-A _2025-12-21T22-14-05.png","757e15bd938c3e4bd034c6083e54a33c","medium_SEC Norge leader Marcin Pilat at Joint All-meeting at Stord for project Valhall PWP & Hugin A .png",692.81,{"ext":21,"url":236,"hash":237,"mime":24,"name":238,"path":10,"size":239,"width":240,"height":241},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-leader-Marcin-Pilat-at-Joint-All-meeting-at-Stord-for-project-Valhall-PWP-&-Hugin-A _2025-12-21T22-14-01.png","8072faf21af3a5b412cd206015a7e9e8","thumbnail_SEC Norge leader Marcin Pilat at Joint All-meeting at Stord for project Valhall PWP & Hugin A .png",85.25,245,138,"279f61548c2e93e5f380d36a8eee542d",24925.51,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FSEC-Norge-leader-Marcin-Pilat-at-Joint-All-meeting-at-Stord-for-project-Valhall-PWP-&-Hugin-A _2025-12-21T22-14-00.png","2025-12-21T22:14:05.635Z",[],[],[],[],[],[],{"id":253,"Title":254,"Slug":255,"Date":256,"Story":257,"Links":10,"createdAt":258,"updatedAt":259,"publishedAt":260,"MainVisualContent":261,"Projects":292,"Clients":293,"Countries":294,"Locations":295,"Companies":296,"Tags":297},86,"SEC Norge AS validated by Achilles Global Energy Gold – a trusted staffing partner for Norwegian shipyards and EPC companies","sec-norge-as-validated-by-achilles-global-energy-gold-a-trusted-staffing-partner-for-norwegian-shipyards-and-epc-companies","2025-02-11","SEC Norge AS is proud to announce that we have successfully completed the Achilles audit and earned the Global Energy Gold certificate. This milestone confirms our status as a pre-qualified staffing and manpower supplier for the Norwegian shipbuilding and energy sectors, operating in full compliance with international standards and the expectations of EPC contractors.\n\n**Validated Temporary Work Agency Through Achilles Global Energy**\n\nAchilles Global Energy is a leading supplier qualification platform trusted by major shipyards, oil & gas companies, and EPC contractors in Norway and across Europe. The network was created by merging Achilles JQS, FPAL, and Oil & Gas platforms into one streamlined system that allows buyers to access a verified database of high-quality suppliers.\n\nBeing part of Achilles Global Energy means that SEC Norge AS meets strict compliance, quality, and safety requirements based on standards such as:\n\n- NORSOK S006 – for health, safety, and environmental performance,\n- IOGP 423 – for responsible and ethical supplier management,\n- ESG (Environmental, Social, Governance) practices in workforce deployment and subcontracting.\n\n## Why It Matters for Shipyards and EPC Contractors in Norway\n\nFor shipyards, fabrication yards, and EPC companies involved in energy and offshore projects, selecting the right staffing partner is crucial. Our validation confirms that:\n\n- SEC Norge AS is a reliable temporary employment agency and manpower provider for welding, insulation, prefabrication, and construction roles,\n- We are audited and qualified for high-risk, high-compliance industrial environments,\n- We operate transparently, with full alignment to Norwegian labor law and EU procurement standards,\n- We help reduce procurement risk by ensuring workforce compliance, traceability, and documentation.\n\n## Benefits for Our Clients and Workforce\n\nThis validation reinforces our commitment to delivering:\n\n- Qualified and safety-trained personnel ready to support shipbuilding and industrial projects,\n- Efficient project staffing, even on short notice, with full administrative support,\n- A stable and secure working environment for our employees, who now work for an officially verified supplier recognized across the Norwegian energy and shipbuilding sectors.\n\n**SEC Norge's AchillesID: 00047418**\n\nLink: \n[Certificate Global Energy Gold for SEC Norge AS](https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FCertificate_Global-Energy_Gold_for_SEC_Norge_AS_-AchillesID_00047418_2025-04-18T10-01-25.pdf)","2025-04-18T09:56:39.086Z","2025-04-18T10:36:43.236Z","2025-04-18T10:32:27.149Z",{"id":262,"name":263,"alternativeText":263,"caption":263,"width":171,"height":264,"formats":265,"hash":287,"ext":21,"mime":24,"size":288,"url":289,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":290,"updatedAt":291},184,"SEC Norge AS Achilles Global Energy Gold Certificate.png",1448,{"large":266,"small":271,"medium":276,"thumbnail":281},{"ext":21,"url":267,"hash":268,"mime":24,"name":269,"path":10,"size":270,"width":28,"height":27},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-AS-Achilles-Global-Energy-Gold-Certificate_2025-04-18T10-32-14.png","56ca7e0d29129cb625693a7f423d4f0a","large_SEC Norge AS Achilles Global Energy Gold Certificate.png",1115.31,{"ext":21,"url":272,"hash":273,"mime":24,"name":274,"path":10,"size":275,"width":35,"height":84},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-AS-Achilles-Global-Energy-Gold-Certificate_2025-04-18T10-32-14.png","68542003aa4450190b603f22817a6442","small_SEC Norge AS Achilles Global Energy Gold Certificate.png",297.33,{"ext":21,"url":277,"hash":278,"mime":24,"name":279,"path":10,"size":280,"width":42,"height":41},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-AS-Achilles-Global-Energy-Gold-Certificate_2025-04-18T10-32-14.png","8f9d550101a42d85c213b5777e45a067","medium_SEC Norge AS Achilles Global Energy Gold Certificate.png",633.04,{"ext":21,"url":282,"hash":283,"mime":24,"name":284,"path":10,"size":285,"width":286,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-AS-Achilles-Global-Energy-Gold-Certificate_2025-04-18T10-32-12.png","bcb5f1e04138d51e054ae25ea067506f","thumbnail_SEC Norge AS Achilles Global Energy Gold Certificate.png",69.2,221,"a199d76e55607a8559aecc57ad591ff9",3342.79,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FSEC-Norge-AS-Achilles-Global-Energy-Gold-Certificate_2025-04-18T10-32-11.png","2025-04-18T10:32:14.372Z","2025-04-18T10:32:24.473Z",[],[],[],[],[],[],{"id":299,"Title":300,"Slug":301,"Date":302,"Story":303,"Links":10,"createdAt":304,"updatedAt":305,"publishedAt":306,"MainVisualContent":307,"Projects":335,"Clients":336,"Countries":337,"Locations":344,"Companies":351,"Tags":358},85,"SEC Norge AS joins NHO Service og Handel – Bemanning og Rekruttering","sec-norge-as-joins-nho-service-og-handel-bemanning-og-rekruttering","2025-01-28","We are pleased to announce that SEC Norge AS has officially become a member of NHO Service og Handel, specifically the Bemanning og Rekruttering (Staffing and Recruitment) part. This marks an important milestone in our continued growth in the Norwegian market and demonstrates our commitment to maintaining the highest standards of quality and ethics in workforce recruitment and employment.\n\n# What is NHO Service og Handel – Bemanning og Rekruttering?\n\nNHO Service og Handel is part of NHO (The Confederation of Norwegian Enterprise), the largest employers’ organization in Norway. The Bemanning og Rekruttering section brings together staffing and recruitment companies that play a vital role in the Norwegian labor market. Member companies are required to follow strict standards of compliance with Norwegian labor laws and ethical employment practices.\n\n## Why does this matter?\n### For our clients:\n- **Credibility and transparency** – membership in NHO SH is a clear signal that we operate according to Norwegian regulations and industry standards.\n- **Access to best practices** – we align with national efforts to promote fair competition and responsible staffing.\n- **Stability and compliance with collective agreements** – our workers are employed under clear and lawful terms, ensuring smooth project execution and reduced risk.\n\n### For our employees:\n- **Job security and transparent working conditions** – as a member of NHO SH, we offer contracts based on Norwegian collective agreements and regulations.\n- **Strong employer representation** – we are committed to fair, legal, and ethical employment practices that support long-term career growth.\n- **Professional development** – our membership supports continuous improvement through access to training and best practices in recruitment and HR.\n\nJoining NHO Service og Handel – Bemanning og Rekruttering is not just a mark of recognition, but a commitment to continuous improvement and responsible business practices. We are proud to be part of this organization and are more dedicated than ever to supporting our clients and employees with professionalism, quality, and integrity.","2025-04-17T10:09:54.890Z","2025-04-17T10:16:45.856Z","2025-04-17T10:12:09.108Z",{"id":308,"name":309,"alternativeText":309,"caption":309,"width":171,"height":264,"formats":310,"hash":331,"ext":21,"mime":24,"size":332,"url":333,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":334,"updatedAt":334},182,"SEC Norge AS joins NHO Service og Handel – Bemanning og Rekruttering (SEC Grupa Norway).png",{"large":311,"small":316,"medium":321,"thumbnail":326},{"ext":21,"url":312,"hash":313,"mime":24,"name":314,"path":10,"size":315,"width":28,"height":27},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-AS-joins-NHO-Service-og-Handel-–-Bemanning-og-Rekruttering-(SEC-Grupa-Norway)_2025-04-17T10-08-09.png","3aaad83acda6def77a7683532007abf8","large_SEC Norge AS joins NHO Service og Handel – Bemanning og Rekruttering (SEC Grupa Norway).png",914.18,{"ext":21,"url":317,"hash":318,"mime":24,"name":319,"path":10,"size":320,"width":35,"height":84},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-AS-joins-NHO-Service-og-Handel-–-Bemanning-og-Rekruttering-(SEC-Grupa-Norway)_2025-04-17T10-08-10.png","b08e0b4c055949620c50b3e0a3863231","small_SEC Norge AS joins NHO Service og Handel – Bemanning og Rekruttering (SEC Grupa Norway).png",246.98,{"ext":21,"url":322,"hash":323,"mime":24,"name":324,"path":10,"size":325,"width":42,"height":41},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-AS-joins-NHO-Service-og-Handel-–-Bemanning-og-Rekruttering-(SEC-Grupa-Norway)_2025-04-17T10-08-10.png","fa33272049a043080dbe8c2d0026f994","medium_SEC Norge AS joins NHO Service og Handel – Bemanning og Rekruttering (SEC Grupa Norway).png",521.49,{"ext":21,"url":327,"hash":328,"mime":24,"name":329,"path":10,"size":330,"width":286,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-AS-joins-NHO-Service-og-Handel-–-Bemanning-og-Rekruttering-(SEC-Grupa-Norway)_2025-04-17T10-08-07.png","57929fc93162dd02bccfc00c444e6a60","thumbnail_SEC Norge AS joins NHO Service og Handel – Bemanning og Rekruttering (SEC Grupa Norway).png",59.01,"61db184b77a198f664f23b95705f4324",2774.86,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FSEC-Norge-AS-joins-NHO-Service-og-Handel-–-Bemanning-og-Rekruttering-(SEC-Grupa-Norway)_2025-04-17T10-08-07.png","2025-04-17T10:08:10.197Z",[],[],[338],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},6,"Norway","2022-04-19T10:07:22.099Z","2022-04-19T10:07:22.890Z","2022-04-19T10:07:22.888Z",[345],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},15,"Stord","2022-04-19T10:03:17.327Z","2022-04-19T10:03:17.903Z","2022-04-19T10:03:17.900Z",[352],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},3,"SEC Norge AS","2022-04-19T08:45:05.104Z","2022-04-19T08:45:06.256Z","2022-04-19T08:45:06.251Z",[359],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},2,"Announcement","2022-04-19T08:20:24.308Z","2022-04-19T08:20:25.115Z","2022-04-19T08:20:25.112Z",{"id":366,"Title":367,"Slug":368,"Date":369,"Story":370,"Links":10,"createdAt":371,"updatedAt":372,"publishedAt":373,"MainVisualContent":374,"Projects":404,"Clients":405,"Countries":406,"Locations":407,"Companies":408,"Tags":409},84,"Thank you for an incredible 2024","thank-you-for-an-incredible-2024","2024-12-19","2024 has been an incredible year of growth and development for us! Thanks to the dedication and hard work of our team, we’ve achieved many outstanding goals.\n\n\nWe want to extend our heartfelt **thanks to all 627 people of SEC Team** for their daily commitment, professionalism, and contributions to our shared success. It’s because of you that we can tackle any challenge and look to the future with confidence.\n\n\nWe would also like to express our gratitude to our most valued clients: _Aker Solutions, Westcon Yards AS, Minimax GmbH,_ and all our partners for trusting us and allowing us to grow together. Your collaboration and support are the foundation of our success.\n\n\nAs the holiday season approaches, we wish you joy, peace, and unforgettable moments with your loved ones, as well as a successful and exciting 2025!\n\n\nTogether, we can achieve even more! #peoplecocreatevalue","2024-12-19T11:34:46.707Z","2024-12-19T11:34:48.218Z","2024-12-19T11:34:48.215Z",{"id":375,"name":376,"alternativeText":376,"caption":377,"width":171,"height":264,"formats":378,"hash":399,"ext":21,"mime":24,"size":400,"url":401,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":402,"updatedAt":403},180,"Best whishes for 2025 from SEC Grupa.png","Best whishes for 2025 from SEC Grupa",{"large":379,"small":384,"medium":389,"thumbnail":394},{"ext":21,"url":380,"hash":381,"mime":24,"name":382,"path":10,"size":383,"width":28,"height":27},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Kartka-świąteczna-2024---UK_2024-12-19T11-34-01.png","83f05169790945dcb2583b23a44c5b3b","large_Kartka świąteczna 2024 - UK.png",1261.82,{"ext":21,"url":385,"hash":386,"mime":24,"name":387,"path":10,"size":388,"width":35,"height":84},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Kartka-świąteczna-2024---UK_2024-12-19T11-34-01.png","2496f0ef5e94361aa408a4cdb15f25a1","small_Kartka świąteczna 2024 - UK.png",314.37,{"ext":21,"url":390,"hash":391,"mime":24,"name":392,"path":10,"size":393,"width":42,"height":41},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Kartka-świąteczna-2024---UK_2024-12-19T11-34-01.png","48d7658b5f6e13ac3a2face8d18c0fb0","medium_Kartka świąteczna 2024 - UK.png",712.22,{"ext":21,"url":395,"hash":396,"mime":24,"name":397,"path":10,"size":398,"width":286,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Kartka-świąteczna-2024---UK_2024-12-19T11-33-58.png","b1cfd3e8c9ed24f53cebb1d63f813c41","thumbnail_Kartka świąteczna 2024 - UK.png",64.36,"2abbcf954cea0253e4183ca21c396949",3962.71,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FKartka-świąteczna-2024---UK_2024-12-19T11-33-57.png","2024-12-19T11:34:01.390Z","2024-12-19T11:34:42.554Z",[],[],[],[],[],[],{"id":411,"Title":412,"Slug":413,"Date":414,"Story":415,"Links":10,"createdAt":416,"updatedAt":417,"publishedAt":418,"MainVisualContent":419,"Projects":453,"Clients":454,"Countries":455,"Locations":456,"Companies":457,"Tags":458},83,"Preparing for the offshore phase: our journey with the Johan Castberg Project","preparing-for-the-offshore-phase-our-journey-with-the-johan-castberg-project","2024-08-26","As we gear up for the offshore phase of the Johan Castberg project, our insulation teams are ready to take on new challenges in the Barents Sea. But before we look ahead, it’s important to reflect on the incredible journey we’ve had so far and celebrate the remarkable contributions of our team.\n\n## The Journey So Far\n\nThe Johan Castberg project has been a monumental endeavor, and we’re proud to have played role in its success. Over the past 4 years, our team has been deeply involved in the prefabrication, installation, and sea trial phases at Aker Solutions' yard, contributing to one of the most significant energy projects in recent years.\n\nOur involvement spanned multiple disciplines, bringing together a diverse team of specialists to tackle the various challenges presented by this complex project. In total, 327 skilled professionals from our company worked tirelessly to ensure every aspect of our contribution met the highest standards.\n\nHere’s a closer look at the manpower and expertise we brought to the table:\n- 121 Insulation specialists, including 35 focused on prefabrication and survey\n- 108 Scaffolding specialists\n- 82 Welding specialists\n- 8 HSSE Advisors who maintained the highest health, safety, security, and environmental standards\n- 8 Surface treatment specialists, including engineers and foremen\n\nAmong these, 51 engineers, inspectors, and shift leaders provided expert oversight, while 39 foremen led teams across various disciplines, ensuring that our operations were smooth and efficient. Together, this dedicated team committed a staggering 1.79 million man-hours to the project.\n\n## Looking Ahead: The Offshore Phase\n\nAs Johan Castberg sets sail for its final destination in the Barents Sea, our work is far from over. The offshore phase presents new challenges and opportunities for our insulation teams and engineers, who are now preparing to ensure that the FPSO (Floating Production, Storage, and Offloading) unit operates safely and efficiently in one of the world’s most challenging environments.\nThe transition from the yard to the sea is a critical phase in any offshore project, and our team is ready to bring the same level of commitment and expertise that we have demonstrated throughout the project. Our focus will be on maintaining the integrity of the insulation systems, ensuring that they perform optimally in the harsh Arctic conditions.\n\n## A Heartfelt Thank You to Our Team\n\nNone of this would have been possible without the dedication and hard work of our incredible team. Your commitment to excellence, safety, and teamwork has been the backbone of our success on this project. Each one of you has played a crucial role in bringing the Johan Castberg FPSO to life, and we couldn’t be prouder of what we’ve accomplished together.\n\n## Gratitude to Our Partners\n\nWe also want to extend our deepest thanks to Aker Solutions and Equinor for their trust and collaboration throughout this journey. It has been an honor to work alongside such esteemed partners on a project of this scale and importance. Your support has been invaluable, and we look forward to continuing our work together as the project moves offshore.\n\n## Continuing the Journey\n\nAs Johan Castberg makes its way to the Barents Sea, we remain committed to delivering exceptional results. The next phase of this journey is just beginning, and we are excited to see what we can achieve together.\n\nTo our team—thank you for your unwavering dedication and for being the driving force behind our success. And to our partners and clients—thank you for your continued trust in our capabilities. Together, we are making history, one milestone at a time.","2024-08-26T08:05:38.153Z","2024-08-26T08:05:51.705Z","2024-08-26T08:05:51.700Z",{"id":420,"name":421,"alternativeText":421,"caption":421,"width":422,"height":423,"formats":424,"hash":449,"ext":123,"mime":126,"size":450,"url":451,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":452,"updatedAt":452},179,"SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea.jpg",4000,1848,{"large":425,"small":431,"medium":437,"thumbnail":443},{"ext":123,"url":426,"hash":427,"mime":126,"name":428,"path":10,"size":429,"width":28,"height":430},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea_2024-08-26T07-58-50.jpg","ecf631d8f7ffe59e0472208db287bdc5","large_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea.jpg",80.18,462,{"ext":123,"url":432,"hash":433,"mime":126,"name":434,"path":10,"size":435,"width":35,"height":436},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea_2024-08-26T07-58-51.jpg","e76d5ce81b945760515e1916a16fde9c","small_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea.jpg",23.69,231,{"ext":123,"url":438,"hash":439,"mime":126,"name":440,"path":10,"size":441,"width":42,"height":442},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea_2024-08-26T07-58-51.jpg","dc200afbde11a24fcedca0faa4fcf2d7","medium_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea.jpg",47.75,347,{"ext":123,"url":444,"hash":445,"mime":126,"name":446,"path":10,"size":447,"width":240,"height":448},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea_2024-08-26T07-58-50.jpg","83f2811109ae9c86d0c7a2fefa189ebe","thumbnail_SEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea.jpg",7.18,113,"db4be079e453266b879121467263f737",2364.97,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FSEC-Norge-Johan-Castberg-go-for-offshore-phase-on-the-barents-sea_2024-08-26T07-58-49.jpg","2024-08-26T07:58:51.129Z",[],[],[],[],[],[],{"id":460,"Title":461,"Slug":462,"Date":463,"Story":464,"Links":10,"createdAt":465,"updatedAt":466,"publishedAt":467,"MainVisualContent":468,"Projects":496,"Clients":497,"Countries":498,"Locations":499,"Companies":500,"Tags":501},82,"Happy Easter 2024!","happy-easter-2024","2024-03-27","Wishing everyone a blessed Easter filled with joy, and a season blooming with happiness and prosperity! 🐰🌷","2024-03-28T07:14:16.308Z","2024-03-28T07:14:19.644Z","2024-03-28T07:14:19.634Z",{"id":469,"name":470,"alternativeText":470,"caption":470,"width":171,"height":264,"formats":471,"hash":492,"ext":21,"mime":24,"size":493,"url":494,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":495,"updatedAt":495},178,"Wishes of joyful and happy Easter holidays from SEC Grupa to all of you.png",{"large":472,"small":477,"medium":482,"thumbnail":487},{"ext":21,"url":473,"hash":474,"mime":24,"name":475,"path":10,"size":476,"width":28,"height":27},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Wishes-of-joyful-and-happy-Easter-holidays-from-SEC-Grupa-to-all-of-you_2024-03-28T07-06-23.png","fc5dba4aaeefd23a6edbf1485f0031e5","large_Wishes of joyful and happy Easter holidays from SEC Grupa to all of you.png",913.61,{"ext":21,"url":478,"hash":479,"mime":24,"name":480,"path":10,"size":481,"width":35,"height":84},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Wishes-of-joyful-and-happy-Easter-holidays-from-SEC-Grupa-to-all-of-you_2024-03-28T07-06-23.png","7a379c1ee867d4106ec2fa2381870818","small_Wishes of joyful and happy Easter holidays from SEC Grupa to all of you.png",231.96,{"ext":21,"url":483,"hash":484,"mime":24,"name":485,"path":10,"size":486,"width":42,"height":41},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Wishes-of-joyful-and-happy-Easter-holidays-from-SEC-Grupa-to-all-of-you_2024-03-28T07-06-23.png","36efeebab80d737955b661825bc11235","medium_Wishes of joyful and happy Easter holidays from SEC Grupa to all of you.png",517.72,{"ext":21,"url":488,"hash":489,"mime":24,"name":490,"path":10,"size":491,"width":286,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Wishes-of-joyful-and-happy-Easter-holidays-from-SEC-Grupa-to-all-of-you_2024-03-28T07-06-18.png","539ce90067546ccd612bf1c6168f0f35","thumbnail_Wishes of joyful and happy Easter holidays from SEC Grupa to all of you.png",49.23,"a6c6d1b80aff881a02dff584fff64fa5",2708.11,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FWishes-of-joyful-and-happy-Easter-holidays-from-SEC-Grupa-to-all-of-you_2024-03-28T07-06-17.png","2024-03-28T07:06:23.646Z",[],[],[],[],[],[],{"id":503,"Title":504,"Slug":505,"Date":506,"Story":507,"Links":10,"createdAt":508,"updatedAt":509,"publishedAt":510,"MainVisualContent":511,"Projects":541,"Clients":542,"Countries":543,"Locations":556,"Companies":557,"Tags":582},81,"Christmas wishes '23 and a happy New Year 2024!","christmas-wishes-23-and-a-happy-new-year-2024","2023-12-28","Wishing everyone a joyful Christmas filled with warmth and a New Year brimming with success, good health, and prosperity!\n\nWe are grateful for a wonderful year with our amazing team and valued clients! Thank you for making 2023 fantastic! 🎄","2023-12-22T10:14:42.120Z","2023-12-22T10:20:14.974Z","2023-12-22T10:16:16.029Z",{"id":512,"name":513,"alternativeText":513,"caption":513,"width":514,"height":515,"formats":516,"hash":537,"ext":21,"mime":24,"size":538,"url":539,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":540,"updatedAt":540},176,"Kartka świąteczna 2023 - UK.png",1024,724,{"large":517,"small":522,"medium":527,"thumbnail":532},{"ext":21,"url":518,"hash":519,"mime":24,"name":520,"path":10,"size":521,"width":28,"height":27},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Kartka-świąteczna-2023---UK_2023-12-22T10-12-18.png","f561f3fd0af33dece5782c860a163776","large_Kartka świąteczna 2023 - UK.png",1235.86,{"ext":21,"url":523,"hash":524,"mime":24,"name":525,"path":10,"size":526,"width":35,"height":84},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Kartka-świąteczna-2023---UK_2023-12-22T10-12-18.png","5223f024309c9cb2d5a9544373cadd5b","small_Kartka świąteczna 2023 - UK.png",300.37,{"ext":21,"url":528,"hash":529,"mime":24,"name":530,"path":10,"size":531,"width":42,"height":41},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Kartka-świąteczna-2023---UK_2023-12-22T10-12-18.png","eb55ac0cf7da04df4c1b5ebd5df1e2e1","medium_Kartka świąteczna 2023 - UK.png",681.9,{"ext":21,"url":533,"hash":534,"mime":24,"name":535,"path":10,"size":536,"width":286,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Kartka-świąteczna-2023---UK_2023-12-22T10-12-16.png","92c39120cb2d9059b1ab0dcb97804168","thumbnail_Kartka świąteczna 2023 - UK.png",63.33,"b38bd852eaf992d0e8163af708f9670e",1083.04,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FKartka-świąteczna-2023---UK_2023-12-22T10-12-15.png","2023-12-22T10:12:18.912Z",[],[],[544,549,550],{"id":353,"Country":545,"createdAt":546,"updatedAt":547,"publishedAt":548},"Germany","2022-04-19T10:05:26.327Z","2022-04-19T10:05:27.135Z","2022-04-19T10:05:27.133Z",{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},7,"Poland","2022-04-19T10:07:53.865Z","2022-04-19T10:07:54.662Z","2022-04-19T10:07:54.659Z",[],[558,564,565,571,576],{"id":559,"SEC":560,"createdAt":561,"updatedAt":562,"publishedAt":563},1,"SEC Sp. z o. o.","2022-04-19T08:44:38.140Z","2022-04-19T08:44:39.989Z","2022-04-19T08:44:39.985Z",{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},{"id":566,"SEC":567,"createdAt":568,"updatedAt":569,"publishedAt":570},5,"SEC GB&NI Ltd.","2022-04-19T08:46:11.819Z","2022-04-19T08:46:12.468Z","2022-04-19T08:46:12.464Z",{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},"SEC Pomorze Sp. z o. o.","2022-04-19T08:44:52.670Z","2022-04-19T08:44:53.953Z","2022-04-19T08:44:53.948Z",{"id":577,"SEC":578,"createdAt":579,"updatedAt":580,"publishedAt":581},4,"SEC Operations Sp. z o. o.","2022-04-19T08:45:52.637Z","2022-04-19T08:45:53.524Z","2022-04-19T08:45:53.521Z",[583],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":585,"Title":586,"Slug":587,"Date":588,"Story":589,"Links":10,"createdAt":590,"updatedAt":591,"publishedAt":592,"MainVisualContent":593,"Projects":625,"Clients":638,"Countries":644,"Locations":646,"Companies":653,"Tags":655},79,"Installation works at The Kollsnes Processing Plant","installation-works-at-the-kollsnes-processing-plant","2023-01-08","Last year, as part of our continued efforts to co-create value for our Clients, SEC Norge AS took on the challenge of supplying the necessary piping prefabrication, thermal insulation and welding proffesionals for the Kollsnes project, carred by Aker Solutions at Stord yard.\n\nIn 2023, we were awarded the task of suppling inssulation teams to the Kollsnes Gas Processing Plant for the installation phase of the project. This highlights the continued efforts and commitment of SEC Norge AS in delivering high-quality work for the Kollsnes project.\n\nThe Kollsnes processing plant processes natural gas from the Troll, Kvitebjørn, Visund, and Fram fields. It has a daily processing capacity of 144.5 million cubic meters and plays a significant role in exporting Norwegian gas to Europe, with 40% of exports going through this facility. \n\nThe compressed gas is transported to various destinations in Europe through four trunklines - Statpipe, Zeepipe, Europipe I, and Franpipe. These trunklines export the gas to France, Netherlands, Belgium, Germany, Czech Republic, Austria, and Spain.\n\nThe NGL (natural gas liquids) is separated from the gas at Kollsnes and the dry gas is compressed before being delivered via pipeline systems. In 1999, the Kvitebjørn field was connected to Kollsnes and a new NGL extraction plant was built to process the rich gas. The new plant became operational in 2004 and can also process gas from the Visund field, which was connected to Kollsnes in 2005. The Vestprosess pipeline connects Kollsnes to Mongstad, where the wet gas is fractioned into propane, butane, and naphtha. \n\nKollsnes is owned by Gassled and operated by Gassco, with Equinor as the technical operator.","2023-02-02T10:54:53.906Z","2023-02-03T13:03:15.465Z","2023-02-02T11:54:23.239Z",{"id":594,"name":595,"alternativeText":595,"caption":595,"width":596,"height":597,"formats":598,"hash":621,"ext":21,"mime":24,"size":622,"url":623,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":624,"updatedAt":624},173,"Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge.png",926,1308,{"large":599,"small":605,"medium":610,"thumbnail":615},{"ext":21,"url":600,"hash":601,"mime":24,"name":602,"path":10,"size":603,"width":604,"height":28},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge_2023-02-02T10-51-00.png","2ec967d72578ba8e71027a271489af2b","large_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge.png",171.42,708,{"ext":21,"url":606,"hash":607,"mime":24,"name":608,"path":10,"size":609,"width":84,"height":35},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge_2023-02-02T10-51-00.png","7be702ef81cf0e3f96d0f291eaed94ee","small_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge.png",56.49,{"ext":21,"url":611,"hash":612,"mime":24,"name":613,"path":10,"size":614,"width":90,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge_2023-02-02T10-51-00.png","d20d43caca58cb4c5dc431762cb4e738","medium_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge.png",109.97,{"ext":21,"url":616,"hash":617,"mime":24,"name":618,"path":10,"size":619,"width":620,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge_2023-02-02T10-50-59.png","57a001182a00a8cbac1ea2d50f78b1c8","thumbnail_Reference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge.png",8.49,111,"e6e0fb083702a95203f3745a8b197b45",134.24,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FReference-2016---2022_Aker-Solutions-AS-Stord_Welding_(Nyhamna,-Aasta-Hansteen,-Johan-Sverdrup,-Njord-Future,-Johan-Castberg,-Kollsnes)---SEC-Norge_2023-02-02T10-50-58.png","2023-02-02T10:51:00.964Z",[626,632],{"id":627,"Project":628,"createdAt":629,"updatedAt":630,"publishedAt":631},29,"Kollsnes","2022-06-01T11:25:15.287Z","2022-06-01T11:25:16.134Z","2022-06-01T11:25:16.129Z",{"id":633,"Project":634,"createdAt":635,"updatedAt":636,"publishedAt":637},34,"Kollsnes Processing Plant - Installation","2023-02-02T10:55:11.345Z","2023-02-02T10:57:52.364Z","2023-02-02T10:57:52.361Z",[639],{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},"Aker Solutions","2022-04-19T09:57:26.242Z","2022-04-19T09:57:26.972Z","2022-04-19T09:57:26.969Z",[645],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[647],{"id":648,"Location":649,"createdAt":650,"updatedAt":651,"publishedAt":652},21,"Oøy","2023-02-02T11:00:56.758Z","2023-02-02T11:00:57.550Z","2023-02-02T11:00:57.547Z",[654],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[656,662,668,674,679],{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},25,"Pipe prefabrication","2022-04-19T08:27:12.538Z","2022-04-19T08:27:13.648Z","2022-04-19T08:27:13.644Z",{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},10,"Welding","2022-04-19T08:22:16.519Z","2022-04-19T08:22:17.441Z","2022-04-19T08:22:17.436Z",{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},13,"Supervision","2022-04-19T08:22:46.120Z","2022-04-19T08:22:46.763Z","2022-04-19T08:22:46.760Z",{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},"Industrial Insulation","2022-04-19T08:21:28.874Z","2022-04-19T08:21:29.698Z","2022-04-19T08:21:29.695Z",{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},26,"Piping","2022-04-19T08:27:35.113Z","2022-04-19T08:27:35.998Z","2022-04-19T08:27:35.995Z",{"id":686,"Title":687,"Slug":688,"Date":689,"Story":690,"Links":10,"createdAt":691,"updatedAt":692,"publishedAt":693,"MainVisualContent":694,"Projects":724,"Clients":725,"Countries":726,"Locations":728,"Companies":734,"Tags":739},80,"SEC Grupa commitment to helping others: Our part in Szlachetna Paczka XXII Edition","sec-grupa-commitment-to-helping-others-our-part-in-szlachetna-paczka-xxii-edition","2022-12-11","At SEC, we believe that helping others has immense value and that sharing kindness multiplies goodness. That's why we encourage our employees to help those in need and once again organized a a charity collection as part of the Szlachetna Paczka campaign.\n\nThe Szlachetna Paczka is not only immediate material assistance, it is also a sign of care and acceptance that gives the recipient a sense of belonging and faith that positive changes are possible. \n\nThis year, our gifts went to a lonely pensioner from the Pomeranian voivodeship who lacked basic necessities for everyday functioning. The needs turned out to be really great, but thanks to the collective collection and full commitment of the team, we were able to fulfill them all!\n\nWe sincerely hope that our help in the Szlachetna Paczka was helpful and will bring relief in everyday functioning.","2023-02-03T13:10:58.247Z","2023-02-03T13:18:11.780Z","2023-02-03T13:14:18.475Z",{"id":695,"name":696,"alternativeText":696,"caption":696,"width":697,"height":698,"formats":699,"hash":720,"ext":123,"mime":126,"size":721,"url":722,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":723,"updatedAt":723},174,"Podziękowania dla firmy SEC Pomorze za udział w Szlachetnej Paczce 2022.jpg",4960,7015,{"large":700,"small":705,"medium":710,"thumbnail":715},{"ext":123,"url":701,"hash":702,"mime":126,"name":703,"path":10,"size":704,"width":27,"height":28},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Podziękowania-dla-firmy-SEC-Pomorze-za-udział-w-Szlachetnej-Paczce-2022_2023-02-03T13-14-00.jpg","8ae42007d058e5bd291277c45252ae15","large_Podziękowania dla firmy SEC Pomorze za udział w Szlachetnej Paczce 2022.jpg",99.81,{"ext":123,"url":706,"hash":707,"mime":126,"name":708,"path":10,"size":709,"width":84,"height":35},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Podziękowania-dla-firmy-SEC-Pomorze-za-udział-w-Szlachetnej-Paczce-2022_2023-02-03T13-14-00.jpg","8f7d50a86a2b4fbb6c3b0de7b24797a5","small_Podziękowania dla firmy SEC Pomorze za udział w Szlachetnej Paczce 2022.jpg",35.95,{"ext":123,"url":711,"hash":712,"mime":126,"name":713,"path":10,"size":714,"width":90,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Podziękowania-dla-firmy-SEC-Pomorze-za-udział-w-Szlachetnej-Paczce-2022_2023-02-03T13-14-00.jpg","04306a21b47f0227fba21984163774f3","medium_Podziękowania dla firmy SEC Pomorze za udział w Szlachetnej Paczce 2022.jpg",63.75,{"ext":123,"url":716,"hash":717,"mime":126,"name":718,"path":10,"size":719,"width":48,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Podziękowania-dla-firmy-SEC-Pomorze-za-udział-w-Szlachetnej-Paczce-2022_2023-02-03T13-13-59.jpg","3b51c7920f80a0611352eae9c35d3f9e","thumbnail_Podziękowania dla firmy SEC Pomorze za udział w Szlachetnej Paczce 2022.jpg",5.96,"aa54feb95e3cff7fb5ab3ebb94bd31f1",3746.16,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FPodziękowania-dla-firmy-SEC-Pomorze-za-udział-w-Szlachetnej-Paczce-2022_2023-02-03T13-13-58.jpg","2023-02-03T13:14:00.253Z",[],[],[727],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[729],{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},"Gdańsk","2022-04-19T10:01:18.508Z","2022-04-19T10:01:19.460Z","2022-04-19T10:01:19.457Z",[735,736,737,738],{"id":577,"SEC":578,"createdAt":579,"updatedAt":580,"publishedAt":581},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},{"id":559,"SEC":560,"createdAt":561,"updatedAt":562,"publishedAt":563},{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[],{"id":741,"Title":742,"Slug":743,"Date":744,"Story":745,"Links":10,"createdAt":746,"updatedAt":747,"publishedAt":748,"MainVisualContent":749,"Projects":780,"Clients":781,"Countries":782,"Locations":784,"Companies":786,"Tags":788},77,"Insulation and Welding Training Center","insulation-and-welding-training-center","2022-06-08","Part of SEC core values are to maintain the highest quality services and constant growth of staff skill set. Therefore, we are more than happy to announce that we have just opened in Gdańsk new Training and Testing Facility dedicated to welding and thermal insulation. The operator of the training centre will be SEC Operation Sp. z o.o. located in the industrial area of Twarda 12, Gdańsk 80-871 Poland.\n\nA specialized facility suited to train people in the field of insulation and welding is 250 square metres large. Divined into 3 main areas, with 160 metres being dedicated to the Insulation workshop, 80 metres for the welding workshop, and a fully equipped social area including a canteen, lockers and showers.\n\nThe welding training centre has 4 fully equipped welding stations with MIG\u002FMAG and TIG machines, welding tables, ventilation and all needed tooling. Additionally, for grooving and cutting activities, we have prepared a safe outdoor area. The stands are prepared to carry out tests on a wide range of materials, from carbon and stainless steel to aluminium and titanium. We also have a ventilated welding warehouse with active temperature and humidity control to ensure the proper storage of welding materials.\n\nThe insulation part contains 3 areas. Training area with 5 insulation stands designed for NORSOK training level standards. Each stand has dedicated ventilation and a fully equipped tooling box. Secound insulation area is an isolated, well-ventilated room dedicated to cutting and modelling high-dusting materials such as Pyrogel. This means that trainees can learn how to cut and install high-performance insulating material safely and correctly. Lastly but equally important, the Insulation warehouse that is suited to storage materials such us: Pyrogel, Ka-flex, Armaflex, foamglas and stainless steel boxes.\n\nSoon, the first SEC employees will be able to undergo training in our training facility preparing for new projects.","2022-06-08T12:52:07.490Z","2023-05-15T18:45:08.403Z","2022-06-08T13:08:00.556Z",{"id":750,"name":751,"alternativeText":751,"caption":751,"width":752,"height":753,"formats":754,"hash":776,"ext":123,"mime":126,"size":777,"url":778,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":779,"updatedAt":779},124,"20220607_122137.jpg",4608,3456,{"large":755,"small":760,"medium":765,"thumbnail":770},{"ext":123,"url":756,"hash":757,"mime":126,"name":758,"path":10,"size":759,"width":28,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_20220607_122137_2022-06-08T13-03-19.jpg","5f413bd1466fed02f1da9ae60844e890","large_20220607_122137.jpg",72.2,{"ext":123,"url":761,"hash":762,"mime":126,"name":763,"path":10,"size":764,"width":35,"height":183},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_20220607_122137_2022-06-08T13-03-19.jpg","994957ba13d3501ad4bf9ee24b6a04f5","small_20220607_122137.jpg",22.63,{"ext":123,"url":766,"hash":767,"mime":126,"name":768,"path":10,"size":769,"width":42,"height":129},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_20220607_122137_2022-06-08T13-03-19.jpg","8636d0713405432082e56c6dad09a99e","medium_20220607_122137.jpg",44.87,{"ext":123,"url":771,"hash":772,"mime":126,"name":773,"path":10,"size":774,"width":775,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_20220607_122137_2022-06-08T13-03-18.jpg","2e8517a1c2f4ea1df69980252b38fce1","thumbnail_20220607_122137.jpg",5.68,208,"830572a5d7e6af5568d45363275f6377",2884.36,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002F20220607_122137_2022-06-08T13-03-17.jpg","2022-06-08T13:03:19.148Z",[],[],[783],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[785],{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[787],{"id":577,"SEC":578,"createdAt":579,"updatedAt":580,"publishedAt":581},[789,790,791],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},"Fitting and assembling","2022-04-19T08:21:18.424Z","2022-04-19T08:21:19.165Z","2022-04-19T08:21:19.161Z",{"id":797,"Title":798,"Slug":799,"Date":800,"Story":801,"Links":10,"createdAt":802,"updatedAt":803,"publishedAt":804,"MainVisualContent":805,"Projects":840,"Clients":847,"Countries":849,"Locations":851,"Companies":853,"Tags":855},78,"The Johan Castberg hull arrived at Stord","the-johan-castberg-hull-is-arrived-at-stord","2022-04-12","Last Saturday (09.04.2022), the hull of Johan Castberg FPSO finally arrived at Stord. The hull was transported from the yard in Singapore to Stord by the giant transportation vessel the Boskalis. The Johan Castberg FPSO vessel will be one of the world’s most advanced floating production, storage and offloading vessel.\n\nThe Norwegian part of Equinor's Johan Castberg FPSO project is handled by Aker Solutions. We are pleased that we, as SEC Norge, are involved in this project thanks to our cooperation with Aker Solutions since 2017 and the first pre-fabrication works.\n\nThe new phase of the project is set to begin with the heavy lift operations, which will take place from April to June. All of the modules and the lower turret will be lifted onto the hull during this time. After all of the modules are in place, the last part of the turret will be installed. Integration and hook up will start immediately after the lifting of modules is finished.\n\nThis phase of assembly and installation work will be supported also by SEC specialists in fields like engineering, thermal insulation, scaffolding, welding and assembly. Which we are extremely proud of.","2022-06-30T08:53:45.776Z","2022-06-30T10:46:48.185Z","2022-06-30T10:42:37.221Z",{"id":806,"name":807,"alternativeText":808,"caption":808,"width":171,"height":809,"formats":810,"hash":836,"ext":812,"mime":126,"size":837,"url":838,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":839,"updatedAt":839},171,"SEC Norge insulation operator in front of Johan Castberg FPSO hull in Stord.jpeg","SEC Norge insulation operator in front of Johan Castberg FPSO hull in Stord",1105,{"large":811,"small":818,"medium":824,"thumbnail":830},{"ext":812,"url":813,"hash":814,"mime":126,"name":815,"path":10,"size":816,"width":28,"height":817},".jpeg","https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-insulation-operator-in-front-of-Johan-Castberg-FPSO-hull-in-Stord_2022-06-30T08-58-16.jpeg","8b9b87528dbe6c9c47ec0b1361e2891e","large_SEC Norge insulation operator in front of Johan Castberg FPSO hull in Stord.jpeg",69.71,540,{"ext":812,"url":819,"hash":820,"mime":126,"name":821,"path":10,"size":822,"width":35,"height":823},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-insulation-operator-in-front-of-Johan-Castberg-FPSO-hull-in-Stord_2022-06-30T08-58-16.jpeg","90926ab111582b2a527c9a8d8b4f2cb5","small_SEC Norge insulation operator in front of Johan Castberg FPSO hull in Stord.jpeg",21.83,270,{"ext":812,"url":825,"hash":826,"mime":126,"name":827,"path":10,"size":828,"width":42,"height":829},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-insulation-operator-in-front-of-Johan-Castberg-FPSO-hull-in-Stord_2022-06-30T08-58-16.jpeg","32bd2a22fc3959a1808fd1356160ce35","medium_SEC Norge insulation operator in front of Johan Castberg FPSO hull in Stord.jpeg",43.04,405,{"ext":812,"url":831,"hash":832,"mime":126,"name":833,"path":10,"size":834,"width":240,"height":835},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-insulation-operator-in-front-of-Johan-Castberg-FPSO-hull-in-Stord_2022-06-30T08-58-16.jpeg","98eabb8f44aaf25379cfbb07eb739cad","thumbnail_SEC Norge insulation operator in front of Johan Castberg FPSO hull in Stord.jpeg",7.14,132,"44f239cbf18f01bd94170e2cdf69cfcf",146.72,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FSEC-Norge-insulation-operator-in-front-of-Johan-Castberg-FPSO-hull-in-Stord_2022-06-30T08-58-16.jpeg","2022-06-30T08:58:16.721Z",[841],{"id":842,"Project":843,"createdAt":844,"updatedAt":845,"publishedAt":846},17,"Johan Castberg FPSO Hull","2022-04-19T08:41:58.173Z","2022-04-19T08:42:17.038Z","2022-04-19T08:42:17.035Z",[848],{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},[850],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[852],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[854],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[856,857,863,864,865],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},8,"Scaffolding","2022-04-19T08:21:40.700Z","2022-04-19T08:21:41.522Z","2022-04-19T08:21:41.520Z",{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":867,"Title":868,"Slug":869,"Date":870,"Story":871,"Links":872,"createdAt":873,"updatedAt":874,"publishedAt":875,"MainVisualContent":876,"Projects":906,"Clients":918,"Countries":925,"Locations":927,"Companies":935,"Tags":937},76,"Celebration of Njord A and the Sea Trail","celebration-of-njord-a-and-the-sea-trail","2022-02-19","It is with great pride and joy that we were part of renovation project of the Njord A platform. Today, Njord A is finally completed and is now ready for its next phase of operations, which will include a sea trial before it returns to its normal duties in the Norwegian Sea. \n\nThis has been a massive project, with construction and prefabrication taking place at Aker Solutions yards at Stord and Verdal. SEC Norge AS, among other suppliers, was part of this journey since 2017. A refurbishment and conversion project of this size and complexity is no easy feat, especially amidst a pandemic where sanitary regimes are of utmost importance. We are proud that we were able to carry out the project together as a team. Our staff have demonstrated true professionalism and dedication over the years, especially during the last two most difficult years. We are truly grateful for their hard work and commitment.\n\nOver the course of the five-year Njord A Future project, SEC Norge has supplied more than 300 professionals from various disciplines, including thermal insulation, scaffolding, and welding. These include skilled thermal insulation and insulation prefabrication operators, insulation work preparation personnel, insulation shift leaders and foremen, insulation survey and box measurement specialists, as well as QC inspectors and engineers. We have also supplied scaffolding fitters and foremen, TIG\u002FFCAW welders, piping and structural and fitters, foreman and shift leaders. That is why we are just as happy that our staff will also be able to participate in the sea trial phase.\n\nAfter the sea trial, the Njord A platform will be ready for another 20 years of safe and efficient operation. And will return to its original location in the Norwegian Sea, about 150 km west of Kristiansund where was operating since 1997.","[Aker Solutions delivers Njord A Platform](https:\u002F\u002Fwww.akersolutions.com\u002Fnews\u002Fnews-archive\u002F2022\u002Faker-solutions-delivers-njord-a-platform\u002F)","2022-06-07T09:55:19.724Z","2022-06-07T09:55:22.685Z","2022-06-07T09:55:22.678Z",{"id":877,"name":878,"alternativeText":878,"caption":878,"width":879,"height":880,"formats":881,"hash":902,"ext":123,"mime":126,"size":903,"url":904,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":905,"updatedAt":905},120,"Njord A Future Project - begining og the sea trial 20.02.2022 Stord - Aker Solutions - SEC Norge.jpg",3024,4032,{"large":882,"small":887,"medium":892,"thumbnail":897},{"ext":123,"url":883,"hash":884,"mime":126,"name":885,"path":10,"size":886,"width":42,"height":28},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Flarge_Njord-A-Future-Project---begining-og-the-sea-trial-20.02.2022-Stord---Aker-Solutions---SEC-Norge_2022-06-07T09-50-49.jpg","57561c6eaffbfa59554e4d7eec3bdead","large_Njord A Future Project - begining og the sea trial 20.02.2022 Stord - Aker Solutions - SEC Norge.jpg",157.04,{"ext":123,"url":888,"hash":889,"mime":126,"name":890,"path":10,"size":891,"width":183,"height":35},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fsmall_Njord-A-Future-Project---begining-og-the-sea-trial-20.02.2022-Stord---Aker-Solutions---SEC-Norge_2022-06-07T09-50-49.jpg","5cad10113819d3552349bacb4bac9628","small_Njord A Future Project - begining og the sea trial 20.02.2022 Stord - Aker Solutions - SEC Norge.jpg",44.31,{"ext":123,"url":893,"hash":894,"mime":126,"name":895,"path":10,"size":896,"width":129,"height":42},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fmedium_Njord-A-Future-Project---begining-og-the-sea-trial-20.02.2022-Stord---Aker-Solutions---SEC-Norge_2022-06-07T09-50-49.jpg","6da2e313f209fffb49494f0cf404bdae","medium_Njord A Future Project - begining og the sea trial 20.02.2022 Stord - Aker Solutions - SEC Norge.jpg",92.06,{"ext":123,"url":898,"hash":899,"mime":126,"name":900,"path":10,"size":901,"width":194,"height":49},"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002Fthumbnail_Njord-A-Future-Project---begining-og-the-sea-trial-20.02.2022-Stord---Aker-Solutions---SEC-Norge_2022-06-07T09-50-48.jpg","eb7e2c9f208b2ae27261420d853f36db","thumbnail_Njord A Future Project - begining og the sea trial 20.02.2022 Stord - Aker Solutions - SEC Norge.jpg",5.4,"bd14845c72fcfc19773ef4c88cb3de62",2299.83,"https:\u002F\u002Fstorage.secgrupa.com\u002Fsec-website-storage\u002FNjord-A-Future-Project---begining-og-the-sea-trial-20.02.2022-Stord---Aker-Solutions---SEC-Norge_2022-06-07T09-50-48.jpg","2022-06-07T09:50:49.777Z",[907,912],{"id":657,"Project":908,"createdAt":909,"updatedAt":910,"publishedAt":911},"Njord Future","2022-04-19T08:43:19.890Z","2022-04-19T08:43:20.558Z","2022-04-19T08:43:20.555Z",{"id":913,"Project":914,"createdAt":915,"updatedAt":916,"publishedAt":917},30,"Njord Future - Sea Trial","2022-06-01T11:59:22.447Z","2022-06-01T11:59:24.638Z","2022-06-01T11:59:24.635Z",[919,920],{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},"Kvaerner","2022-04-19T09:57:10.381Z","2022-04-19T09:57:14.361Z","2022-04-19T09:57:14.358Z",[926],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[928,929],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},{"id":930,"Location":931,"createdAt":932,"updatedAt":933,"publishedAt":934},18,"Verdal","2022-04-19T10:03:36.603Z","2022-04-19T10:03:37.106Z","2022-04-19T10:03:37.103Z",[936],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[938,944,949,955,956,957,962,963,964,965,966,972,977,983,989,995,1001,1007,1013,1014],{"id":939,"Tag":940,"createdAt":941,"updatedAt":942,"publishedAt":943},32,"QC\u002FQA","2022-04-19T08:29:02.656Z","2022-04-19T08:29:03.504Z","2022-04-19T08:29:03.499Z",{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},"Engineering","2022-04-19T08:21:01.478Z","2022-04-19T08:21:02.208Z","2022-04-19T08:21:02.205Z",{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},28,"IWE","2022-04-19T08:28:05.850Z","2022-04-19T08:28:06.983Z","2022-04-19T08:28:06.980Z",{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":913,"Tag":958,"createdAt":959,"updatedAt":960,"publishedAt":961},"FROSIO","2022-04-19T08:28:34.674Z","2022-04-19T08:28:35.450Z","2022-04-19T08:28:35.447Z",{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":967,"Tag":968,"createdAt":969,"updatedAt":970,"publishedAt":971},37,"Offshore","2022-06-01T12:00:51.153Z","2022-06-01T12:00:52.023Z","2022-06-01T12:00:52.017Z",{"id":648,"Tag":973,"createdAt":974,"updatedAt":975,"publishedAt":976},"HSE","2022-04-19T08:25:09.839Z","2022-04-19T08:25:10.847Z","2022-04-19T08:25:10.843Z",{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},11,"Prefabrication","2022-04-19T08:22:27.784Z","2022-04-19T08:22:28.632Z","2022-04-19T08:22:28.629Z",{"id":984,"Tag":985,"createdAt":986,"updatedAt":987,"publishedAt":988},12,"Repair","2022-04-19T08:22:36.786Z","2022-04-19T08:22:37.417Z","2022-04-19T08:22:37.414Z",{"id":990,"Tag":991,"createdAt":992,"updatedAt":993,"publishedAt":994},24,"Conversion","2022-04-19T08:26:14.220Z","2022-04-19T08:26:15.198Z","2022-04-19T08:26:15.192Z",{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},9,"Inspection","2022-04-19T08:21:51.816Z","2022-04-19T08:21:56.870Z","2022-04-19T08:21:52.629Z",{"id":1002,"Tag":1003,"createdAt":1004,"updatedAt":1005,"publishedAt":1006},14,"Disassembling","2022-04-19T08:23:00.460Z","2022-04-19T08:23:01.123Z","2022-04-19T08:23:01.120Z",{"id":1008,"Tag":1009,"createdAt":1010,"updatedAt":1011,"publishedAt":1012},23,"Dimensional control","2022-04-19T08:25:59.120Z","2022-04-19T08:26:00.151Z","2022-04-19T08:26:00.147Z",{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},"IWI","2022-04-19T08:28:13.449Z","2022-04-19T08:28:14.234Z","2022-04-19T08:28:14.231Z",{"id":1020,"Title":1021,"Slug":1022,"Date":1023,"Story":1024,"Links":10,"createdAt":1025,"updatedAt":1026,"publishedAt":1027,"MainVisualContent":1028,"Projects":1053,"Clients":1054,"Countries":1060,"Locations":1063,"Companies":1071,"Tags":1073},70,"SEC Pomorze licenced temporary employment agency in Germany","sec-pomorze-licenced-temporary-employment-agency-in-germany","2021-12-27","We are pleased to inform you that SEC Pomorze has just finished a half-year-long process of obtaining permission to operate as a temporary employment agency at the German market. Our interest in this process resulted from establishing business relations with two major German clients responsible for insulation services and solutions for the fire protection industry.\nThe license of the temporary employment agency imposes new, very strict obligations on us. However, we believe that thanks to the experience gained on the Norwegian market and adherence to high standards of fair treatment of our employees, we will easily meet the requirements set by German authorities.","2022-04-19T06:33:36.180Z","2022-04-22T12:48:07.491Z","2022-04-19T06:33:37.635Z",{"id":147,"name":1029,"alternativeText":1029,"caption":1029,"width":1030,"height":1031,"formats":1032,"hash":1049,"ext":1034,"mime":24,"size":1050,"url":1051,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1052,"updatedAt":1052},"MAPWIT~1.PNG",800,600,{"small":1033,"medium":1039,"thumbnail":1044},{"ext":1034,"url":1035,"hash":1036,"mime":24,"name":1037,"path":10,"size":1038,"width":35,"height":183},".PNG","https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_MAPWIT~1_2022-04-22T12-38-39.PNG","e4aae4237d641d804ed45d327f8e5940","small_MAPWIT~1.PNG",56.21,{"ext":1034,"url":1040,"hash":1041,"mime":24,"name":1042,"path":10,"size":1043,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_MAPWIT~1_2022-04-22T12-38-39.PNG","0e531f09175576296fa6a669fce3a6cc","medium_MAPWIT~1.PNG",98.68,{"ext":1034,"url":1045,"hash":1046,"mime":24,"name":1047,"path":10,"size":1048,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_MAPWIT~1_2022-04-22T12-38-38.PNG","3abf433fd9a80250bd6e8bc70bbd1eaa","thumbnail_MAPWIT~1.PNG",17.57,"73bb307801517beb6a62ee1377312a23",76.9,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FMAPWIT~1_2022-04-22T12-38-38.PNG","2022-04-22T12:38:39.652Z",[],[1055],{"id":842,"Client":1056,"createdAt":1057,"updatedAt":1058,"publishedAt":1059},"Minimax","2022-04-19T09:59:24.205Z","2022-04-19T09:59:24.883Z","2022-04-19T09:59:24.881Z",[1061,1062],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},{"id":353,"Country":545,"createdAt":546,"updatedAt":547,"publishedAt":548},[1064,1070],{"id":1065,"Location":1066,"createdAt":1067,"updatedAt":1068,"publishedAt":1069},19,"Wittenberge","2022-04-19T10:05:56.402Z","2022-04-19T10:05:57.030Z","2022-04-19T10:05:57.027Z",{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[1072],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[1074,1075,1076,1077,1082],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":559,"Tag":1078,"createdAt":1079,"updatedAt":1080,"publishedAt":1081},"Certification","2022-04-19T08:20:04.954Z","2022-04-19T08:20:05.857Z","2022-04-19T08:20:05.854Z",{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":1084,"Title":1085,"Slug":1086,"Date":1087,"Story":1088,"Links":10,"createdAt":1089,"updatedAt":1090,"publishedAt":1091,"MainVisualContent":1092,"Projects":1123,"Clients":1124,"Countries":1125,"Locations":1133,"Companies":1142,"Tags":1146},69,"All best for Christmas and New Year '22","all-best-for-christmas-and-new-year-22","2021-12-23","We'd like to thank you all for your support and cooperation during the last 12 months and that you make this year better for us all :) \nTherefore, we wish you all a calm and relaxing Christmas season and all good for the upcoming New Year 2022!","2022-04-19T06:32:35.969Z","2022-04-22T12:38:07.932Z","2022-04-19T06:32:36.995Z",{"id":206,"name":1093,"alternativeText":1085,"caption":1085,"width":1094,"height":1095,"formats":1096,"hash":1119,"ext":21,"mime":24,"size":1120,"url":1121,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1122,"updatedAt":1122},"All best for Christmas and New Year '22.png",1104,736,{"large":1097,"small":1103,"medium":1109,"thumbnail":1114},{"ext":21,"url":1098,"hash":1099,"mime":24,"name":1100,"path":10,"size":1101,"width":28,"height":1102},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_All-best-for-Christmas-and-New-Year-%2722_2022-04-22T12-38-04.png","566dac92c59300567051027398c6df43","large_All best for Christmas and New Year '22.png",1794.91,667,{"ext":21,"url":1104,"hash":1105,"mime":24,"name":1106,"path":10,"size":1107,"width":35,"height":1108},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_All-best-for-Christmas-and-New-Year-%2722_2022-04-22T12-38-04.png","5babb6ac180a84a694e29acc2a7ea497","small_All best for Christmas and New Year '22.png",468.51,333,{"ext":21,"url":1110,"hash":1111,"mime":24,"name":1112,"path":10,"size":1113,"width":42,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_All-best-for-Christmas-and-New-Year-%2722_2022-04-22T12-38-04.png","27c39497899196ba8fb6634b681a15d1","medium_All best for Christmas and New Year '22.png",1030.71,{"ext":21,"url":1115,"hash":1116,"mime":24,"name":1117,"path":10,"size":1118,"width":69,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_All-best-for-Christmas-and-New-Year-%2722_2022-04-22T12-38-02.png","2c49ef100b6bd0b8d8afa46f02624fae","thumbnail_All best for Christmas and New Year '22.png",107.71,"04363e2469f41d708bf99bae789dba08",1499.73,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FAll-best-for-Christmas-and-New-Year-%2722_2022-04-22T12-38-02.png","2022-04-22T12:38:04.391Z",[],[],[1126,1127,1128],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},{"id":858,"Country":1129,"createdAt":1130,"updatedAt":1131,"publishedAt":1132},"United Kingdom","2022-04-19T10:08:22.175Z","2022-04-19T10:08:22.747Z","2022-04-19T10:08:22.744Z",[1134,1135,1141],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},{"id":1136,"Location":1137,"createdAt":1138,"updatedAt":1139,"publishedAt":1140},20,"London","2022-04-19T10:09:31.638Z","2022-04-19T10:09:32.464Z","2022-04-19T10:09:32.460Z",{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[1143,1144,1145],{"id":566,"SEC":567,"createdAt":568,"updatedAt":569,"publishedAt":570},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[1147],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":1149,"Title":1150,"Slug":1151,"Date":1152,"Story":1153,"Links":10,"createdAt":1154,"updatedAt":1155,"publishedAt":1156,"MainVisualContent":1157,"Projects":1180,"Clients":1181,"Countries":1182,"Locations":1184,"Companies":1186,"Tags":1188},68,"SEC is entering UK market","sec-is-entering-uk-market","2021-11-24","We are thrilled to announce that today we have officially registered the SEC GB&NI Ltd. In recent years, we have developed close cooperation with partners operating on the Irish and UK markets. Mostly as a provider of highly skilled welding and fitting personnel.\nBrexit introduces new legal conditions to the situation of foreign personnel and employers. Our presence in the United Kingdom is an adaptation to new market conditions and a message to our clients operating on this market that our services are still available and we will not abandon their projects.\nCurrently, we are waiting for the official licence of the temporary employment agency. In a matter of a few weeks, we expect to be granted permission to operate as a specialized agency for heavy industry in the scope of welding, thermal insulation, scaffolding and engineering workforce. \n\n**SEC GB&NI LTD**\n\nCompany number: 13763919\nCompany type: Private Limited Company\nRegistered office address: 18 London Road, Portsmouth, England, PO2 0LH\nNature of business (SIC):\n- 78200 Temporary employment agency activities\n- 78109 Other activities of employment placement agencies","2022-04-19T06:22:56.506Z","2022-04-22T12:36:25.092Z","2022-04-19T06:22:57.525Z",{"id":253,"name":1158,"alternativeText":1159,"caption":1159,"width":1030,"height":1031,"formats":1160,"hash":1176,"ext":21,"mime":24,"size":1177,"url":1178,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1179,"updatedAt":1179},"Map with marked SEC, SEC Pomorze SEC Norge and SEC GB&NI.png","Map with marked SEC, SEC Pomorze SEC Norge and SEC GB&NI",{"small":1161,"medium":1166,"thumbnail":1171},{"ext":21,"url":1162,"hash":1163,"mime":24,"name":1164,"path":10,"size":1165,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Map-with-marked-SEC%2C-SEC-Pomorze-SEC-Norge-and-SEC-GB%26NI_2022-04-22T12-36-21.png","e91f7b36a259f7f404bbea35c27e6820","small_Map with marked SEC, SEC Pomorze SEC Norge and SEC GB&NI.png",54.96,{"ext":21,"url":1167,"hash":1168,"mime":24,"name":1169,"path":10,"size":1170,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Map-with-marked-SEC%2C-SEC-Pomorze-SEC-Norge-and-SEC-GB%26NI_2022-04-22T12-36-20.png","70460d803fc4262a7118f32d20600ebb","medium_Map with marked SEC, SEC Pomorze SEC Norge and SEC GB&NI.png",96.67,{"ext":21,"url":1172,"hash":1173,"mime":24,"name":1174,"path":10,"size":1175,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Map-with-marked-SEC%2C-SEC-Pomorze-SEC-Norge-and-SEC-GB%26NI_2022-04-22T12-36-20.png","03372d628e3534330cee0db5b58b8a95","thumbnail_Map with marked SEC, SEC Pomorze SEC Norge and SEC GB&NI.png",17.26,"7d0fa025851c4923a67de103720378c4",76.16,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FMap-with-marked-SEC%2C-SEC-Pomorze-SEC-Norge-and-SEC-GB%26NI_2022-04-22T12-36-20.png","2022-04-22T12:36:21.213Z",[],[],[1183],{"id":858,"Country":1129,"createdAt":1130,"updatedAt":1131,"publishedAt":1132},[1185],{"id":1136,"Location":1137,"createdAt":1138,"updatedAt":1139,"publishedAt":1140},[1187],{"id":566,"SEC":567,"createdAt":568,"updatedAt":569,"publishedAt":570},[1189],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":1191,"Title":1192,"Slug":1193,"Date":1194,"Story":1195,"Links":10,"createdAt":1196,"updatedAt":1197,"publishedAt":1198,"MainVisualContent":1199,"Projects":1227,"Clients":1228,"Countries":1229,"Locations":1231,"Companies":1233,"Tags":1235},66,"Integrated management system certified for ISO 9001: 2015, ISO 14001: 2015 and ISO 45001: 2018","integrated-management-system-certified-for-iso-9001-2015-iso-14001-2015-and-iso-45001-2018","2021-08-30","We are pleased to announce that we have successfully passed the certification audit carried out by the Office of Technical Inspection (UDT).\nOur company has been audited and certified as part of an integrated management system based on ISO 9001: 2015, ISO 14001: 2015 and ISO 45001: 2018.The last two years have not been the easiest period for our industry, but we like to prove that we never give up on continuous development and providing quality and safe services to Clients. We consider the process of preparing for certification and successfully passing the audit to honour many years of adherence to the principles and standards of our organization.","2022-04-19T06:16:39.006Z","2022-04-22T12:32:48.393Z","2022-04-19T06:16:40.409Z",{"id":299,"name":1200,"alternativeText":1201,"caption":1201,"width":697,"height":698,"formats":1202,"hash":1223,"ext":1204,"mime":126,"size":1224,"url":1225,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1226,"updatedAt":1226},"SEC Pomorze ISO Certificate 9001-2015 14001-2015 45001-2018.JPG","SEC Pomorze ISO Certificate 9001-2015 14001-2015 45001-2018",{"large":1203,"small":1209,"medium":1214,"thumbnail":1218},{"ext":1204,"url":1205,"hash":1206,"mime":126,"name":1207,"path":10,"size":1208,"width":27,"height":28},".JPG","https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_SEC-Pomorze-ISO-Certificate-9001-2015-14001-2015-45001-2018_2022-04-22T12-31-50.JPG","4d1274d4d9dd125940406033d57ebcdd","large_SEC Pomorze ISO Certificate 9001-2015 14001-2015 45001-2018.JPG",95.98,{"ext":1204,"url":1210,"hash":1211,"mime":126,"name":1212,"path":10,"size":1213,"width":84,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Pomorze-ISO-Certificate-9001-2015-14001-2015-45001-2018_2022-04-22T12-31-51.JPG","4e0a1f9f235dddfb437a5b33f0e1ab2d","small_SEC Pomorze ISO Certificate 9001-2015 14001-2015 45001-2018.JPG",30.01,{"ext":1204,"url":1215,"hash":1216,"mime":126,"name":1217,"path":10,"size":182,"width":90,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Pomorze-ISO-Certificate-9001-2015-14001-2015-45001-2018_2022-04-22T12-31-51.JPG","e706531208724bc9ee6920ace8d06705","medium_SEC Pomorze ISO Certificate 9001-2015 14001-2015 45001-2018.JPG",{"ext":1204,"url":1219,"hash":1220,"mime":126,"name":1221,"path":10,"size":1222,"width":48,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Pomorze-ISO-Certificate-9001-2015-14001-2015-45001-2018_2022-04-22T12-31-50.JPG","5c88210d5b690f0712a2514e66201920","thumbnail_SEC Pomorze ISO Certificate 9001-2015 14001-2015 45001-2018.JPG",4.17,"d01856c40d25dd6df8affdd183e0b9c8",2317.67,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Pomorze-ISO-Certificate-9001-2015-14001-2015-45001-2018_2022-04-22T12-31-49.JPG","2022-04-22T12:31:51.262Z",[],[],[1230],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[1232],{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[1234],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[1236,1237,1238,1239],{"id":939,"Tag":940,"createdAt":941,"updatedAt":942,"publishedAt":943},{"id":648,"Tag":973,"createdAt":974,"updatedAt":975,"publishedAt":976},{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":559,"Tag":1078,"createdAt":1079,"updatedAt":1080,"publishedAt":1081},{"id":1241,"Title":1242,"Slug":1243,"Date":1244,"Story":1245,"Links":10,"createdAt":1246,"updatedAt":1247,"publishedAt":1248,"MainVisualContent":10,"Projects":1249,"Clients":1260,"Countries":1263,"Locations":1265,"Companies":1267,"Tags":1269},65,"End works on 2nd phase of Johan Sverdrup project","end-works-on-2nd-phase-of-johan-sverdrup-project","2021-07-11","Last week at Stord works on the Johan Sverdrup module have been finished. The module was been moved on the barge and will be towed to the Johan Sverdrup field, which is the third-largest oil field on the Norwegian continental shelf.\nWe are proud that our team has been contributing to the development of the Johan Sverdrup project since the beginning of the year 2017. When our thermal insulation operators and scaffolding teams start works on the ULQ module. Further extended by welding teams on the jackets prefabrication yard. Cooperation with Kvaerner and Aker Solutions on the Johan Sverdrup was excellent 4 years of intensive and interesting challenges.","2022-04-18T19:21:46.536Z","2022-04-22T12:28:19.262Z","2022-04-18T19:21:49.417Z",[1250,1255],{"id":1065,"Project":1251,"createdAt":1252,"updatedAt":1253,"publishedAt":1254},"Johan Sverdrup","2022-04-19T08:42:35.342Z","2022-04-19T08:42:36.036Z","2022-04-19T08:42:36.034Z",{"id":1136,"Project":1256,"createdAt":1257,"updatedAt":1258,"publishedAt":1259},"Johan Sverdrup P2","2022-04-19T08:42:43.184Z","2022-04-19T08:42:43.856Z","2022-04-19T08:42:43.853Z",[1261,1262],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},[1264],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1266],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[1268],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1270,1271,1272,1273,1274,1275],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":1277,"Title":1278,"Slug":1279,"Date":1280,"Story":1281,"Links":10,"createdAt":1282,"updatedAt":1283,"publishedAt":1284,"MainVisualContent":1285,"Projects":1308,"Clients":1309,"Countries":1310,"Locations":1313,"Companies":1316,"Tags":1319},64,"First signs of recovery after pandemic shock","first-signs-of-recovery-after-pandemic-shock","2021-06-15","The global situation makes the year 2020 one of the toughest years for everyone in the industry. We felt it particularly strongly because the end of 2019 was in many ways the record year for us. SEC achieved increases in all aspects of our business from many new orders, the introduction of new services and disciplines to our Clients and in result in highest employment levels in the company's history. Unfortunately, 1Q of 2020 hit us hard with spreading the Covid-19 pandemic. Which resulted in the temporary shutdown or suspension of production in most of our client's facilities.\nFortunately, thanks to the titanic work done by the SEC's administration team, and cooperation with Norwegian institutions, we have managed to avoid mass layoffs and successfully moved our Norwegian personnel on permittering. And then, together with our clients, to whom we are grateful for the close cooperation. We have started developing safe and effective methods of cooperation under new strict sanitary and travelling restrictions. In consultation with clients, trade unions and our production employees, we managed to develop solutions that, were far from perfect but allowed us to safely resume production and by the end of 2020 restore 1\u002F3 of our staff to active work.\nNow in mid-2021, we are still struggling fighting with pandemic, but currently, we see the first signs of recovery after the initial shock. Thanks to the involvement of administrative staff in the improvement of personnel logistics processes, knowledge of the rules of quarantine and travel restrictions, and the introduction of a digital system of employment contracts, we can think about new projects. After 2Q the statistics of employment and restoration of production personnel to active work allow us to think about the future with moderate optimism.\nWe would like to greatly thank our production and administrative staff, as well as our Clients for supporting and building together a stable future. Even in these challenging times.","2022-04-18T19:16:55.341Z","2022-04-22T12:22:51.518Z","2022-04-18T19:16:57.895Z",{"id":366,"name":1286,"alternativeText":1287,"caption":1287,"width":1030,"height":1031,"formats":1288,"hash":1304,"ext":21,"mime":24,"size":1305,"url":1306,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1307,"updatedAt":1307},"Bar chart showing First signs of recovery after pandemic shock - increase of onsite employment.png","Bar chart showing First signs of recovery after pandemic shock - increase of onsite employment",{"small":1289,"medium":1294,"thumbnail":1299},{"ext":21,"url":1290,"hash":1291,"mime":24,"name":1292,"path":10,"size":1293,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Bar-chart-showing-First-signs-of-recovery-after-pandemic-shock---increase-of-onsite-employment_2022-04-22T12-21-56.png","b53619ec417f02cdfa67cde82c6e6bc1","small_Bar chart showing First signs of recovery after pandemic shock - increase of onsite employment.png",55.75,{"ext":21,"url":1295,"hash":1296,"mime":24,"name":1297,"path":10,"size":1298,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Bar-chart-showing-First-signs-of-recovery-after-pandemic-shock---increase-of-onsite-employment_2022-04-22T12-21-56.png","543b4e11645cd9123bee9cd5c2a6a1a7","medium_Bar chart showing First signs of recovery after pandemic shock - increase of onsite employment.png",96.24,{"ext":21,"url":1300,"hash":1301,"mime":24,"name":1302,"path":10,"size":1303,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Bar-chart-showing-First-signs-of-recovery-after-pandemic-shock---increase-of-onsite-employment_2022-04-22T12-21-56.png","44b95cf03ce2c39f93d130b725bf9144","thumbnail_Bar chart showing First signs of recovery after pandemic shock - increase of onsite employment.png",17.92,"14f9610d8ca3efed9acf8c5cc51545b0",73.51,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FBar-chart-showing-First-signs-of-recovery-after-pandemic-shock---increase-of-onsite-employment_2022-04-22T12-21-55.png","2022-04-22T12:21:56.908Z",[],[],[1311,1312],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1314,1315],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[1317,1318],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1320,1321],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":353,"Tag":1322,"createdAt":1323,"updatedAt":1324,"publishedAt":1325},"Covid-19","2022-04-19T08:20:36.502Z","2022-04-19T08:20:37.361Z","2022-04-19T08:20:37.359Z",{"id":1327,"Title":1328,"Slug":1329,"Date":1330,"Story":1331,"Links":10,"createdAt":1332,"updatedAt":1333,"publishedAt":1334,"MainVisualContent":1335,"Projects":1366,"Clients":1367,"Countries":1368,"Locations":1371,"Companies":1372,"Tags":1375},63,"Christmas Wishes 2020","christmas-wishes-2020","2020-12-21","We would like to thank all our Partners and Friends for their trust and patronage in 2020.\nWe wish you further achievements, successful investments and every prosperity in the coming New Year!","2022-04-18T19:14:46.270Z","2022-04-22T12:20:17.928Z","2022-04-18T19:14:47.701Z",{"id":411,"name":1336,"alternativeText":1337,"caption":1337,"width":1338,"height":1339,"formats":1340,"hash":1362,"ext":123,"mime":126,"size":1363,"url":1364,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1365,"updatedAt":1365},"Best wishes for Christmas and New Year 2021.jpg","Best wishes for Christmas and New Year 2021",1010,674,{"large":1341,"small":1346,"medium":1352,"thumbnail":1357},{"ext":123,"url":1342,"hash":1343,"mime":126,"name":1344,"path":10,"size":1345,"width":28,"height":1102},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_Best-wishes-for-Christmas-and-New-Year-2021_2022-04-22T12-19-00.jpg","73d5a3203b0bfca7273bf065380db0e7","large_Best wishes for Christmas and New Year 2021.jpg",198.13,{"ext":123,"url":1347,"hash":1348,"mime":126,"name":1349,"path":10,"size":1350,"width":35,"height":1351},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Best-wishes-for-Christmas-and-New-Year-2021_2022-04-22T12-19-00.jpg","0cd6709835db0c18ed2f3c77a456c736","small_Best wishes for Christmas and New Year 2021.jpg",54.65,334,{"ext":123,"url":1353,"hash":1354,"mime":126,"name":1355,"path":10,"size":1356,"width":42,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Best-wishes-for-Christmas-and-New-Year-2021_2022-04-22T12-19-00.jpg","5a1fe34e2331e38aa206f09b75472d98","medium_Best wishes for Christmas and New Year 2021.jpg",120.52,{"ext":123,"url":1358,"hash":1359,"mime":126,"name":1360,"path":10,"size":1361,"width":69,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Best-wishes-for-Christmas-and-New-Year-2021_2022-04-22T12-19-00.jpg","129ee88964b3a22423da82c4e63b5e05","thumbnail_Best wishes for Christmas and New Year 2021.jpg",11.67,"9d13595bd254e07980980a155cab6dc7",275.51,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FBest-wishes-for-Christmas-and-New-Year-2021_2022-04-22T12-19-00.jpg","2022-04-22T12:19:00.859Z",[],[],[1369,1370],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[],[1373,1374],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1376],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":1378,"Title":1379,"Slug":1380,"Date":1381,"Story":1382,"Links":10,"createdAt":1383,"updatedAt":1384,"publishedAt":1385,"MainVisualContent":1386,"Projects":1406,"Clients":1407,"Countries":1410,"Locations":1412,"Companies":1419,"Tags":1421},62,"Merge of our Clients","merge-of-our-clients","2020-11-11","We are pleased to announce that, on 11 November 2020, two of our long-term Clients the Kværner and Aker Solutions have merged together under Aker Solutions.\nIt gives merged company potential to become one of the leading suppliers of solutions for Oil & Gas industry in area of climate gas emissions reduction and introduction of renewable energy production facilities.\nWe strongly believe that this is great news and excellent opportunity to grow for whole industry. We are also excited that in this constantly evolving world, since 10 years now, SEC personnel helps bring value and deliver their projects. And we are always open for new technologies and challenges posed by our growing Clients.","2022-04-18T19:10:08.857Z","2022-04-22T12:18:01.505Z","2022-04-18T19:10:10.351Z",{"id":460,"name":1387,"alternativeText":1388,"caption":1388,"width":1389,"height":1390,"formats":1391,"hash":1402,"ext":123,"mime":126,"size":1403,"url":1404,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1405,"updatedAt":1405},"Green and White helmets with brand stickers of Aker Solutions and Kvaerner logos.jpg","Green and White helmets with brand stickers of Aker Solutions and Kvaerner logos",599,337,{"small":1392,"thumbnail":1397},{"ext":123,"url":1393,"hash":1394,"mime":126,"name":1395,"path":10,"size":1396,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Green-and-White-helmets-with-brand-stickers-of-Aker-Solutions-and-Kvaerner-logos_2022-04-22T12-17-26.jpg","3d6e152b6618efa550458a49ceb8e57a","small_Green and White helmets with brand stickers of Aker Solutions and Kvaerner logos.jpg",16.86,{"ext":123,"url":1398,"hash":1399,"mime":126,"name":1400,"path":10,"size":1401,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Green-and-White-helmets-with-brand-stickers-of-Aker-Solutions-and-Kvaerner-logos_2022-04-22T12-17-26.jpg","ba1bd32aef3c24734a56930f4108467a","thumbnail_Green and White helmets with brand stickers of Aker Solutions and Kvaerner logos.jpg",6.45,"602012ae607740dd87b5702c834bcbe5",70.44,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FGreen-and-White-helmets-with-brand-stickers-of-Aker-Solutions-and-Kvaerner-logos_2022-04-22T12-17-26.jpg","2022-04-22T12:17:26.961Z",[],[1408,1409],{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1411],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1413,1418],{"id":353,"Location":1414,"createdAt":1415,"updatedAt":1416,"publishedAt":1417},"Egersund","2022-04-19T10:01:10.377Z","2022-04-19T10:01:11.056Z","2022-04-19T10:01:11.052Z",{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[1420],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1422,1423],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":577,"Tag":1424,"createdAt":1425,"updatedAt":1426,"publishedAt":1427},"Trade fair & events","2022-04-19T08:20:49.034Z","2022-04-19T08:20:49.939Z","2022-04-19T08:20:49.935Z",{"id":1429,"Title":1430,"Slug":1431,"Date":1432,"Story":1433,"Links":10,"createdAt":1434,"updatedAt":1435,"publishedAt":1436,"MainVisualContent":10,"Projects":1437,"Clients":1438,"Countries":1439,"Locations":1442,"Companies":1445,"Tags":1448},61,"Covid 19","covid-19","2020-04-15","Due to the pandemic, please take precautions in accordance with the recommendations:\n\n**Poland:** [https:\u002F\u002Fwww.gov.pl\u002Fweb\u002Fkoronawirus](https:\u002F\u002Fwww.gov.pl\u002Fweb\u002Fkoronawirus)\n**Norway:** [https:\u002F\u002Fwww.fhi.no\u002Fen\u002F](https:\u002F\u002Fwww.fhi.no\u002Fen\u002F)\n**General:** [https:\u002F\u002Fwww.who.int\u002Femergencies\u002Fdiseases\u002Fnovel-coronavirus-2019](https:\u002F\u002Fwww.who.int\u002Femergencies\u002Fdiseases\u002Fnovel-coronavirus-2019)\n\nThank you and stay healthy.","2022-04-18T19:08:07.007Z","2022-04-22T12:14:01.829Z","2022-04-18T19:10:32.042Z",[],[],[1440,1441],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1443,1444],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[1446,1447],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1449,1450],{"id":353,"Tag":1322,"createdAt":1323,"updatedAt":1324,"publishedAt":1325},{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":1452,"Title":1453,"Slug":1454,"Date":1455,"Story":1456,"Links":10,"createdAt":1457,"updatedAt":1458,"publishedAt":1459,"MainVisualContent":10,"Projects":1460,"Clients":1461,"Countries":1462,"Locations":1465,"Companies":1466,"Tags":1469},71,"RECORD!","record","2020-02-02","The 2019 brought us a lot of work, but also many reasons to celebrat. We have managed to set our own employment record in professions such as welder, scaffolder, pipe fitter, insulation fitter and many others!\nTogether, we were almost 700 people! And this year, employment does not fall below 600 and we hope it will continue!\nWe would like to thank everyone for their hard work, thanks to which we can constantly develop our company and increase employment.","2022-04-19T06:34:44.337Z","2022-04-22T12:11:21.433Z","2022-04-19T06:34:47.138Z",[],[],[1463,1464],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[],[1467,1468],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1470],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":1472,"Title":1473,"Slug":1474,"Date":1475,"Story":1476,"Links":10,"createdAt":1477,"updatedAt":1478,"publishedAt":1479,"MainVisualContent":1480,"Projects":1504,"Clients":1507,"Countries":1509,"Locations":1511,"Companies":1513,"Tags":1515},60,"Jacket fabrication - Johan Sverdrup project phase 2","jacket-fabrication-johan-sverdrup-project-phase-2","2019-10-11","Starting from October 2019, we expanded cooperation with the leader in the Offshore construction sector - Kvaerner AS at another location at the Norwegian Verdal plant.\nOur crew specializes in welding work on prefabrication of jackets for the second phase of the Johan Sverdrup project. Before starting work, all our employees have passed positively demanding training and welding exam of this type of construction, once again proving the experience and high quality of services provided by SEC.","2022-04-18T19:05:01.661Z","2022-04-22T12:09:22.592Z","2022-04-18T19:05:03.420Z",{"id":503,"name":1481,"alternativeText":1482,"caption":1482,"width":1030,"height":1483,"formats":1484,"hash":1500,"ext":123,"mime":126,"size":1501,"url":1502,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1503,"updatedAt":1503},"View on the Johan Sverdrup field - Johan Sverdrup project phase 2 Photo Kvaerner.jpg","View on the Johan Sverdrup field - Johan Sverdrup project phase 2 Photo Kvaerner",450,{"small":1485,"medium":1490,"thumbnail":1495},{"ext":123,"url":1486,"hash":1487,"mime":126,"name":1488,"path":10,"size":1489,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_View-on-the-Johan-Sverdrup-field---Johan-Sverdrup-project-phase-2-Photo-Kvaerner_2022-04-22T12-08-26.jpg","62f9c9fb20f40f70803a8c7402e86f08","small_View on the Johan Sverdrup field - Johan Sverdrup project phase 2 Photo Kvaerner.jpg",24.84,{"ext":123,"url":1491,"hash":1492,"mime":126,"name":1493,"path":10,"size":1494,"width":42,"height":141},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_View-on-the-Johan-Sverdrup-field---Johan-Sverdrup-project-phase-2-Photo-Kvaerner_2022-04-22T12-08-26.jpg","7f821ea76d99ca3f45aa801b100f7afb","medium_View on the Johan Sverdrup field - Johan Sverdrup project phase 2 Photo Kvaerner.jpg",48.27,{"ext":123,"url":1496,"hash":1497,"mime":126,"name":1498,"path":10,"size":1499,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_View-on-the-Johan-Sverdrup-field---Johan-Sverdrup-project-phase-2-Photo-Kvaerner_2022-04-22T12-08-26.jpg","a6d95cff440e4b632a0c4a88efe8901e","thumbnail_View on the Johan Sverdrup field - Johan Sverdrup project phase 2 Photo Kvaerner.jpg",7.38,"845094da4731980b651443d5eb2b8945",239.85,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FView-on-the-Johan-Sverdrup-field---Johan-Sverdrup-project-phase-2-Photo-Kvaerner_2022-04-22T12-08-26.jpg","2022-04-22T12:08:26.517Z",[1505,1506],{"id":1136,"Project":1256,"createdAt":1257,"updatedAt":1258,"publishedAt":1259},{"id":1065,"Project":1251,"createdAt":1252,"updatedAt":1253,"publishedAt":1254},[1508],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1510],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1512],{"id":930,"Location":931,"createdAt":932,"updatedAt":933,"publishedAt":934},[1514],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1516,1517,1518,1519,1520,1521],{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":1523,"Title":1524,"Slug":1525,"Date":1526,"Story":1527,"Links":10,"createdAt":1528,"updatedAt":1529,"publishedAt":1530,"MainVisualContent":1531,"Projects":1552,"Clients":1559,"Countries":1561,"Locations":1563,"Companies":1565,"Tags":1567},59,"The first scaffolding fitters groups at Johan Castberg","the-first-scaffolding-fitters-groups-at-johan-castberg","2019-08-09","The first groups of scaffolding fitters started working on the Johan Castberg project. This is another group of scaffolders ordered by our long-time customer Kvaerner AS, which only confirms the high quality of our services.","2022-04-18T19:03:45.587Z","2022-04-22T12:06:48.468Z","2022-04-18T19:03:47.641Z",{"id":686,"name":1532,"alternativeText":1533,"caption":1533,"width":1534,"height":1535,"formats":1536,"hash":1548,"ext":123,"mime":126,"size":1549,"url":1550,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1551,"updatedAt":1551},"Johan Castberg Photo Kvaerner.jpg","Johan Castberg Photo Kvaerner",696,392,{"small":1537,"thumbnail":1543},{"ext":123,"url":1538,"hash":1539,"mime":126,"name":1540,"path":10,"size":1541,"width":35,"height":1542},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Johan-Castberg-Photo-Kvaerner_2022-04-22T12-05-53.jpg","db71e2104e2390669af9208536034ba9","small_Johan Castberg Photo Kvaerner.jpg",33.63,282,{"ext":123,"url":1544,"hash":1545,"mime":126,"name":1546,"path":10,"size":1547,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Johan-Castberg-Photo-Kvaerner_2022-04-22T12-05-53.jpg","84d20bc359acdf2f88ea693b4fdc1ac8","thumbnail_Johan Castberg Photo Kvaerner.jpg",9.94,"b23def7dff72f753ebdea3a067ae2a97",195.72,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FJohan-Castberg-Photo-Kvaerner_2022-04-22T12-05-53.jpg","2022-04-22T12:05:53.378Z",[1553],{"id":1554,"Project":1555,"createdAt":1556,"updatedAt":1557,"publishedAt":1558},16,"Johan Castberg FPSO","2022-04-19T08:41:47.307Z","2022-04-19T08:41:48.121Z","2022-04-19T08:41:48.118Z",[1560],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1562],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1564],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[1566],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1568],{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},{"id":1570,"Title":1571,"Slug":1572,"Date":1573,"Story":1574,"Links":10,"createdAt":1575,"updatedAt":1576,"publishedAt":1577,"MainVisualContent":1578,"Projects":1601,"Clients":1603,"Countries":1605,"Locations":1607,"Companies":1609,"Tags":1611},58,"Module prefabrication on the Johan Castberg project","module-prefabrication-on-the-johan-castberg-project","2019-07-07","At the end of June, Sec Norge began work at the Module Prefabrication Plant in Kværner Stord, Norway. The staff employed for this stage of the project at the Johan Castberg project began to carry out tasks at the prefabrication of advanced modules from materials such as:\n- duplex,\n- super duplex,\n- and titanium.","2022-04-18T19:01:35.673Z","2022-04-22T12:03:23.906Z","2022-04-18T19:10:45.202Z",{"id":585,"name":1579,"alternativeText":1580,"caption":1580,"width":1030,"height":1483,"formats":1581,"hash":1597,"ext":123,"mime":126,"size":1598,"url":1599,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1600,"updatedAt":1600},"Module prefabrication on the Johan Castberg project - Photo Kvaerner.jpg","Module prefabrication on the Johan Castberg project - Photo Kvaerner",{"small":1582,"medium":1587,"thumbnail":1592},{"ext":123,"url":1583,"hash":1584,"mime":126,"name":1585,"path":10,"size":1586,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Module-prefabrication-on-the-Johan-Castberg-project---Photo-Kvaerner_2022-04-22T12-02-14.jpg","7b1a815efb54ea509f7b720d1c39b00c","small_Module prefabrication on the Johan Castberg project - Photo Kvaerner.jpg",34.45,{"ext":123,"url":1588,"hash":1589,"mime":126,"name":1590,"path":10,"size":1591,"width":42,"height":141},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Module-prefabrication-on-the-Johan-Castberg-project---Photo-Kvaerner_2022-04-22T12-02-14.jpg","0360872561b32cfadffb16e40e87dfbd","medium_Module prefabrication on the Johan Castberg project - Photo Kvaerner.jpg",69.67,{"ext":123,"url":1593,"hash":1594,"mime":126,"name":1595,"path":10,"size":1596,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Module-prefabrication-on-the-Johan-Castberg-project---Photo-Kvaerner_2022-04-22T12-02-14.jpg","4ffa4346e708a299754d056ea9cbf773","thumbnail_Module prefabrication on the Johan Castberg project - Photo Kvaerner.jpg",9.83,"017f7932d1600581be1e870ca1c0f9cc",332.86,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FModule-prefabrication-on-the-Johan-Castberg-project---Photo-Kvaerner_2022-04-22T12-02-14.jpg","2022-04-22T12:02:14.581Z",[1602],{"id":1554,"Project":1555,"createdAt":1556,"updatedAt":1557,"publishedAt":1558},[1604],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1606],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1608],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[1610],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1612,1613,1614,1615],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":1617,"Title":1618,"Slug":1619,"Date":1620,"Story":1621,"Links":10,"createdAt":1622,"updatedAt":1623,"publishedAt":1624,"MainVisualContent":1625,"Projects":1650,"Clients":1656,"Countries":1662,"Locations":1664,"Companies":1670,"Tags":1672},57,"Westcon Yards AS","westcon-yards-as","2019-05-10","With end of April, our team finished working at Westcon Yards AS. Among other things, we took part in the renovation activities of the MS Nordkapp floating vessel.","2022-04-18T18:58:52.026Z","2022-04-22T12:01:01.061Z","2022-04-18T18:58:53.668Z",{"id":797,"name":1626,"alternativeText":1627,"caption":1627,"width":1628,"height":1629,"formats":1630,"hash":1646,"ext":123,"mime":126,"size":1647,"url":1648,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1649,"updatedAt":1649},"MS Nordkapp at Olen yard of Westron Yards AS.jpg","MS Nordkapp at Olen yard of Westron Yards AS",720,960,{"small":1631,"medium":1636,"thumbnail":1641},{"ext":123,"url":1632,"hash":1633,"mime":126,"name":1634,"path":10,"size":1635,"width":183,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_MS-Nordkapp-at-Olen-yard-of-Westron-Yards-AS_2022-04-22T11-59-54.jpg","6a859b3e462d4a7ca8b9589f8349be3b","small_MS Nordkapp at Olen yard of Westron Yards AS.jpg",36.32,{"ext":123,"url":1637,"hash":1638,"mime":126,"name":1639,"path":10,"size":1640,"width":129,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_MS-Nordkapp-at-Olen-yard-of-Westron-Yards-AS_2022-04-22T11-59-54.jpg","b98a91f4c27817d171158beeacf0bd60","medium_MS Nordkapp at Olen yard of Westron Yards AS.jpg",71.58,{"ext":123,"url":1642,"hash":1643,"mime":126,"name":1644,"path":10,"size":1645,"width":194,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_MS-Nordkapp-at-Olen-yard-of-Westron-Yards-AS_2022-04-22T11-59-54.jpg","007948efeb7e72c1f44386ce49470efc","thumbnail_MS Nordkapp at Olen yard of Westron Yards AS.jpg",5.1,"46bc31f79ddd145313a05ffc4a1b5f48",307.1,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FMS-Nordkapp-at-Olen-yard-of-Westron-Yards-AS_2022-04-22T11-59-54.jpg","2022-04-22T11:59:54.345Z",[1651],{"id":990,"Project":1652,"createdAt":1653,"updatedAt":1654,"publishedAt":1655},"MS Nordkapp","2022-04-19T08:43:13.558Z","2022-04-19T08:43:14.159Z","2022-04-19T08:43:14.156Z",[1657],{"id":1554,"Client":1658,"createdAt":1659,"updatedAt":1660,"publishedAt":1661},"Westcon Yards","2022-04-19T09:59:16.510Z","2022-04-19T09:59:17.179Z","2022-04-19T09:59:17.177Z",[1663],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1665],{"id":663,"Location":1666,"createdAt":1667,"updatedAt":1668,"publishedAt":1669},"Ølen","2022-04-19T10:02:15.256Z","2022-04-19T10:02:15.964Z","2022-04-19T10:02:15.961Z",[1671],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1673,1674,1675,1676],{"id":990,"Tag":991,"createdAt":992,"updatedAt":993,"publishedAt":994},{"id":984,"Tag":985,"createdAt":986,"updatedAt":987,"publishedAt":988},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":1678,"Title":908,"Slug":1679,"Date":1680,"Story":1681,"Links":10,"createdAt":1682,"updatedAt":1683,"publishedAt":1684,"MainVisualContent":1685,"Projects":1713,"Clients":1715,"Countries":1717,"Locations":1719,"Companies":1721,"Tags":1723},56,"njord-future","2019-04-05","With the development of the Njord Future platform renovation project, the number of Sec Norge employees is increasing. The project will be joined by a group of our scaffolders and other groups of steel construction fitters. Also, our IWI inspectors as well as insulation engineers cooperate with Njord Future.","2022-04-18T18:57:08.800Z","2022-04-22T11:58:16.793Z","2022-04-18T18:57:11.564Z",{"id":741,"name":1686,"alternativeText":1687,"caption":1687,"width":1030,"height":1688,"formats":1689,"hash":1709,"ext":123,"mime":126,"size":1710,"url":1711,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1712,"updatedAt":1712},"SEC Norge Foreman with production team in front of Njord A platform during Njord Future Project at Stord.jpg","SEC Norge Foreman with production team in front of Njord A platform during Njord Future Project at Stord",1066,{"large":1690,"small":1695,"medium":1700,"thumbnail":1704},{"ext":123,"url":1691,"hash":1692,"mime":126,"name":1693,"path":10,"size":1694,"width":42,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-Foreman-with-production-team-in-front-of-Njord-A-platform-during-Njord-Future-Project-at-Stord_2022-04-22T11-57-01.jpg","5eb7ff92c1b144cb4f219ebc750f15f1","large_SEC Norge Foreman with production team in front of Njord A platform during Njord Future Project at Stord.jpg",118.35,{"ext":123,"url":1696,"hash":1697,"mime":126,"name":1698,"path":10,"size":1699,"width":183,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-Foreman-with-production-team-in-front-of-Njord-A-platform-during-Njord-Future-Project-at-Stord_2022-04-22T11-57-01.jpg","79dca0dea79404c830ef92c30751f120","small_SEC Norge Foreman with production team in front of Njord A platform during Njord Future Project at Stord.jpg",33.52,{"ext":123,"url":1701,"hash":1702,"mime":126,"name":1703,"path":10,"size":1403,"width":129,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-Foreman-with-production-team-in-front-of-Njord-A-platform-during-Njord-Future-Project-at-Stord_2022-04-22T11-57-01.jpg","8d76769f40a56feae7684f4cc2c162cc","medium_SEC Norge Foreman with production team in front of Njord A platform during Njord Future Project at Stord.jpg",{"ext":123,"url":1705,"hash":1706,"mime":126,"name":1707,"path":10,"size":1708,"width":194,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-Foreman-with-production-team-in-front-of-Njord-A-platform-during-Njord-Future-Project-at-Stord_2022-04-22T11-57-00.jpg","1404eed258d6a46ce24691c03ba1ab69","thumbnail_SEC Norge Foreman with production team in front of Njord A platform during Njord Future Project at Stord.jpg",4.54,"15c67db83247d37bd2fd54b722a94874",595.57,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Norge-Foreman-with-production-team-in-front-of-Njord-A-platform-during-Njord-Future-Project-at-Stord_2022-04-22T11-57-00.jpg","2022-04-22T11:57:01.551Z",[1714],{"id":657,"Project":908,"createdAt":909,"updatedAt":910,"publishedAt":911},[1716],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1718],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1720],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[1722],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1724,1725,1726,1727,1728,1729,1730,1731],{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":1733,"Title":1734,"Slug":1735,"Date":1736,"Story":1737,"Links":10,"createdAt":1738,"updatedAt":1739,"publishedAt":1740,"MainVisualContent":1741,"Projects":1769,"Clients":1775,"Countries":1777,"Locations":1779,"Companies":1786,"Tags":1788},55,"Nyhamna prefabrication","nyhamna-prefabrication","2019-02-10","Our client, Kvaerner Stord AS once again commissioned SEC Group with the prefabrication of pipe spools, wich will be installed at the Nyhamna gas production and processing plant, land part of Ormen Lange field on the Norwegian island of Aukra.","2022-04-18T18:51:43.218Z","2022-04-22T11:54:08.980Z","2022-04-18T18:51:46.129Z",{"id":867,"name":1742,"alternativeText":1743,"caption":1743,"width":1030,"height":1688,"formats":1744,"hash":1765,"ext":123,"mime":126,"size":1766,"url":1767,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1768,"updatedAt":1768},"SEC Norge TIG welder weld pipe spools on the piping prefabrication facility for Nyhamna project.jpg","SEC Norge TIG welder weld pipe spools on the piping prefabrication facility for Nyhamna project",{"large":1745,"small":1750,"medium":1755,"thumbnail":1760},{"ext":123,"url":1746,"hash":1747,"mime":126,"name":1748,"path":10,"size":1749,"width":42,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-TIG-welder-weld-pipe-spools-on-the-piping-prefabrication-facility-for-Nyhamna-project_2022-04-22T11-54-02.jpg","e5e1289b0ac5399581f3c38af46b63dd","large_SEC Norge TIG welder weld pipe spools on the piping prefabrication facility for Nyhamna project.jpg",138.55,{"ext":123,"url":1751,"hash":1752,"mime":126,"name":1753,"path":10,"size":1754,"width":183,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-TIG-welder-weld-pipe-spools-on-the-piping-prefabrication-facility-for-Nyhamna-project_2022-04-22T11-54-03.jpg","235560baeab5b0957383b55f1ae57268","small_SEC Norge TIG welder weld pipe spools on the piping prefabrication facility for Nyhamna project.jpg",44.17,{"ext":123,"url":1756,"hash":1757,"mime":126,"name":1758,"path":10,"size":1759,"width":129,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-TIG-welder-weld-pipe-spools-on-the-piping-prefabrication-facility-for-Nyhamna-project_2022-04-22T11-54-03.jpg","7c2c2089f8cc124b7077c7c4d1bfe80b","medium_SEC Norge TIG welder weld pipe spools on the piping prefabrication facility for Nyhamna project.jpg",87.21,{"ext":123,"url":1761,"hash":1762,"mime":126,"name":1763,"path":10,"size":1764,"width":194,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-TIG-welder-weld-pipe-spools-on-the-piping-prefabrication-facility-for-Nyhamna-project_2022-04-22T11-54-02.jpg","4e1228998debc1658316f7e92fa39002","thumbnail_SEC Norge TIG welder weld pipe spools on the piping prefabrication facility for Nyhamna project.jpg",6.07,"3b071c92e05dca8b434b74f7facb5cc4",693.55,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Norge-TIG-welder-weld-pipe-spools-on-the-piping-prefabrication-facility-for-Nyhamna-project_2022-04-22T11-54-02.jpg","2022-04-22T11:54:03.086Z",[1770],{"id":680,"Project":1771,"createdAt":1772,"updatedAt":1773,"publishedAt":1774},"Nyhamna","2022-04-19T08:43:27.395Z","2022-04-19T08:43:28.052Z","2022-04-19T08:43:28.048Z",[1776],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1778],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1780,1781],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},{"id":360,"Location":1782,"createdAt":1783,"updatedAt":1784,"publishedAt":1785},"Aukra","2022-04-19T10:01:00.142Z","2022-04-19T10:01:00.936Z","2022-04-19T10:01:00.933Z",[1787],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1789,1790,1791,1792,1793,1794],{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":1796,"Title":1797,"Slug":1798,"Date":1799,"Story":1800,"Links":10,"createdAt":1801,"updatedAt":1802,"publishedAt":1803,"MainVisualContent":1804,"Projects":1830,"Clients":1840,"Countries":1848,"Locations":1851,"Companies":1859,"Tags":1862},54,"Summary of 2018 in Sec Group!","summary-of-2018-in-sec-group","2019-01-02","2018 was a successful year for the Sec Group, we participated in two major projects of our regular customer Kvaerner Stord AS, during the reconstruction of the Njord platform (Njord A Future) and the Living Quarters module on the Johan Sverdrup project, as well as our engineering team took an active part in the first works for the Johan Castberg project. We also managed to establish cooperation with a new contractor of Westcon Yards AS, where our employees performed pipe work on several vessels. The Sec Group also participated in the refurbishment of the Jänschwalde coal-fired power plant in Germany. \nThe average employment in our company was over 200 employees, including more than 120 fitters-welders, about 50 scaffolders and over 30 insulation and interior fitters. At the peak of production, the Sec Group employed over 320 employees. We hope that 2019 will be equally successful and even better!","2022-04-16T19:01:35.390Z","2022-04-22T11:45:43.977Z","2022-04-16T19:01:36.843Z",{"id":1805,"name":1806,"alternativeText":1807,"caption":1807,"width":1030,"height":1808,"formats":1809,"hash":1826,"ext":123,"mime":126,"size":1827,"url":1828,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1829,"updatedAt":1829},75,"Night view on the site at Stord with lights on Njord A Future and Johan Sverdrup ULQ module.jpg","Night view on the site at Stord with lights on Njord A Future and Johan Sverdrup ULQ module",369,{"small":1810,"medium":1815,"thumbnail":1821},{"ext":123,"url":1811,"hash":1812,"mime":126,"name":1813,"path":10,"size":1814,"width":35,"height":436},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Night-view-on-the-site-at-Stord-with-lights-on-Njord-A-Future-and-Johan-Sverdrup-ULQ-module_2022-04-22T11-43-13.jpg","3f10e5c98102d7afd4e2ae9c36b48eb2","small_Night view on the site at Stord with lights on Njord A Future and Johan Sverdrup ULQ module.jpg",16.73,{"ext":123,"url":1816,"hash":1817,"mime":126,"name":1818,"path":10,"size":1819,"width":42,"height":1820},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Night-view-on-the-site-at-Stord-with-lights-on-Njord-A-Future-and-Johan-Sverdrup-ULQ-module_2022-04-22T11-43-13.jpg","41890866896df4b5fcfffd5c3c025f03","medium_Night view on the site at Stord with lights on Njord A Future and Johan Sverdrup ULQ module.jpg",32.98,346,{"ext":123,"url":1822,"hash":1823,"mime":126,"name":1824,"path":10,"size":1825,"width":240,"height":448},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Night-view-on-the-site-at-Stord-with-lights-on-Njord-A-Future-and-Johan-Sverdrup-ULQ-module_2022-04-22T11-43-12.jpg","2dce7591ed2f46a8ea6e1224beebb864","thumbnail_Night view on the site at Stord with lights on Njord A Future and Johan Sverdrup ULQ module.jpg",5.16,"860f606b5ba5db147c682ffa3898349b",198.48,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FNight-view-on-the-site-at-Stord-with-lights-on-Njord-A-Future-and-Johan-Sverdrup-ULQ-module_2022-04-22T11-43-12.jpg","2022-04-22T11:43:13.280Z",[1831,1832,1837,1838,1839],{"id":990,"Project":1652,"createdAt":1653,"updatedAt":1654,"publishedAt":1655},{"id":346,"Project":1833,"createdAt":1834,"updatedAt":1835,"publishedAt":1836},"Jänschwalde Power Plant Renovation","2022-04-19T08:41:40.189Z","2022-04-19T08:41:40.861Z","2022-04-19T08:41:40.859Z",{"id":1065,"Project":1251,"createdAt":1252,"updatedAt":1253,"publishedAt":1254},{"id":657,"Project":908,"createdAt":909,"updatedAt":910,"publishedAt":911},{"id":1554,"Project":1555,"createdAt":1556,"updatedAt":1557,"publishedAt":1558},[1841,1842,1843],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},{"id":1554,"Client":1658,"createdAt":1659,"updatedAt":1660,"publishedAt":1661},{"id":978,"Client":1844,"createdAt":1845,"updatedAt":1846,"publishedAt":1847},"SIK Peitz","2022-04-19T09:58:38.265Z","2022-04-19T09:58:38.754Z","2022-04-19T09:58:38.751Z",[1849,1850],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},{"id":353,"Country":545,"createdAt":546,"updatedAt":547,"publishedAt":548},[1852,1857,1858],{"id":551,"Location":1853,"createdAt":1854,"updatedAt":1855,"publishedAt":1856},"Jänschwalde","2022-04-19T10:01:55.590Z","2022-04-19T10:01:56.189Z","2022-04-19T10:01:56.185Z",{"id":663,"Location":1666,"createdAt":1667,"updatedAt":1668,"publishedAt":1669},{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[1860,1861],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1863,1864,1865,1866,1867,1868,1869,1870,1871,1872,1873,1874],{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":990,"Tag":991,"createdAt":992,"updatedAt":993,"publishedAt":994},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":984,"Tag":985,"createdAt":986,"updatedAt":987,"publishedAt":988},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":1876,"Title":1877,"Slug":1878,"Date":1879,"Story":1880,"Links":10,"createdAt":1881,"updatedAt":1882,"publishedAt":1883,"MainVisualContent":1884,"Projects":1913,"Clients":1915,"Countries":1917,"Locations":1919,"Companies":1920,"Tags":1922},53,"SEC crew on GRP course","sec-crew-on-grp-course","2018-02-20","This week, for the project Johan Sverdrup Living Quarter Topside EPC for Statoil, a team of SEC specialists in the field of thermal and acoustic insulation took a theoretical and practical GRP course using FTI materials:\n- FibaClad, \n- FibaRoll, \n- FibaGel \n- and FibaBond.\nTraining and certification of the SEC team took place under the supervision of our Norwegian partner Kvaerner.","2022-04-16T18:58:37.840Z","2022-04-22T11:40:44.907Z","2022-04-16T18:58:39.376Z",{"id":1885,"name":1886,"alternativeText":1887,"caption":1887,"width":1030,"height":1888,"formats":1889,"hash":1909,"ext":1891,"mime":126,"size":1910,"url":1911,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1912,"updatedAt":1912},73,"SEC crew on GRP course with Project Coordinator supervision.jfif","SEC crew on GRP course with Project Coordinator supervision",913,{"small":1890,"medium":1897,"thumbnail":1903},{"ext":1891,"url":1892,"hash":1893,"mime":126,"name":1894,"path":10,"size":1895,"width":1896,"height":35},".jfif","https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-crew-on-GRP-course-with-Project-Coordinator-supervision_2022-04-22T11-39-08.jfif","3faac044bf27244a9fa99169b048ffb0","small_SEC crew on GRP course with Project Coordinator supervision.jfif",47.77,438,{"ext":1891,"url":1898,"hash":1899,"mime":126,"name":1900,"path":10,"size":1901,"width":1902,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-crew-on-GRP-course-with-Project-Coordinator-supervision_2022-04-22T11-39-08.jfif","28f950ceb4ea562606978bce46c62e4b","medium_SEC crew on GRP course with Project Coordinator supervision.jfif",94.47,657,{"ext":1891,"url":1904,"hash":1905,"mime":126,"name":1906,"path":10,"size":1907,"width":1908,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-crew-on-GRP-course-with-Project-Coordinator-supervision_2022-04-22T11-39-08.jfif","9cc456effe49ea9effbacdf1c3ac2408","thumbnail_SEC crew on GRP course with Project Coordinator supervision.jfif",6.56,137,"f50b8003f363b63747c1401526e4a6f5",521,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-crew-on-GRP-course-with-Project-Coordinator-supervision_2022-04-22T11-39-08.jfif","2022-04-22T11:39:08.520Z",[1914],{"id":1065,"Project":1251,"createdAt":1252,"updatedAt":1253,"publishedAt":1254},[1916],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1918],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[],[1921],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1923,1928,1933],{"id":1554,"Tag":1924,"createdAt":1925,"updatedAt":1926,"publishedAt":1927},"Site-tests","2022-04-19T08:23:36.647Z","2022-04-19T08:23:37.421Z","2022-04-19T08:23:37.418Z",{"id":346,"Tag":1929,"createdAt":1930,"updatedAt":1931,"publishedAt":1932},"Training","2022-04-19T08:23:12.507Z","2022-04-19T08:23:27.549Z","2022-04-19T08:23:27.546Z",{"id":559,"Tag":1078,"createdAt":1079,"updatedAt":1080,"publishedAt":1081},{"id":1935,"Title":1936,"Slug":1937,"Date":1938,"Story":1939,"Links":10,"createdAt":1940,"updatedAt":1941,"publishedAt":1942,"MainVisualContent":1943,"Projects":1967,"Clients":1983,"Countries":1985,"Locations":1987,"Companies":1989,"Tags":1991},52,"Aasta Hansteen Spar FPSO","aasta-hansteen-spar-fpso","2018-01-08","The turn of the year 17\u002F18 have passed with welding and fitting works during the task of connecting Aasta Hansteen platform deck to the SPAR hull.\nThe components ordered by Statoil were made at the Korean HHI shipyard, and after transporting them to Norway, the connecting works are carried out under the supervision of Kvaerner at Stord. The platform deck together with a conventional gas cleaning installation weighs 24 thousand tons, and is maintained on the SPAR hull with a total height of 200 m and displacement of up to 146 thousand tons.","2022-04-16T18:57:31.044Z","2022-04-22T11:34:02.391Z","2022-04-16T18:57:32.310Z",{"id":1944,"name":1945,"alternativeText":1946,"caption":1946,"width":1030,"height":1031,"formats":1947,"hash":1963,"ext":123,"mime":126,"size":1964,"url":1965,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":1966,"updatedAt":1966},72,"SEC norge personel working on sea traial of Aasta Hansteen Spar FPSO.jpg","SEC norge personel working on sea traial of Aasta Hansteen Spar FPSO",{"small":1948,"medium":1953,"thumbnail":1958},{"ext":123,"url":1949,"hash":1950,"mime":126,"name":1951,"path":10,"size":1952,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-norge-personel-working-on-sea-traial-of-Aasta-Hansteen-Spar-FPSO_2022-04-22T11-32-18.jpg","c29bf5fc782bb43584fdcd6523973eaf","small_SEC norge personel working on sea traial of Aasta Hansteen Spar FPSO.jpg",43.39,{"ext":123,"url":1954,"hash":1955,"mime":126,"name":1956,"path":10,"size":1957,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-norge-personel-working-on-sea-traial-of-Aasta-Hansteen-Spar-FPSO_2022-04-22T11-32-17.jpg","621a42f3695ac8f105ec4afeeba9994a","medium_SEC norge personel working on sea traial of Aasta Hansteen Spar FPSO.jpg",83.6,{"ext":123,"url":1959,"hash":1960,"mime":126,"name":1961,"path":10,"size":1962,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-norge-personel-working-on-sea-traial-of-Aasta-Hansteen-Spar-FPSO_2022-04-22T11-32-17.jpg","5194523ccddb9904b605c2bd86698835","thumbnail_SEC norge personel working on sea traial of Aasta Hansteen Spar FPSO.jpg",10.03,"c51704dda4fb9f6a4df51d6455155d6d",399.77,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-norge-personel-working-on-sea-traial-of-Aasta-Hansteen-Spar-FPSO_2022-04-22T11-32-17.jpg","2022-04-22T11:32:18.107Z",[1968,1973,1978],{"id":353,"Project":1969,"createdAt":1970,"updatedAt":1971,"publishedAt":1972},"Aasta Hansteen SAPR","2022-04-19T08:39:30.952Z","2022-04-19T08:39:31.887Z","2022-04-19T08:39:31.884Z",{"id":360,"Project":1974,"createdAt":1975,"updatedAt":1976,"publishedAt":1977},"Aasta Hansteen Hull and Topside","2022-04-19T08:39:21.777Z","2022-04-19T08:39:22.623Z","2022-04-19T08:39:22.620Z",{"id":559,"Project":1979,"createdAt":1980,"updatedAt":1981,"publishedAt":1982},"Aasta Hansteen","2022-04-19T08:39:10.952Z","2022-04-19T08:39:11.810Z","2022-04-19T08:39:11.808Z",[1984],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[1986],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[1988],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[1990],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[1992,1993,1994,1995,1996],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":1998,"Title":1999,"Slug":2000,"Date":2001,"Story":2002,"Links":10,"createdAt":2003,"updatedAt":2004,"publishedAt":2005,"MainVisualContent":2006,"Projects":2033,"Clients":2034,"Countries":2035,"Locations":2037,"Companies":2039,"Tags":2041},51,"SEC Pomorze is moving to the new office","sec-pomorze-is-moving-to-the-new-office","2017-09-01","We are pleased to announce that from September 01, 2017 we are available under the new office address 12 Twarda St., 80-871 Gdańsk.\n\nOpening hours:\n07:00 - 15:00\nMon.- Fri.","2022-04-16T18:56:32.672Z","2022-04-22T11:29:09.213Z","2022-04-16T18:56:33.836Z",{"id":1020,"name":2007,"alternativeText":2008,"caption":2008,"width":1030,"height":2009,"formats":2010,"hash":2029,"ext":1891,"mime":126,"size":2030,"url":2031,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2032,"updatedAt":2032},"New headquarters in Gdańsk.jfif","New headquarters in Gdańsk",589,{"small":2011,"medium":2017,"thumbnail":2023},{"ext":1891,"url":2012,"hash":2013,"mime":126,"name":2014,"path":10,"size":2015,"width":35,"height":2016},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_New-headquarters-in-Gda%C5%84sk_2022-04-22T11-28-39.jfif","1fc3b2d953c8dee2eb80920d9181771e","small_New headquarters in Gdańsk.jfif",24.76,368,{"ext":1891,"url":2018,"hash":2019,"mime":126,"name":2020,"path":10,"size":2021,"width":42,"height":2022},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_New-headquarters-in-Gda%C5%84sk_2022-04-22T11-28-39.jfif","9585555e848aaf3d3d16b7e3b3d611f6","medium_New headquarters in Gdańsk.jfif",44.16,552,{"ext":1891,"url":2024,"hash":2025,"mime":126,"name":2026,"path":10,"size":2027,"width":2028,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_New-headquarters-in-Gda%C5%84sk_2022-04-22T11-28-39.jfif","a0671cbedee575e665cf6d00fbf85f1a","thumbnail_New headquarters in Gdańsk.jfif",7.12,212,"360ffe586367dcf30f15f4647db8d116",280.12,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FNew-headquarters-in-Gda%C5%84sk_2022-04-22T11-28-38.jfif","2022-04-22T11:28:39.238Z",[],[],[2036],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[2038],{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[2040],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[2042],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":2044,"Title":2045,"Slug":2046,"Date":2047,"Story":2048,"Links":10,"createdAt":2049,"updatedAt":2050,"publishedAt":2051,"MainVisualContent":2052,"Projects":2074,"Clients":2080,"Countries":2086,"Locations":2088,"Companies":2090,"Tags":2092},50,"SEC Group on EFRA Project","sec-group-on-efra-project","2017-08-01","The SEC Group has established cooperation with KB Pomorze. Which is the contractor for over a hundred inter-object pipelines and the natural gas pipeline under the EFRA Project for LOTOS Group. Our specialists have been performing welding and assembly works for pipeline construction since the beginning of August.\nThis is one of the major contracts under the EFRA Project. The value of this investment is 46.4 million PLN.","2022-04-16T18:55:24.743Z","2022-04-22T10:58:59.550Z","2022-04-16T18:55:26.074Z",{"id":1084,"name":2053,"alternativeText":2054,"caption":2054,"width":2055,"height":2056,"formats":2057,"hash":2070,"ext":21,"mime":24,"size":2071,"url":2072,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2073,"updatedAt":2073},"EFRA LOTOS.png","EFRA LOTOS",604,298,{"small":2058,"thumbnail":2064},{"ext":21,"url":2059,"hash":2060,"mime":24,"name":2061,"path":10,"size":2062,"width":35,"height":2063},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_EFRA-LOTOS_2022-04-22T10-58-10.png","5d084aa775770f98ac05152b421a2e99","small_EFRA LOTOS.png",161.76,247,{"ext":21,"url":2065,"hash":2066,"mime":24,"name":2067,"path":10,"size":2068,"width":240,"height":2069},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_EFRA-LOTOS_2022-04-22T10-58-10.png","cffad939dd47632e0ecf3d99b71f81ce","thumbnail_EFRA LOTOS.png",46.27,121,"6f206dc301d15146b49c8ba86d295497",174.27,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FEFRA-LOTOS_2022-04-22T10-58-10.png","2022-04-22T10:58:10.828Z",[2075],{"id":339,"Project":2076,"createdAt":2077,"updatedAt":2078,"publishedAt":2079},"EFRA","2022-04-19T08:40:22.823Z","2022-04-19T08:40:23.779Z","2022-04-19T08:40:23.775Z",[2081],{"id":551,"Client":2082,"createdAt":2083,"updatedAt":2084,"publishedAt":2085},"KB Pomorze","2022-04-19T09:58:11.091Z","2022-04-19T09:58:11.679Z","2022-04-19T09:58:11.676Z",[2087],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[2089],{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[2091],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[2093,2094,2095,2096],{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":2098,"Title":2099,"Slug":2100,"Date":2101,"Story":2102,"Links":10,"createdAt":2103,"updatedAt":2104,"publishedAt":2105,"MainVisualContent":10,"Projects":2106,"Clients":2107,"Countries":2113,"Locations":2115,"Companies":2121,"Tags":2123},49,"New SEC`s client - HMR Group","new-sec-s-client-hmr-group","2017-07-29","At the beginning of July we established cooperation with the HMR group. At client`s yard in Husnes, our specialists have performed welding of components of aluminum melting furnaces.\nThe furnaces will be delivered to one of the Norsk Hydro ASA plants, the worldwide leader in the aluminum industry.","2022-04-16T18:54:29.671Z","2022-04-22T10:46:46.647Z","2022-04-16T18:54:31.135Z",[],[2108],{"id":339,"Client":2109,"createdAt":2110,"updatedAt":2111,"publishedAt":2112},"HMR","2022-04-19T09:58:04.031Z","2022-04-19T09:58:04.683Z","2022-04-19T09:58:04.680Z",[2114],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2116],{"id":339,"Location":2117,"createdAt":2118,"updatedAt":2119,"publishedAt":2120},"Husnes","2022-04-19T10:01:47.900Z","2022-04-19T10:01:48.606Z","2022-04-19T10:01:48.603Z",[2122],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2124,2125,2126,2127],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":2129,"Title":2130,"Slug":2131,"Date":2132,"Story":2133,"Links":10,"createdAt":2134,"updatedAt":2135,"publishedAt":2136,"MainVisualContent":2137,"Projects":2164,"Clients":2165,"Countries":2167,"Locations":2169,"Companies":2171,"Tags":2173},48,"Extension of cooperation with Kværner AS at Stord","extension-of-cooperation-with-kvaerner-as-at-stord","2017-04-30","In April 2017, as a confirmation of our many years’ cooperation, SEC Norge signed another long-term framework contract with Kværner AS to provide qualified personnel. Thanks to the professional work of SEC specialists we were once again appreciated as a reliable subcontractor. Our effectiveness has allowed us to expand cooperation with disciplines such as assembly of scaffoldings and insulation.\nAs a responsible and aware employer we actively cooperate with trade unions. Together with a new contract we have implemented new basic rate raise for our personnel, all according to the present unions’ regulations and recommendations.","2022-04-16T18:49:18.745Z","2022-04-22T10:45:17.488Z","2022-04-16T18:49:19.959Z",{"id":1149,"name":2138,"alternativeText":2139,"caption":2139,"width":1030,"height":2140,"formats":2141,"hash":2160,"ext":123,"mime":126,"size":2161,"url":2162,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2163,"updatedAt":2163},"Extension of cooperation with Kværner AS at Stord.jpg","Extension of cooperation with Kværner AS at Stord - Photo: Kvaerner",350,{"small":2142,"medium":2148,"thumbnail":2154},{"ext":123,"url":2143,"hash":2144,"mime":126,"name":2145,"path":10,"size":2146,"width":35,"height":2147},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Extension-of-cooperation-with-Kv%C3%A6rner-AS-at-Stord_2022-04-22T10-43-44.jpg","0475b67b528559401059af1ccc2e8a4d","small_Extension of cooperation with Kværner AS at Stord.jpg",27.8,219,{"ext":123,"url":2149,"hash":2150,"mime":126,"name":2151,"path":10,"size":2152,"width":42,"height":2153},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Extension-of-cooperation-with-Kv%C3%A6rner-AS-at-Stord_2022-04-22T10-43-44.jpg","05bc5b4931bfb366e6d597798ed81881","medium_Extension of cooperation with Kværner AS at Stord.jpg",54.6,328,{"ext":123,"url":2155,"hash":2156,"mime":126,"name":2157,"path":10,"size":2158,"width":240,"height":2159},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Extension-of-cooperation-with-Kv%C3%A6rner-AS-at-Stord_2022-04-22T10-43-44.jpg","6db6965b44bf5158e8fbaec808d2cb1b","thumbnail_Extension of cooperation with Kværner AS at Stord.jpg",7.81,107,"420517180e83371be452f9611e77adbb",268.31,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FExtension-of-cooperation-with-Kv%C3%A6rner-AS-at-Stord_2022-04-22T10-43-43.jpg","2022-04-22T10:43:44.370Z",[],[2166],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2168],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2170],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2172],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2174,2179],{"id":1065,"Tag":2175,"createdAt":2176,"updatedAt":2177,"publishedAt":2178},"Frame agreement","2022-04-19T08:24:10.121Z","2022-04-19T08:24:13.230Z","2022-04-19T08:24:13.225Z",{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":2181,"Title":2182,"Slug":2183,"Date":2184,"Story":2185,"Links":10,"createdAt":2186,"updatedAt":2187,"publishedAt":2188,"MainVisualContent":2189,"Projects":2216,"Clients":2217,"Countries":2218,"Locations":2220,"Companies":2222,"Tags":2224},47," SEC prolongs membership in JQS Achilles system","sec-prolongs-membership-in-jqs-achilles-system","2017-02-28","Again we have met all the requirements for the companies associated in JQS Achilles. The system gathers all the verified suppliers from oil & gas industry from Norway and Denmark.Biggest partners included in Achilles system are e.g.: Aibel, Aker Solutions, Shell, Statoil, ConocoPhillips.","2022-04-16T18:47:21.950Z","2022-04-22T10:42:07.440Z","2022-04-16T18:47:23.009Z",{"id":2190,"name":2191,"alternativeText":2192,"caption":2192,"width":2193,"height":2194,"formats":2195,"hash":2213,"ext":21,"mime":24,"size":896,"url":2214,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2215,"updatedAt":2215},67,"Achilles JQS SEC Norge ID 60881 2017-2018.png","Achilles JQS SEC Norge ID 60881 2017-2018",683,883,{"small":2196,"medium":2202,"thumbnail":2208},{"ext":21,"url":2197,"hash":2198,"mime":24,"name":2199,"path":10,"size":2200,"width":2201,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Achilles-JQS-SEC-Norge-ID-60881-2017-2018_2022-04-22T10-41-45.png","88441ba3ec8dbca46069d439c8180a20","small_Achilles JQS SEC Norge ID 60881 2017-2018.png",76.79,387,{"ext":21,"url":2203,"hash":2204,"mime":24,"name":2205,"path":10,"size":2206,"width":2207,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Achilles-JQS-SEC-Norge-ID-60881-2017-2018_2022-04-22T10-41-45.png","97f2d0633d77f39c9c14cd481faac1b3","medium_Achilles JQS SEC Norge ID 60881 2017-2018.png",142.66,580,{"ext":21,"url":2209,"hash":2210,"mime":24,"name":2211,"path":10,"size":2212,"width":2069,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Achilles-JQS-SEC-Norge-ID-60881-2017-2018_2022-04-22T10-41-44.png","bea124360edb1b154dec5005db88c1ae","thumbnail_Achilles JQS SEC Norge ID 60881 2017-2018.png",11.34,"36e52f0ad797f84367da8baf4edca6d3","https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FAchilles-JQS-SEC-Norge-ID-60881-2017-2018_2022-04-22T10-41-44.png","2022-04-22T10:41:45.631Z",[],[],[2219],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2221],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2223],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2225,2226],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":559,"Tag":1078,"createdAt":1079,"updatedAt":1080,"publishedAt":1081},{"id":2228,"Title":2229,"Slug":2230,"Date":2231,"Story":2232,"Links":10,"createdAt":2233,"updatedAt":2234,"publishedAt":2235,"MainVisualContent":2236,"Projects":2251,"Clients":2253,"Countries":2255,"Locations":2257,"Companies":2259,"Tags":2261},46,"February 2017, SEC starts fitting and welding works on Njord A platform","february-2017-sec-starts-fitting-and-welding-works-on-njord-a-platform","2017-02-12","In February, at Kvaerner’s site in Stord, we started first repair and modernization works concerning Njord A production platform.\nNjord Future Project - SEC Norge employees carry out fitting and welding works related to the assembly of pontoon reinforcements, in order to enhance the buoyancy of the hull.\nNjord A was originally delivered in 1997 by the organisation which is today Kvaerner. The topside was fabricated at Stord while the hull was fabricated at Verdal. Njord A was the first so-called Norsok project (a joint industry program in the 1990s to improve costs due to low oil prices) at the Norwegian continental shelf.","2022-04-16T18:46:36.625Z","2022-04-22T10:40:03.152Z","2022-04-16T18:46:37.901Z",{"id":1191,"name":2237,"alternativeText":2238,"caption":2238,"width":1483,"height":2239,"formats":2240,"hash":2247,"ext":123,"mime":126,"size":2248,"url":2249,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2250,"updatedAt":2250},"Njord A platform Photo - Statoil.jpg","Njord A platform Photo - Statoil",400,{"thumbnail":2241},{"ext":123,"url":2242,"hash":2243,"mime":126,"name":2244,"path":10,"size":2245,"width":2246,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Njord-A-platform-Photo---Statoil_2022-04-22T10-38-52.jpg","41eeea93f6a12114bd478cd3258da450","thumbnail_Njord A platform Photo - Statoil.jpg",6.5,175,"6e76bcfc817a34bbce1b7d9c2adb0f4b",115.12,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FNjord-A-platform-Photo---Statoil_2022-04-22T10-38-52.jpg","2022-04-22T10:38:52.922Z",[2252],{"id":657,"Project":908,"createdAt":909,"updatedAt":910,"publishedAt":911},[2254],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2256],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2258],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2260],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2262,2263,2264],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":2266,"Title":2267,"Slug":2268,"Date":2269,"Story":2270,"Links":10,"createdAt":2271,"updatedAt":2272,"publishedAt":2273,"MainVisualContent":2274,"Projects":2302,"Clients":2304,"Countries":2306,"Locations":2308,"Companies":2310,"Tags":2312},45,"Second half of January 2017, SEC Group expansion on Johan Sverdrup project","second-half-of-january-2017-sec-group-expansion-on-johan-sverdrup-project","2017-01-23","In the second half of January 2017, our next teams started works on the Johan Sverdrup project. This time we deliver specialists in the field of installation of industrial scaffoldings for works on Utility and Living Quarters module for Johan Sverdrup platform.","2022-04-16T18:45:55.179Z","2022-04-21T13:16:04.865Z","2022-04-16T18:45:56.622Z",{"id":1241,"name":2275,"alternativeText":2276,"caption":2276,"width":2277,"height":2278,"formats":2279,"hash":2298,"ext":123,"mime":126,"size":2299,"url":2300,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2301,"updatedAt":2301},"SEC Group expansion on Johan Sverdrup project.jpg","SEC Group expansion on Johan Sverdrup project",785,409,{"small":2280,"medium":2286,"thumbnail":2292},{"ext":123,"url":2281,"hash":2282,"mime":126,"name":2283,"path":10,"size":2284,"width":35,"height":2285},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Group-expansion-on-Johan-Sverdrup-project_2022-04-21T13-15-29.jpg","4cdc14b514ba173bb01dc62e248ae1bc","small_SEC Group expansion on Johan Sverdrup project.jpg",25.94,261,{"ext":123,"url":2287,"hash":2288,"mime":126,"name":2289,"path":10,"size":2290,"width":42,"height":2291},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Group-expansion-on-Johan-Sverdrup-project_2022-04-21T13-15-29.jpg","e4cc54e806e6aedce3a119e25da5ba79","medium_SEC Group expansion on Johan Sverdrup project.jpg",55.03,391,{"ext":123,"url":2293,"hash":2294,"mime":126,"name":2295,"path":10,"size":2296,"width":240,"height":2297},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Group-expansion-on-Johan-Sverdrup-project_2022-04-21T13-15-29.jpg","1e366de590a5389ef39591583dfc3969","thumbnail_SEC Group expansion on Johan Sverdrup project.jpg",6.82,128,"3ed7bf5f07895cdb91d23424b24d9581",201.98,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Group-expansion-on-Johan-Sverdrup-project_2022-04-21T13-15-29.jpg","2022-04-21T13:15:29.390Z",[2303],{"id":1065,"Project":1251,"createdAt":1252,"updatedAt":1253,"publishedAt":1254},[2305],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2307],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2309],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2311],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2313,2314],{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":858,"Tag":859,"createdAt":860,"updatedAt":861,"publishedAt":862},{"id":2316,"Title":2317,"Slug":2318,"Date":2319,"Story":2320,"Links":10,"createdAt":2321,"updatedAt":2322,"publishedAt":2323,"MainVisualContent":2324,"Projects":2346,"Clients":2348,"Countries":2350,"Locations":2352,"Companies":2354,"Tags":2356},44,"SEC Group starts 2017 with initial works on Johan Sverdrup","sec-group-starts-2017-with-initial-works-on-johan-sverdrup","2017-01-08","At the beginning of 2017, our specialists responsible for the installation of thermal insulation started work on a new project for our regular customer Kvaerner AS, at the yard in Stord. The work concerns the Utility and Living Quarters module of Johan Sverdrup platform.\nJohan Sverdrup Field is located in North Sea and is one of the largest oil fields on Norwegian Continental Shelf (NCS). Estimated full capacity will account for about 40% of total oil output on NCS, i.e. 550-650 thousand barrels of oil per day.","2022-04-16T18:45:16.744Z","2022-04-21T13:14:20.209Z","2022-04-16T18:45:18.055Z",{"id":1277,"name":2325,"alternativeText":2317,"caption":2317,"width":1030,"height":1483,"formats":2326,"hash":2342,"ext":123,"mime":126,"size":2343,"url":2344,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2345,"updatedAt":2345},"SEC Group starts 2017 with initial works on Johan Sverdrup.jpg",{"small":2327,"medium":2332,"thumbnail":2337},{"ext":123,"url":2328,"hash":2329,"mime":126,"name":2330,"path":10,"size":2331,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Group-starts-2017-with-initial-works-on-Johan-Sverdrup_2022-04-21T13-11-48.jpg","a1ff6e75f7a9fa51204682a5c1869512","small_SEC Group starts 2017 with initial works on Johan Sverdrup.jpg",20.72,{"ext":123,"url":2333,"hash":2334,"mime":126,"name":2335,"path":10,"size":2336,"width":42,"height":141},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Group-starts-2017-with-initial-works-on-Johan-Sverdrup_2022-04-21T13-11-48.jpg","95d551b8fe12ac3d2ee8c76dae14b90e","medium_SEC Group starts 2017 with initial works on Johan Sverdrup.jpg",41.76,{"ext":123,"url":2338,"hash":2339,"mime":126,"name":2340,"path":10,"size":2341,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Group-starts-2017-with-initial-works-on-Johan-Sverdrup_2022-04-21T13-11-48.jpg","d36c6ade0e2c16ada8561dac372cdf6d","thumbnail_SEC Group starts 2017 with initial works on Johan Sverdrup.jpg",6.04,"33ca466dd142aa31157d189111e3e8ab",228.56,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Group-starts-2017-with-initial-works-on-Johan-Sverdrup_2022-04-21T13-11-48.jpg","2022-04-21T13:11:48.693Z",[2347],{"id":1065,"Project":1251,"createdAt":1252,"updatedAt":1253,"publishedAt":1254},[2349],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2351],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2353],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2355],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2357],{"id":551,"Tag":675,"createdAt":676,"updatedAt":677,"publishedAt":678},{"id":2359,"Title":2360,"Slug":2361,"Date":2362,"Story":2363,"Links":10,"createdAt":2364,"updatedAt":2365,"publishedAt":2366,"MainVisualContent":10,"Projects":2367,"Clients":2374,"Countries":2380,"Locations":2386,"Companies":2397,"Tags":2399},43,"The SEC Group launches works on the Asian Market. The new contract with Konecranes Finland Corporation (Shanghai, China)","the-sec-group-launches-works-on-the-asian-market-the-new-contract-with-konecranes-finland-corporation-shanghai-china","2016-08-01","On 1st of August, employees of the SEC group commenced repair and welding works of the rail mounted gantry cranes (RMG) for the purposes of Pelindo III project.\nTwo teams of steel construction welding experts together with the project coordinator have begun their work on the premises of Jiangsu Hailong Heavy Machinery production plant in Nantong, China.\nWe proudly announce that the first leg of repair works has passed the acceptance tests and components of the gantry cranes shall soon be ready for the final assembly. The machines are meant to operate at the container terminal in Indonesia.","2022-04-16T18:44:18.998Z","2022-04-21T13:09:13.859Z","2022-04-16T18:44:20.360Z",[2368],{"id":2369,"Project":2370,"createdAt":2371,"updatedAt":2372,"publishedAt":2373},27,"Pelindo III","2022-04-19T08:43:34.358Z","2022-04-19T08:43:35.026Z","2022-04-19T08:43:35.023Z",[2375],{"id":858,"Client":2376,"createdAt":2377,"updatedAt":2378,"publishedAt":2379},"Konecranes","2022-04-19T09:58:18.649Z","2022-04-19T09:58:19.573Z","2022-04-19T09:58:19.571Z",[2381],{"id":559,"Country":2382,"createdAt":2383,"updatedAt":2384,"publishedAt":2385},"China","2022-04-19T10:04:42.473Z","2022-04-19T10:04:43.540Z","2022-04-19T10:04:43.537Z",[2387,2392],{"id":858,"Location":2388,"createdAt":2389,"updatedAt":2390,"publishedAt":2391},"Nantong","2022-04-19T10:02:01.532Z","2022-04-19T10:02:02.144Z","2022-04-19T10:02:02.141Z",{"id":978,"Location":2393,"createdAt":2394,"updatedAt":2395,"publishedAt":2396},"Shanghai","2022-04-19T10:02:24.399Z","2022-04-19T10:02:25.091Z","2022-04-19T10:02:25.088Z",[2398],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[2400,2401,2402,2403,2404],{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":984,"Tag":985,"createdAt":986,"updatedAt":987,"publishedAt":988},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":1002,"Tag":1003,"createdAt":1004,"updatedAt":1005,"publishedAt":1006},{"id":1944,"Title":2406,"Slug":2407,"Date":2408,"Story":2409,"Links":10,"createdAt":2410,"updatedAt":2411,"publishedAt":2412,"MainVisualContent":2413,"Projects":2438,"Clients":2439,"Countries":2440,"Locations":2442,"Companies":2444,"Tags":2446},"SEC Group becomes a partner of the “Achilles JQS” system, aimed at the identification and verification of oil industry suppliers","sec-group-becomes-a-partner-of-the-achilles-jqs-system-aimed-at-the-identification-and-verification-of-oil-industry-suppliers","2016-03-29","The main goal of the system is to evaluate and verify Norwegian and Danish suppliers of products and services in the petroleum industry, as well as to facilitate cooperation between the partners. SEC Group has therefore decided to join the above-mentioned system.\nThe major partners belonging to “Achilles JQS” include Aibel, Aker Solutions, Shell, Statoil, and ConocoPhillips.","2022-04-19T06:35:57.286Z","2022-04-21T12:59:31.254Z","2022-04-19T06:35:58.852Z",{"id":1378,"name":2414,"alternativeText":2415,"caption":2415,"width":2416,"height":2417,"formats":2418,"hash":2434,"ext":1891,"mime":126,"size":2435,"url":2436,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2437,"updatedAt":2437},"Achilles JQS SEC Norge ID 60881.jfif","Achilles JQS SEC Norge ID 60881",697,985,{"small":2419,"medium":2424,"thumbnail":2429},{"ext":1891,"url":2420,"hash":2421,"mime":126,"name":2422,"path":10,"size":2423,"width":84,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Achilles-JQS-SEC-Norge-ID-60881_2022-04-21T12-58-01.jfif","e8b27d1e8569821a19ac0b58d2bd3ef6","small_Achilles JQS SEC Norge ID 60881.jfif",31.16,{"ext":1891,"url":2425,"hash":2426,"mime":126,"name":2427,"path":10,"size":2428,"width":90,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Achilles-JQS-SEC-Norge-ID-60881_2022-04-21T12-58-01.jfif","a74064b1930aa3e68f5fd08024443abb","medium_Achilles JQS SEC Norge ID 60881.jfif",60.04,{"ext":1891,"url":2430,"hash":2431,"mime":126,"name":2432,"path":10,"size":2433,"width":48,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Achilles-JQS-SEC-Norge-ID-60881_2022-04-21T12-58-01.jfif","9eaf4a30624238d210c97e7bb9cef3b9","thumbnail_Achilles JQS SEC Norge ID 60881.jfif",4.07,"5aeaa4367f8a13feffa60cd6035a029a",248.65,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FAchilles-JQS-SEC-Norge-ID-60881_2022-04-21T12-58-01.jfif","2022-04-21T12:58:01.843Z",[],[],[2441],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2443],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2445],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2447,2448],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":559,"Tag":1078,"createdAt":1079,"updatedAt":1080,"publishedAt":1081},{"id":2450,"Title":2451,"Slug":2452,"Date":2453,"Story":2454,"Links":10,"createdAt":2455,"updatedAt":2456,"publishedAt":2457,"MainVisualContent":2458,"Projects":2481,"Clients":2483,"Countries":2485,"Locations":2487,"Companies":2489,"Tags":2491},42,"Nyhamna Project at the Kvaerner Stord AS production plant enters a new stage","nyhamna-project-at-the-kvaerner-stord-as-production-plant-enters-a-new-stage","2015-11-05","Having recognised the high quality of our services, our client Kvaerner Stord AS commissioned SEC Group with the prefabrication of pipes that will connect the modules being installed at the Ormen Lange gas production and processing plant, located on the Norwegian island of Nyhamna.\nThe pipeline fabrication process is subject to strict regulations regarding dimensional tolerances, which will allow for the pipes to be mounted on the construction site in a smooth and timely manner. During the Nyhamna Project, we are once again working with a full range of steel types used in production:\n- carbon steel,\n- stainless steel,\n- 6MO,\n- duplex,\n- super duplex,\n- Inconel,\n- as well as titanium.","2022-04-16T18:42:02.447Z","2022-04-21T12:53:59.936Z","2022-04-16T18:42:03.720Z",{"id":1617,"name":2459,"alternativeText":2460,"caption":2460,"width":1030,"height":1483,"formats":2461,"hash":2477,"ext":1204,"mime":126,"size":2478,"url":2479,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2480,"updatedAt":2480},"Preparing of piping spools for Nyhamna Project at Stord yard.JPG","Preparing of piping spools for Nyhamna Project at Stord yard",{"small":2462,"medium":2467,"thumbnail":2472},{"ext":1204,"url":2463,"hash":2464,"mime":126,"name":2465,"path":10,"size":2466,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Preparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","171efb0b5f703fc49828e1a9b5ddc9b2","small_Preparing of piping spools for Nyhamna Project at Stord yard.JPG",34.1,{"ext":1204,"url":2468,"hash":2469,"mime":126,"name":2470,"path":10,"size":2471,"width":42,"height":141},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Preparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","cc4fda61c1d61d5b1e6d889dad53e5cd","medium_Preparing of piping spools for Nyhamna Project at Stord yard.JPG",63.47,{"ext":1204,"url":2473,"hash":2474,"mime":126,"name":2475,"path":10,"size":2476,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Preparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","a99bc670b896ac65c3d555aeeb21c1c7","thumbnail_Preparing of piping spools for Nyhamna Project at Stord yard.JPG",10.46,"64924deec44c25e7cfa6c7dde49134eb",279.21,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FPreparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","2022-04-21T12:49:46.936Z",[2482],{"id":680,"Project":1771,"createdAt":1772,"updatedAt":1773,"publishedAt":1774},[2484],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2486],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2488],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2490],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2492,2493,2494,2495,2496,2497],{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":2190,"Title":2499,"Slug":2500,"Date":2501,"Story":2502,"Links":10,"createdAt":2503,"updatedAt":2504,"publishedAt":2505,"MainVisualContent":10,"Projects":2506,"Clients":2507,"Countries":2508,"Locations":2510,"Companies":2516,"Tags":2519},"SEC Group visited The Offshore Technology Days 2015 in Stavanger, Norway","sec-group-visited-the-offshore-technology-days-2015-in-stavanger-norway","2015-10-23","Once again SEC Group visited OTD 2015 STAVANGER, in this year exhibition attracts an audience of engineers, industry leaders and experts in the offshore industry. Over the last six years OTD2015 has been the largest annual Norwegian oil exhibition attracting close to 30.000 visitors from 36 nations and over 500 exhibitors.","2022-04-19T06:18:18.177Z","2022-04-21T12:14:47.000Z","2022-04-19T06:18:19.433Z",[],[],[2509],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2511],{"id":1002,"Location":2512,"createdAt":2513,"updatedAt":2514,"publishedAt":2515},"Stavanger","2022-04-19T10:03:10.847Z","2022-04-19T10:03:11.414Z","2022-04-19T10:03:11.412Z",[2517,2518],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2520],{"id":577,"Tag":1424,"createdAt":1425,"updatedAt":1426,"publishedAt":1427},{"id":2522,"Title":2523,"Slug":2524,"Date":2525,"Story":2526,"Links":10,"createdAt":2527,"updatedAt":2528,"publishedAt":2529,"MainVisualContent":2530,"Projects":2553,"Clients":2554,"Countries":2555,"Locations":2561,"Companies":2567,"Tags":2570},41,"SEC Group representatives visited the Trade Offshore Energy Exhibition & Conference in RAI Centre\u002F Amsterdam, Netherlands","sec-group-representatives-visited-the-trade-offshore-energy-exhibition-and-conference-in-rai-centre-amsterdam-netherlands","2015-10-16","Since 2008 Trade Offshore Energy in Amsterdam has promoted the well-known and experienced specialists in the offshore industry. Year after year its popularity is rising steadily, in 2014 edition it attracted approx. 13,500 attendees, representing 81 nationalities, which gives an increase of 47%. The main objective of our presence at Offshore Energy 15 was to establish new contacts with potential customers, as well as to meet with our existing clients. Offshore Energy Days also gave us a chance to present our possibilities for cooperation within the European market.","2022-04-16T18:32:58.877Z","2022-04-21T12:14:10.381Z","2022-04-16T18:33:00.213Z",{"id":1796,"name":2531,"alternativeText":2532,"caption":2532,"width":1030,"height":1031,"formats":2533,"hash":2549,"ext":1034,"mime":24,"size":2550,"url":2551,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2552,"updatedAt":2552},"SEC Group representatives visited the Trade Offshore Energy Exhibition and Conference in RAI Centre Amsterdam Netherlands.PNG","SEC Group representatives visited the Trade Offshore Energy Exhibition and Conference in RAI Centre Amsterdam Netherlands",{"small":2534,"medium":2539,"thumbnail":2544},{"ext":1034,"url":2535,"hash":2536,"mime":24,"name":2537,"path":10,"size":2538,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Group-representatives-visited-the-Trade-Offshore-Energy-Exhibition-and-Conference-in-RAI-Centre-Amsterdam-Netherlands_2022-04-21T12-03-07.PNG","705604bcad3f9f24cf1174f5e4d1afe7","small_SEC Group representatives visited the Trade Offshore Energy Exhibition and Conference in RAI Centre Amsterdam Netherlands.PNG",41.56,{"ext":1034,"url":2540,"hash":2541,"mime":24,"name":2542,"path":10,"size":2543,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Group-representatives-visited-the-Trade-Offshore-Energy-Exhibition-and-Conference-in-RAI-Centre-Amsterdam-Netherlands_2022-04-21T12-03-07.PNG","ba9fb04952a8bc869c61fcc0d6cca4d9","medium_SEC Group representatives visited the Trade Offshore Energy Exhibition and Conference in RAI Centre Amsterdam Netherlands.PNG",76.48,{"ext":1034,"url":2545,"hash":2546,"mime":24,"name":2547,"path":10,"size":2548,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Group-representatives-visited-the-Trade-Offshore-Energy-Exhibition-and-Conference-in-RAI-Centre-Amsterdam-Netherlands_2022-04-21T12-03-07.PNG","6f5b1319178cf33efcc8d058693418c4","thumbnail_SEC Group representatives visited the Trade Offshore Energy Exhibition and Conference in RAI Centre Amsterdam Netherlands.PNG",10.38,"6051f1c3ec2ad3f417aeee8ee83f6445",377.61,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Group-representatives-visited-the-Trade-Offshore-Energy-Exhibition-and-Conference-in-RAI-Centre-Amsterdam-Netherlands_2022-04-21T12-03-07.PNG","2022-04-21T12:03:07.565Z",[],[],[2556],{"id":566,"Country":2557,"createdAt":2558,"updatedAt":2559,"publishedAt":2560},"Netherlands","2022-04-19T10:06:25.999Z","2022-04-19T10:06:42.120Z","2022-04-19T10:06:27.617Z",[2562],{"id":559,"Location":2563,"createdAt":2564,"updatedAt":2565,"publishedAt":2566},"Amsterdam","2022-04-19T10:00:50.614Z","2022-04-19T10:00:52.108Z","2022-04-19T10:00:52.104Z",[2568,2569],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2571],{"id":577,"Tag":1424,"createdAt":1425,"updatedAt":1426,"publishedAt":1427},{"id":2573,"Title":2574,"Slug":2575,"Date":2576,"Story":2577,"Links":10,"createdAt":2578,"updatedAt":2579,"publishedAt":2580,"MainVisualContent":2581,"Projects":2605,"Clients":2607,"Countries":2609,"Locations":2611,"Companies":2613,"Tags":2615},40,"The welding and fitting work start at Nyhamna Chinese modules in Stord yard","the-welding-and-fitting-work-start-at-nyhamna-chinese-modules-in-stord-yard","2015-07-20","After the successfully completed modernization work at the Shell Gas Production Plant on the Norwegian island of Aukra, in the middle of this month our groups of welders and fitters have started the modernization work on two out of all seventeen Nyhamna Chinese modules project in KST Stord yard. In the first stage works will concern the two above mentioned modules that have just been delivered to the yard. Another fifteen modules will be transported to Stord in further period of time.","2022-04-16T18:32:04.063Z","2022-04-21T11:54:02.811Z","2022-04-16T18:32:07.513Z",{"id":1998,"name":2582,"alternativeText":2583,"caption":2583,"width":1030,"height":1483,"formats":2584,"hash":2600,"ext":123,"mime":126,"size":2601,"url":2602,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2603,"updatedAt":2604},"SEC personel during moving parts of Nyhamna Chinese modules.jpg","SEC personel during moving parts of Nyhamna Chinese modules",{"small":2585,"medium":2590,"thumbnail":2595},{"ext":123,"url":2586,"hash":2587,"mime":126,"name":2588,"path":10,"size":2589,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-personel-during-moving-parts-of-Nyhamna-Chinese-modules_2022-04-21T11-52-50.jpg","a62e4d4d6b78ee8c538df480f7227aeb","small_SEC personel during moving parts of Nyhamna Chinese modules.jpg",30.71,{"ext":123,"url":2591,"hash":2592,"mime":126,"name":2593,"path":10,"size":2594,"width":42,"height":141},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-personel-during-moving-parts-of-Nyhamna-Chinese-modules_2022-04-21T11-52-50.jpg","79e2b5b4f91e7eda166cef7c7dbddcf9","medium_SEC personel during moving parts of Nyhamna Chinese modules.jpg",58.29,{"ext":123,"url":2596,"hash":2597,"mime":126,"name":2598,"path":10,"size":2599,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-personel-during-moving-parts-of-Nyhamna-Chinese-modules_2022-04-21T11-52-50.jpg","12c3711af6405618d94d7fa4c7962231","thumbnail_SEC personel during moving parts of Nyhamna Chinese modules.jpg",9.45,"9505e6a73e1d61ba3406c4cb04a9e431",272.36,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-personel-during-moving-parts-of-Nyhamna-Chinese-modules_2022-04-21T11-52-50.jpg","2022-04-21T11:52:51.039Z","2022-04-21T11:53:02.806Z",[2606],{"id":680,"Project":1771,"createdAt":1772,"updatedAt":1773,"publishedAt":1774},[2608],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2610],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2612],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2614],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2616,2617,2618],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":2620,"Title":2621,"Slug":2622,"Date":2623,"Story":2624,"Links":10,"createdAt":2625,"updatedAt":2626,"publishedAt":2627,"MainVisualContent":2628,"Projects":2652,"Clients":2658,"Countries":2660,"Locations":2662,"Companies":2664,"Tags":2666},39,"On Monday 6 July, 2015 The Edvard Grieg Topside left Kvaerner’s yard at Stord","on-monday-6-july-2015-the-edvard-grieg-topside-left-kvaerner-s-yard-at-stord","2015-07-07","SEC group together with over 250 engineer specialists have participated in all phases in onshore work on platform. We are proud of our crew, we have a positive impact on the important work for Kvaerner AS, our main Norwegian client. In this spectacular event the Edvard Grieg topside was handed by Thialf the heavy lift vessel, which lifted the 22 000 tonne topside onto the jacket on the Edvard Grieg field in the North Sea. \nThe next step for Edvard Grieg is the offshore phase, which will make up the complete Edvard Grieg topsides. Kvaerner AS is now in the process of mobilizing personnel. A total of 1,200 people in rotation will be involved in the hook-up phase. The Edvard Grieg field is an oil field located in the North Sea, where first production is expected in the fourth quarter of 2015, with a forecast gross peak production of approximately 100,000 barrels of oil equivalent per day.","2022-04-16T18:31:08.239Z","2022-04-21T11:06:24.229Z","2022-04-16T18:31:10.732Z",{"id":2129,"name":2629,"alternativeText":2630,"caption":2630,"width":1030,"height":1483,"formats":2631,"hash":2647,"ext":123,"mime":126,"size":2648,"url":2649,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2650,"updatedAt":2651},"Instalation of the Edvard Grieg Topside on the filed at North Sea.jpg","Instalation of the Edvard Grieg Topside on the filed at North Sea",{"small":2632,"medium":2637,"thumbnail":2642},{"ext":123,"url":2633,"hash":2634,"mime":126,"name":2635,"path":10,"size":2636,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Instalation-of-the-Edvard-Grieg-Topside-on-the-filed-at-North-Sea_2022-04-21T11-03-51.jpg","c5373eb8b2bf48f32afa4311863a10bb","small_Instalation of the Edvard Grieg Topside on the filed at North Sea.jpg",15.91,{"ext":123,"url":2638,"hash":2639,"mime":126,"name":2640,"path":10,"size":2641,"width":42,"height":141},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Instalation-of-the-Edvard-Grieg-Topside-on-the-filed-at-North-Sea_2022-04-21T11-03-51.jpg","58d7b7b2154445a6df387693359386d3","medium_Instalation of the Edvard Grieg Topside on the filed at North Sea.jpg",32.88,{"ext":123,"url":2643,"hash":2644,"mime":126,"name":2645,"path":10,"size":2646,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Instalation-of-the-Edvard-Grieg-Topside-on-the-filed-at-North-Sea_2022-04-21T11-03-50.jpg","67e4dc05d14db4c56d27dad456821bc8","thumbnail_Instalation of the Edvard Grieg Topside on the filed at North Sea.jpg",4.63,"307c1b2bff5b4672b575a1672b0df400",248.96,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FInstalation-of-the-Edvard-Grieg-Topside-on-the-filed-at-North-Sea_2022-04-21T11-03-50.jpg","2022-04-21T11:03:51.161Z","2022-04-21T11:04:09.885Z",[2653],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},"Edvard Grieg","2022-04-19T08:40:11.217Z","2022-04-19T08:40:12.653Z","2022-04-19T08:40:12.650Z",[2659],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2661],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2663],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2665],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2667,2668,2669,2670],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":2672,"Title":2673,"Slug":2674,"Date":2675,"Story":2676,"Links":10,"createdAt":2677,"updatedAt":2678,"publishedAt":2679,"MainVisualContent":2680,"Projects":2703,"Clients":2705,"Countries":2707,"Locations":2709,"Companies":2711,"Tags":2713},38,"Since mid-May 2015, SEC has been participating in the prestigious Nyhamna project at the Shell Gas Production Plant in Norway","since-mid-may-2015-sec-has-been-participating-in-the-prestigious-nyhamna-project-at-the-shell-gas-production-plant-in-norway","2015-05-18","The first group of SEC employees, who will be performing modernisation work on the Shell Gas Production Plant on the Norwegian island of Aukra, were sent in mid-May and include a group of welders and fitters, together with a management team. According to the preliminary negotiations, our crew is scheduled to finish their work by the end of June.\nSEC Norge is one of two subcontractors selected by Kvaerner Stord to have qualified for this prestigious project, in which the object will be shut down.\nOrmen Lange is the third largest gas field in Norway and has the highest number of gas wells in the world. Gas was discovered there in 1997 at depths of 850-1200m, making it a true deepwater project for Norway, and gas production from the field started in 2007. Gas processing is carried out on the island of Aukra, before being transported to Eastington in the UK by Langeled – the longest gas installation in the world.","2022-04-16T18:28:58.185Z","2022-04-21T10:50:33.388Z","2022-04-16T18:28:59.637Z",{"id":2316,"name":2681,"alternativeText":2682,"caption":2682,"width":42,"height":28,"formats":2683,"hash":2699,"ext":1204,"mime":126,"size":2700,"url":2701,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2702,"updatedAt":2702},"Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG","Inspection works on the gas modules of Nyhamna Gas Plant at Aukra",{"small":2684,"medium":2689,"thumbnail":2694},{"ext":1204,"url":2685,"hash":2686,"mime":126,"name":2687,"path":10,"size":2688,"width":183,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Inspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-49.JPG","38206b43e4e1762c4a8d0b979f953f83","small_Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG",57.06,{"ext":1204,"url":2690,"hash":2691,"mime":126,"name":2692,"path":10,"size":2693,"width":129,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Inspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-49.JPG","e09d45d6dd761aa2353a29b6b9ec3ffa","medium_Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG",109.89,{"ext":1204,"url":2695,"hash":2696,"mime":126,"name":2697,"path":10,"size":2698,"width":194,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Inspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-48.JPG","a75bc3da2b7317a053fc5f3980c91ba8","thumbnail_Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG",8.07,"97b7aa8b57b557dbfacbcf00e87f875d",567.22,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FInspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-48.JPG","2022-04-21T10:46:49.449Z",[2704],{"id":680,"Project":1771,"createdAt":1772,"updatedAt":1773,"publishedAt":1774},[2706],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2708],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2710],{"id":360,"Location":1782,"createdAt":1783,"updatedAt":1784,"publishedAt":1785},[2712],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2714,2715,2716,2717,2718,2719,2720],{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":967,"Title":2722,"Slug":2723,"Date":2724,"Story":2725,"Links":10,"createdAt":2726,"updatedAt":2727,"publishedAt":2728,"MainVisualContent":10,"Projects":2729,"Clients":2736,"Countries":2738,"Locations":2740,"Companies":2742,"Tags":2744},"Second stage of SEC group welding inspection works on Moho Nord project","second-stage-of-sec-group-welding-inspection-works-on-moho-nord-project","2015-03-23","Currently our group of inspectors is working for Aker Solutions in Egersund yard. They are participating in Moho Nord project for a final client Total E&P Congo. Our specialists carry out the welding inspection work of pipe constructions designed for underwater part of the oil & gas project. The installation will be located 75 km from the coast of the Republic of Congo.","2022-04-16T18:27:56.497Z","2022-04-21T10:15:29.552Z","2022-04-16T18:27:57.877Z",[2730],{"id":2731,"Project":2732,"createdAt":2733,"updatedAt":2734,"publishedAt":2735},22,"Moho Nord","2022-04-19T08:42:59.229Z","2022-04-19T08:42:59.936Z","2022-04-19T08:42:59.918Z",[2737],{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},[2739],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2741],{"id":353,"Location":1414,"createdAt":1415,"updatedAt":1416,"publishedAt":1417},[2743],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2745,2746,2747,2748,2754],{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},31,"NDT","2022-04-19T08:28:47.063Z","2022-04-19T08:28:47.750Z","2022-04-19T08:28:47.747Z",{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":2756,"Title":2757,"Slug":2758,"Date":2759,"Story":2760,"Links":10,"createdAt":2761,"updatedAt":2762,"publishedAt":2763,"MainVisualContent":2764,"Projects":2787,"Clients":2789,"Countries":2791,"Locations":2793,"Companies":2795,"Tags":2797},36,"Our group of welders and fitters completed the next stage of work on modules of the Nyhamna project in the Kvaerner yard in Stord","our-group-of-welders-and-fitters-completed-the-next-stage-of-work-on-modules-of-the-nyhamna-project-in-the-kvaerner-yard-in-stord","2015-02-20","Since October 2014, our crew have been carrying out welding and fitting works on the Nyhamna project in the Kvaerner yard in Stord. Construction is currently underway on four modules and their outfit in the pipelines, with maintenance, painting and insulation work next in line. In February, the SEC Norge group of welders and fitters finished piping work on three modules, the heaviest of which (over 300 tons) will be floated to the Aukra island in Norway (the giant Ormen Lange gas field) at the beginning of March to be connected to an existing installation. Pipe prefabrication is now being carried out on the largest module with a mass of 522 tons.","2022-04-16T18:27:19.041Z","2022-04-21T10:10:44.418Z","2022-04-16T18:27:21.065Z",{"id":2522,"name":2765,"alternativeText":2766,"caption":2766,"width":1030,"height":1031,"formats":2767,"hash":2783,"ext":1204,"mime":126,"size":2784,"url":2785,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2786,"updatedAt":2786},"Two TIG welders weld big dimension pipe on the piping prefabrication facility.JPG","Two TIG welders weld big dimension pipe on the piping prefabrication facility",{"small":2768,"medium":2773,"thumbnail":2778},{"ext":1204,"url":2769,"hash":2770,"mime":126,"name":2771,"path":10,"size":2772,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Two-TIG-welders-weld-big-dimension-pipe-on-the-piping-prefabrication-facility_2022-04-21T10-07-57.JPG","c965c69728869875985e291990fd26f4","small_Two TIG welders weld big dimension pipe on the piping prefabrication facility.JPG",47.2,{"ext":1204,"url":2774,"hash":2775,"mime":126,"name":2776,"path":10,"size":2777,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Two-TIG-welders-weld-big-dimension-pipe-on-the-piping-prefabrication-facility_2022-04-21T10-07-57.JPG","43b45ea30f4473a44baddeef31730279","medium_Two TIG welders weld big dimension pipe on the piping prefabrication facility.JPG",89.8,{"ext":1204,"url":2779,"hash":2780,"mime":126,"name":2781,"path":10,"size":2782,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Two-TIG-welders-weld-big-dimension-pipe-on-the-piping-prefabrication-facility_2022-04-21T10-07-57.JPG","3d8d7d0e0769aa0274e6b616ce056623","thumbnail_Two TIG welders weld big dimension pipe on the piping prefabrication facility.JPG",11.23,"49a685416271634eb470b6c0544910e4",436.23,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FTwo-TIG-welders-weld-big-dimension-pipe-on-the-piping-prefabrication-facility_2022-04-21T10-07-57.JPG","2022-04-21T10:07:57.610Z",[2788],{"id":680,"Project":1771,"createdAt":1772,"updatedAt":1773,"publishedAt":1774},[2790],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2792],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2794],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2796],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2798,2799,2800,2801,2802,2803],{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":2805,"Title":2806,"Slug":2807,"Date":2808,"Story":2809,"Links":10,"createdAt":2810,"updatedAt":2811,"publishedAt":2812,"MainVisualContent":2813,"Projects":2837,"Clients":2843,"Countries":2849,"Locations":2851,"Companies":2857,"Tags":2859},35,"New contract with Skanska S.A. on construction of the Brdowski Bridge in Szczecin","new-contract-with-skanska-s-a-on-construction-of-the-brdowski-bridge-in-szczecin","2015-01-11","Our group of welders, on behalf of the main contractor – Skanska S.A., took part in the construction of the three-span Brdowski Bridge in Szczecin. The 200-metre-long bridge was designed as a steel structure on reinforced concrete latticing to connect the left bank of the River Oder with Ostrow Brdowski. In the long term perspective, the investment will accelerate the development of the shipyard area and help to increase employment in this area. The project schedule assumes that all work will be completed by September 2015.","2022-04-16T18:25:47.623Z","2022-04-21T09:58:16.305Z","2022-04-16T18:25:49.224Z",{"id":2672,"name":2814,"alternativeText":2815,"caption":2815,"width":1030,"height":1483,"formats":2816,"hash":2832,"ext":123,"mime":126,"size":2833,"url":2834,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2835,"updatedAt":2836},"Brdowski Bridge in Szczecin.jpg","Brdowski Bridge in Szczecin",{"small":2817,"medium":2822,"thumbnail":2827},{"ext":123,"url":2818,"hash":2819,"mime":126,"name":2820,"path":10,"size":2821,"width":35,"height":135},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Brdowski-Bridge-in-Szczecin_2022-04-21T09-57-38.jpg","1f651331ac05568734e2bc93f5175458","small_Brdowski Bridge in Szczecin.jpg",38.03,{"ext":123,"url":2823,"hash":2824,"mime":126,"name":2825,"path":10,"size":2826,"width":42,"height":141},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Brdowski-Bridge-in-Szczecin_2022-04-21T09-57-38.jpg","f50dc9969b3d147a7aaee3ff760786f0","medium_Brdowski Bridge in Szczecin.jpg",78.93,{"ext":123,"url":2828,"hash":2829,"mime":126,"name":2830,"path":10,"size":2831,"width":240,"height":241},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Brdowski-Bridge-in-Szczecin_2022-04-21T09-57-38.jpg","6a61a253702ef82edd8abd55d10b3bc7","thumbnail_Brdowski Bridge in Szczecin.jpg",10.32,"0ac5230b81fdffb88a0a402759a10f85",272.99,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FBrdowski-Bridge-in-Szczecin_2022-04-21T09-57-38.jpg","2022-04-21T09:57:38.723Z","2022-04-21T09:57:47.717Z",[2838],{"id":577,"Project":2839,"createdAt":2840,"updatedAt":2841,"publishedAt":2842},"Brdowski Bridge","2022-04-19T08:40:03.186Z","2022-04-19T08:40:04.010Z","2022-04-19T08:40:04.007Z",[2844],{"id":984,"Client":2845,"createdAt":2846,"updatedAt":2847,"publishedAt":2848},"Skanska","2022-04-19T09:58:45.600Z","2022-04-19T09:58:46.161Z","2022-04-19T09:58:46.152Z",[2850],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[2852],{"id":1554,"Location":2853,"createdAt":2854,"updatedAt":2855,"publishedAt":2856},"Szczecin","2022-04-19T10:03:23.602Z","2022-04-19T10:03:24.133Z","2022-04-19T10:03:24.130Z",[2858],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[2860,2861,2862],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":633,"Title":2864,"Slug":2865,"Date":2866,"Story":2867,"Links":10,"createdAt":2868,"updatedAt":2869,"publishedAt":2870,"MainVisualContent":2871,"Projects":2887,"Clients":2888,"Countries":2890,"Locations":2892,"Companies":2894,"Tags":2896},"SEC Group builds common HSSE values with Kvaerner AS","sec-group-builds-common-hsse-values-with-kvaerner-as","2014-11-02","We would like to thank our partner Kvaerner AS for inviting us to the next edition Kvaerner HSSE SUMMIT 2014 under the slogan \"Improvements Together\" organized on 29-30.10.2014 in Stord in Norway.\nRepresentatives of the SEC have the honor to be among more than 100 delegates, business partners, subcontractors and suppliers of Kvaerner AS. This summit created the opportunity to participate in direct dialogue on building security, trust, health care of employees and continuous improvement of the working environment conditions.","2022-04-16T18:25:04.970Z","2022-04-20T11:52:24.812Z","2022-04-16T18:25:06.143Z",{"id":967,"name":2872,"alternativeText":2873,"caption":2873,"width":2874,"height":2875,"formats":2876,"hash":2883,"ext":21,"mime":24,"size":2884,"url":2885,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2886,"updatedAt":2886},"HSSE 2014 Kvaerner Summit.png","HSSE 2014 Kvaerner Summit",463,220,{"thumbnail":2877},{"ext":21,"url":2878,"hash":2879,"mime":24,"name":2880,"path":10,"size":2881,"width":240,"height":2882},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_HSSE-2014-Kvaerner-Summit_2022-04-20T11-51-28.png","c0f5fe8d0d58268ae4398f6171b7ea14","thumbnail_HSSE 2014 Kvaerner Summit.png",39.84,116,"f1c2beefd374d45f97ca5f55dc9bea2b",91.16,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FHSSE-2014-Kvaerner-Summit_2022-04-20T11-51-28.png","2022-04-20T11:51:28.474Z",[],[2889],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2891],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2893],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2895],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2897,2898,2899],{"id":577,"Tag":1424,"createdAt":1425,"updatedAt":1426,"publishedAt":1427},{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":648,"Tag":973,"createdAt":974,"updatedAt":975,"publishedAt":976},{"id":2901,"Title":2902,"Slug":2903,"Date":2904,"Story":2905,"Links":10,"createdAt":2906,"updatedAt":2907,"publishedAt":2908,"MainVisualContent":2909,"Projects":2932,"Clients":2934,"Countries":2936,"Locations":2938,"Companies":2940,"Tags":2942},33,"October 2014 Edvard Grieg entered into the Mechanical Completion phase","october-2014-edvard-grieg-entered-into-the-mechanical-completion-phase","2014-10-20","In mid-October 2014, topside Edvard Grieg platform entered into the mechanical completion phase. Our team of experienced engineers is currently preparing an object inventory which, after testing has been completed and technical acceptance granted, will be prepared for loading onto the barge. The platform structure is scheduled to sail from Kvaerner yard in Stord at the end of April.","2022-04-16T18:23:46.752Z","2022-04-20T11:50:30.958Z","2022-04-16T18:23:48.044Z",{"id":633,"name":2910,"alternativeText":2911,"caption":2911,"width":1030,"height":1031,"formats":2912,"hash":2928,"ext":123,"mime":126,"size":2929,"url":2930,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2931,"updatedAt":2931},"Edvard Grieg entered into the Mechanical Completion phase.jpg","Edvard Grieg entered into the Mechanical Completion phase",{"small":2913,"medium":2918,"thumbnail":2923},{"ext":123,"url":2914,"hash":2915,"mime":126,"name":2916,"path":10,"size":2917,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Edvard-Grieg-entered-into-the-Mechanical-Completion-phase_2022-04-20T11-49-55.jpg","e72b07b787529ce8d1931ca748a3329d","small_Edvard Grieg entered into the Mechanical Completion phase.jpg",31.76,{"ext":123,"url":2919,"hash":2920,"mime":126,"name":2921,"path":10,"size":2922,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Edvard-Grieg-entered-into-the-Mechanical-Completion-phase_2022-04-20T11-49-55.jpg","b39e295b9627569b40a2e56257dd6473","medium_Edvard Grieg entered into the Mechanical Completion phase.jpg",63.42,{"ext":123,"url":2924,"hash":2925,"mime":126,"name":2926,"path":10,"size":2927,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Edvard-Grieg-entered-into-the-Mechanical-Completion-phase_2022-04-20T11-49-55.jpg","dea1a4de3e56c0c35d41029a96690876","thumbnail_Edvard Grieg entered into the Mechanical Completion phase.jpg",7.19,"43cde5df58fcd54d6b7cfeb0d83db8fa",356.19,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FEdvard-Grieg-entered-into-the-Mechanical-Completion-phase_2022-04-20T11-49-54.jpg","2022-04-20T11:49:55.472Z",[2933],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[2935],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[2937],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[2939],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[2941],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[2943,2944,2945],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":939,"Title":2947,"Slug":2948,"Date":2949,"Story":2950,"Links":10,"createdAt":2951,"updatedAt":2952,"publishedAt":2953,"MainVisualContent":2954,"Projects":2981,"Clients":2982,"Countries":2983,"Locations":2985,"Companies":2991,"Tags":2993},"56th Scientific-Technical Conference on Welding: WELDING - ALWAYS BE MORE and the International Welding Fair ExpoWELDING in Sosnowiec, Silesia","56th-scientific-technical-conference-on-welding-welding-always-be-more-and-the-international-welding-fair-expo-welding-in-sosnowiec-silesia","2014-10-17","On the 15th of October 2014, during the 56th Conference of the International Fair of Welding and Welding ExpoWELDING in Sosnowiec, our main welding inspector participated in sessions of many scientific lectures concerning a wide range of welding and joining processes. The conference was attended by scientists from many abroad centers and leading institutions (Lisbon, Bremen, Stockholm, Sweden, Trollhättan, Wels, Magdeburg, Kiev, Sofia) and also Polish ones (Gdańsk, Szczecin, Warsaw, Wrocław, Gliwice, Poland and others). The topics of lectures included various air and under water weldability problems, modification of the surface layer, the design of welded structures, the use of high welding methods, numerical modeling and welding of living tissues.\nOur welding inspector is the co-author of the article which was presented at the conference on \"Problems of underwater welding of high-strength steels.\" Also he participated in the second edition of the Conference on Safe operation of the welder. Various problems were discussed, among others selection of personal protective equipment, exposure to light radiation, welder’s equipment, exemplary irregularities and accidents at work.\nThe knowledge gained on the conference is a precious value that allows to upgrade the competence of welding supervision personnel in SEC company. It concerns the scope of both welding processes and safety increase.","2022-04-16T18:22:35.984Z","2022-04-20T11:43:46.779Z","2022-04-16T18:22:37.820Z",{"id":913,"name":2955,"alternativeText":2956,"caption":2956,"width":1030,"height":2957,"formats":2958,"hash":2977,"ext":1204,"mime":126,"size":2978,"url":2979,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":2980,"updatedAt":2980},"Mr Grzegorz Rogalski on the Scientific Technical Conference on Welding 2014.JPG","Mr Grzegorz Rogalski on the Scientific Technical Conference on Welding 2014",464,{"small":2959,"medium":2965,"thumbnail":2971},{"ext":1204,"url":2960,"hash":2961,"mime":126,"name":2962,"path":10,"size":2963,"width":35,"height":2964},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Mr-Grzegorz-Rogalski-on-the-Scientific-Technical-Conference-on-Welding-2014_2022-04-20T11-36-24.JPG","546afbb9b5dfb0697cf363754aea8e32","small_Mr Grzegorz Rogalski on the Scientific Technical Conference on Welding 2014.JPG",32.03,290,{"ext":1204,"url":2966,"hash":2967,"mime":126,"name":2968,"path":10,"size":2969,"width":42,"height":2970},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Mr-Grzegorz-Rogalski-on-the-Scientific-Technical-Conference-on-Welding-2014_2022-04-20T11-36-24.JPG","d302a0854b8b4dec27586c5f575b26e9","medium_Mr Grzegorz Rogalski on the Scientific Technical Conference on Welding 2014.JPG",58.98,435,{"ext":1204,"url":2972,"hash":2973,"mime":126,"name":2974,"path":10,"size":2975,"width":240,"height":2976},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Mr-Grzegorz-Rogalski-on-the-Scientific-Technical-Conference-on-Welding-2014_2022-04-20T11-36-24.JPG","b437fe07c4c196a3a9ac4afa850eb61b","thumbnail_Mr Grzegorz Rogalski on the Scientific Technical Conference on Welding 2014.JPG",9.96,142,"dab1c349a2fcac238c5052dd31e1b05c",272.24,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FMr-Grzegorz-Rogalski-on-the-Scientific-Technical-Conference-on-Welding-2014_2022-04-20T11-36-24.JPG","2022-04-20T11:36:24.594Z",[],[],[2984],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[2986],{"id":669,"Location":2987,"createdAt":2988,"updatedAt":2989,"publishedAt":2990},"Sosnowiec","2022-04-19T10:03:03.924Z","2022-04-19T10:03:04.606Z","2022-04-19T10:03:04.603Z",[2992],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[2994,2995,2996,2997,2998,2999,3004],{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":577,"Tag":1424,"createdAt":1425,"updatedAt":1426,"publishedAt":1427},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":2731,"Tag":3000,"createdAt":3001,"updatedAt":3002,"publishedAt":3003},"Science","2022-04-19T08:25:36.188Z","2022-04-19T08:25:37.347Z","2022-04-19T08:25:37.345Z",{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":1885,"Title":3006,"Slug":3007,"Date":3008,"Story":3009,"Links":10,"createdAt":3010,"updatedAt":3011,"publishedAt":3012,"MainVisualContent":3013,"Projects":3036,"Clients":3042,"Countries":3048,"Locations":3050,"Companies":3056,"Tags":3058},"The operation of loading new elements of construction Moho Subsea Project, Energomontaż","the-operation-of-loading-new-elements-of-construction-moho-subsea-project-energomontaz","2014-08-31","Within the agreed production schedule on Moho Subsea Project, on the date 29-08-2014 the loading of frames NL 1001, NL 1002, NL 1003 has been successfully completed.","2022-04-19T06:36:55.071Z","2022-04-20T11:15:35.280Z","2022-04-19T06:36:56.332Z",{"id":950,"name":3014,"alternativeText":3015,"caption":3015,"width":1030,"height":1031,"formats":3016,"hash":3032,"ext":1034,"mime":24,"size":3033,"url":3034,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":3035,"updatedAt":3035},"The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project_03.PNG","The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project_03",{"small":3017,"medium":3022,"thumbnail":3027},{"ext":1034,"url":3018,"hash":3019,"mime":24,"name":3020,"path":10,"size":3021,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_The-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_03_2022-04-20T11-04-39.PNG","b60230d5f03c9283bc8ce8571f5d26b7","small_The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project_03.PNG",40.34,{"ext":1034,"url":3023,"hash":3024,"mime":24,"name":3025,"path":10,"size":3026,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_The-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_03_2022-04-20T11-04-39.PNG","39e6342088fdc7c60cef76b687a55cf8","medium_The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project_03.PNG",73.64,{"ext":1034,"url":3028,"hash":3029,"mime":24,"name":3030,"path":10,"size":3031,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_The-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_03_2022-04-20T11-04-39.PNG","a3dcb38a8f2a332562f02cdbbd1b47f8","thumbnail_The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project_03.PNG",9.68,"50a7280845022bdb7045a72c3f089504",341.32,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FThe-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_03_2022-04-20T11-04-38.PNG","2022-04-20T11:04:39.729Z",[3037],{"id":1008,"Project":3038,"createdAt":3039,"updatedAt":3040,"publishedAt":3041},"Moho Subsea","2022-04-19T08:43:06.111Z","2022-04-19T08:43:06.798Z","2022-04-19T08:43:06.795Z",[3043],{"id":577,"Client":3044,"createdAt":3045,"updatedAt":3046,"publishedAt":3047},"Energomontaż-Północ Gdynia","2022-04-19T09:57:46.719Z","2022-04-19T09:57:47.472Z","2022-04-19T09:57:47.469Z",[3049],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3051],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},"Gdynia","2022-04-19T10:01:26.831Z","2022-04-19T10:01:27.672Z","2022-04-19T10:01:27.669Z",[3057],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3059,3060,3061,3062],{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":2749,"Title":3064,"Slug":3065,"Date":3066,"Story":3067,"Links":10,"createdAt":3068,"updatedAt":3069,"publishedAt":3070,"MainVisualContent":3071,"Projects":3093,"Clients":3096,"Countries":3098,"Locations":3100,"Companies":3102,"Tags":3104},"The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project","the-inspections-works-on-subsea-moho-project-and-subsea-aasta-hansteen-project","2014-08-20","At the end of September 2014 SEC inspectors complete the first part of the supervision works on Moho Subsea Project and Subsea Aasta Hansteen Project . Within our frame agreement our engineering staff supervises the implementation of the elements: constructions NL1001, NL1002, NL1003, NL1004, BL41, BL12, BLGLM, structures Anchor Top’ow BA12, BAGLM, BASDU, NAKKF2, NAFPU – Total weight of constructions is 900 tons. Constructions Anchor Top’ow HA, LU, SN - Total weight of elements is 300 tons. The inspection works for our Norwegian customer Aker Egersund take place in EPG Gdynia.","2022-04-16T18:21:07.390Z","2022-04-20T11:10:32.074Z","2022-04-16T18:21:08.676Z",{"id":680,"name":3072,"alternativeText":3064,"caption":3064,"width":1030,"height":1031,"formats":3073,"hash":3089,"ext":1034,"mime":24,"size":3090,"url":3091,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":3092,"updatedAt":3092},"The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project.PNG",{"small":3074,"medium":3079,"thumbnail":3084},{"ext":1034,"url":3075,"hash":3076,"mime":24,"name":3077,"path":10,"size":3078,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_The-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_2022-04-20T11-03-26.PNG","9b2dbfb8f7b8deb3944fc500f91c3f83","small_The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project.PNG",37.41,{"ext":1034,"url":3080,"hash":3081,"mime":24,"name":3082,"path":10,"size":3083,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_The-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_2022-04-20T11-03-26.PNG","59af6c2cffbcd966224bdc4a844547ba","medium_The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project.PNG",67.06,{"ext":1034,"url":3085,"hash":3086,"mime":24,"name":3087,"path":10,"size":3088,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_The-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_2022-04-20T11-03-25.PNG","5cca31dd335a1eea49e422fc7ba9a675","thumbnail_The inspections works on Subsea MOHO Project and Subsea Aasta Hansteen Project.PNG",9.43,"41644dee7cce8dd32c3b632a3d2bfcb2",316.11,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FThe-inspections-works-on-Subsea-MOHO-Project-and-Subsea-Aasta-Hansteen-Project_2022-04-20T11-03-25.PNG","2022-04-20T11:03:26.244Z",[3094,3095],{"id":559,"Project":1979,"createdAt":1980,"updatedAt":1981,"publishedAt":1982},{"id":1008,"Project":3038,"createdAt":3039,"updatedAt":3040,"publishedAt":3041},[3097],{"id":577,"Client":3044,"createdAt":3045,"updatedAt":3046,"publishedAt":3047},[3099],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3101],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3103],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3105,3106,3107,3108,3109,3110],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":913,"Title":3112,"Slug":3113,"Date":3114,"Story":3115,"Links":10,"createdAt":3116,"updatedAt":3117,"publishedAt":3118,"MainVisualContent":3119,"Projects":3144,"Clients":3150,"Countries":3152,"Locations":3154,"Companies":3156,"Tags":3158},"Repair works on the Platform TRANSOCEAN BARENTS","repair-works-on-the-platform-transocean-barents","2014-07-14","Currently on the Transocean BARENTS drilling rig last modification and upgrading works at Kværner Stord yard. The Platform is designed to work in harsh environmental conditions and water depths of 3,000 meters. The time taken to carry out all the required repair works has been contracted for 60 days. Welding and fitting works on the object are implemented by more than 60 of our employees and include both steel structures and piping installations. In addition Kvaerner Stord, appreciating the quality of our services and experience of SEC Norge staff, hired in one of our valued Shift Leaders who supports the coordination of repair work on the object.","2022-04-16T18:16:45.190Z","2022-04-20T10:51:31.863Z","2022-04-16T18:16:46.762Z",{"id":2731,"name":3120,"alternativeText":3121,"caption":3121,"width":1030,"height":3122,"formats":3123,"hash":3140,"ext":21,"mime":24,"size":3141,"url":3142,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":3143,"updatedAt":3143},"SEC formen and HSE team under the Transocean Barents at Stord.png","SEC formen and HSE team under the Transocean Barents at Stord",525,{"small":3124,"medium":3129,"thumbnail":3135},{"ext":21,"url":3125,"hash":3126,"mime":24,"name":3127,"path":10,"size":3128,"width":35,"height":2153},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-formen-and-HSE-team-under-the-Transocean-Barents-at-Stord_2022-04-20T10-49-45.png","aa6d2f89f566b262e2e2df12a4543513","small_SEC formen and HSE team under the Transocean Barents at Stord.png",371.9,{"ext":21,"url":3130,"hash":3131,"mime":24,"name":3132,"path":10,"size":3133,"width":42,"height":3134},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-formen-and-HSE-team-under-the-Transocean-Barents-at-Stord_2022-04-20T10-49-45.png","cd3999e100ab52722fe0a720d1e3ae90","medium_SEC formen and HSE team under the Transocean Barents at Stord.png",792.15,492,{"ext":21,"url":3136,"hash":3137,"mime":24,"name":3138,"path":10,"size":3139,"width":15,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-formen-and-HSE-team-under-the-Transocean-Barents-at-Stord_2022-04-20T10-49-45.png","9202fb7c0022fa6bf0dbeb3036a626b8","thumbnail_SEC formen and HSE team under the Transocean Barents at Stord.png",90.11,"2d07114e05cf4d655669baf792208cc9",561.25,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-formen-and-HSE-team-under-the-Transocean-Barents-at-Stord_2022-04-20T10-49-44.png","2022-04-20T10:49:45.880Z",[3145],{"id":950,"Project":3146,"createdAt":3147,"updatedAt":3148,"publishedAt":3149},"Transocean Barents","2022-04-19T08:43:41.165Z","2022-04-19T08:43:41.745Z","2022-04-19T08:43:41.742Z",[3151],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3153],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3155],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3157],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3159,3160,3161,3162,3163,3164],{"id":990,"Tag":991,"createdAt":992,"updatedAt":993,"publishedAt":994},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":984,"Tag":985,"createdAt":986,"updatedAt":987,"publishedAt":988},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":627,"Title":3166,"Slug":3167,"Date":3168,"Story":3169,"Links":10,"createdAt":3170,"updatedAt":3171,"publishedAt":3172,"MainVisualContent":10,"Projects":3173,"Clients":3175,"Countries":3187,"Locations":3189,"Companies":3196,"Tags":3198},"Starting Nyhamna Project. May 2014","starting-nyhamna-project-may-2014","2014-05-26","In May 2014 Kvaerner Stord AS launched the execution of Nyhamna Project, the largest onshore contract signed in Norway in 2012, with a value of 11 billion NOK in the context of the Framework Agreement between A\u002FS Norske Shell and Kvaerner. The project is expected to last six years with the possibility of prolongation for another two years. Within the contract signed with the company Kvaerner Stord AS our engineering personnel started inspection works in the field of welding, dimensional control and technical documentation. The construction works of Nyhamna Project are implemented at Mostostal Pomorze and Energop Sochaczew in Poland.","2022-04-16T18:15:38.537Z","2022-04-20T10:35:02.828Z","2022-04-16T18:15:39.912Z",[3174],{"id":680,"Project":1771,"createdAt":1772,"updatedAt":1773,"publishedAt":1774},[3176,3177,3182],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},{"id":663,"Client":3178,"createdAt":3179,"updatedAt":3180,"publishedAt":3181},"Mostostal Pomorze","2022-04-19T09:58:32.291Z","2022-04-19T09:58:32.947Z","2022-04-19T09:58:32.944Z",{"id":566,"Client":3183,"createdAt":3184,"updatedAt":3185,"publishedAt":3186},"Energop Sochaczew","2022-04-19T09:57:55.648Z","2022-04-19T09:57:56.230Z","2022-04-19T09:57:56.227Z",[3188],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3190,3195],{"id":984,"Location":3191,"createdAt":3192,"updatedAt":3193,"publishedAt":3194},"Sochaczew","2022-04-19T10:02:55.803Z","2022-04-19T10:02:56.581Z","2022-04-19T10:02:56.578Z",{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[3197],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3199,3200,3201,3202,3203,3204,3205,3206],{"id":1008,"Tag":1009,"createdAt":1010,"updatedAt":1011,"publishedAt":1012},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":939,"Tag":940,"createdAt":941,"updatedAt":942,"publishedAt":943},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":950,"Title":3208,"Slug":3209,"Date":3210,"Story":3211,"Links":10,"createdAt":3212,"updatedAt":3213,"publishedAt":3214,"MainVisualContent":10,"Projects":3215,"Clients":3226,"Countries":3228,"Locations":3230,"Companies":3232,"Tags":3234},"Eldfisk 2\u002F7 S Topside leaves Stord yard on 16th of May 2014, Norway","eldfisk-2-7-s-topside-leaves-stord-yard-on-16th-of-may-2014-norway","2014-05-16","Within the contract signed by two major companies Kvaerner Stord AS and ConocoPhillips in March 2011, Topside of Eldfisk 2\u002F7 S Platform sailed away from Stord shipyard in May this year. The ceremony held on this occasion was attended, among others, by the President and CEO of Kvaerner in one person Mr. Jan Arve Haugan. After leaving Stord Topside of the platform will be lifted onto the part called steel substructure jacket by raising it with two separate lifts. The whole operation has been already planned in details by an international team of Kvaerner. It is worth reminding that Eldfisk is a part of a larger oil and gas field known as Greater Ekofisk Area located in the North Sea about 300 kilometers from the coast of Norway. Production was launched there in 1979.","2022-04-16T18:13:02.421Z","2022-04-20T10:24:22.169Z","2022-04-16T18:13:04.181Z",[3216,3221],{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},"Eldfisk","2022-04-19T08:40:54.508Z","2022-04-19T08:40:55.638Z","2022-04-19T08:40:55.635Z",{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},"Eldfisk 2\u002F7S","2022-04-19T08:41:01.840Z","2022-04-19T08:41:02.557Z","2022-04-19T08:41:02.554Z",[3227],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3229],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3231],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3233],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3235],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":2369,"Title":3237,"Slug":3238,"Date":3239,"Story":3240,"Links":10,"createdAt":3241,"updatedAt":3242,"publishedAt":3243,"MainVisualContent":3244,"Projects":3269,"Clients":3271,"Countries":3273,"Locations":3275,"Companies":3277,"Tags":3279},"Edvard Grieg – piping installation and prefabrication May 2014","edvard-grieg-piping-installation-and-prefabrication-may-2014","2014-05-15","In accordance with the agreed production schedule of our client Kvaerner Stord AS, our company SEC Norge AS started works on piping installation of Edvard Grieg Project. In mid-May first crews of welders and fitters went to Stord, Norway. They will work under the watchful eye of experienced supervisors and leaders. Also this month we extended the specialized groups on piping prefabrication of process-drilling platform Edvard Grieg.","2022-04-16T18:11:03.183Z","2022-04-20T10:22:14.205Z","2022-04-16T18:11:04.594Z",{"id":1065,"name":3245,"alternativeText":3246,"caption":3246,"width":1030,"height":1389,"formats":3247,"hash":3265,"ext":1034,"mime":24,"size":3266,"url":3267,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":3268,"updatedAt":3268},"SEC HSE and piping specialists consulting tasks before starting the assembling works.PNG","SEC HSE and piping specialists consulting tasks before starting the assembling works",{"small":3248,"medium":3254,"thumbnail":3260},{"ext":1034,"url":3249,"hash":3250,"mime":24,"name":3251,"path":10,"size":3252,"width":35,"height":3253},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-HSE-and-piping-specialists-consulting-tasks-before-starting-the-assembling-works_2022-04-20T10-20-40.PNG","bc9ed2befa96df00a136514978d6100b","small_SEC HSE and piping specialists consulting tasks before starting the assembling works.PNG",495.05,374,{"ext":1034,"url":3255,"hash":3256,"mime":24,"name":3257,"path":10,"size":3258,"width":42,"height":3259},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-HSE-and-piping-specialists-consulting-tasks-before-starting-the-assembling-works_2022-04-20T10-20-40.PNG","8ebfc1a0498fd8fe18b7006592b73388","medium_SEC HSE and piping specialists consulting tasks before starting the assembling works.PNG",1056.76,562,{"ext":1034,"url":3261,"hash":3262,"mime":24,"name":3263,"path":10,"size":3264,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-HSE-and-piping-specialists-consulting-tasks-before-starting-the-assembling-works_2022-04-20T10-20-40.PNG","ca9a508c2cffa8c87b53a9ce3e6f0fca","thumbnail_SEC HSE and piping specialists consulting tasks before starting the assembling works.PNG",91.35,"6010e796ccd2fdc8878d2928a9dbdc50",680.93,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-HSE-and-piping-specialists-consulting-tasks-before-starting-the-assembling-works_2022-04-20T10-20-39.PNG","2022-04-20T10:20:40.999Z",[3270],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3272],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3274],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3276],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3278],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3280,3281,3282,3283,3284,3285],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":680,"Title":3287,"Slug":3288,"Date":3289,"Story":3290,"Links":10,"createdAt":3291,"updatedAt":3292,"publishedAt":3293,"MainVisualContent":10,"Projects":3294,"Clients":3296,"Countries":3299,"Locations":3301,"Companies":3303,"Tags":3305},"Flare Tower for Platform Edvard Grieg","flare-tower-for-platform-edvard-grieg","2014-04-15","Within our frame agreement with our main client, Norwegian company Kvaerner Stord AS in April 2014, our qualified staff began engineering, welding inspections, dimension control and supervision of the technical documentation during manufacturing of flare tower of Edvard Grieg platform. Construction work of a flare tower is under construction in Mostostal Pomorze in Gdańsk.","2022-04-16T18:09:59.532Z","2022-04-20T10:10:07.915Z","2022-04-16T18:10:02.169Z",[3295],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3297,3298],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},{"id":663,"Client":3178,"createdAt":3179,"updatedAt":3180,"publishedAt":3181},[3300],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3302],{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[3304],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3306,3307,3308,3309,3310,3311,3312],{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":939,"Tag":940,"createdAt":941,"updatedAt":942,"publishedAt":943},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":657,"Title":3314,"Slug":3315,"Date":3316,"Story":3317,"Links":10,"createdAt":3318,"updatedAt":3319,"publishedAt":3320,"MainVisualContent":10,"Projects":3321,"Clients":3323,"Countries":3325,"Locations":3327,"Companies":3329,"Tags":3331},"Edvard Grieg in Kvaerner Stord AS, Norway","edvard-grieg-in-kvaerner-stord-as-norway","2014-01-09","In January 2014, our crews of welders and fitters started work on the construction of modules: manufacturing (C00) and utility (U00) of Edvard Grieg platform, which shall be placed in the North Sea. Process-drilling platform Edvard Grieg shall be set on the oil field of the same name. First production is scheduled for October 2015. The works take place at the manufacturing plant of Kvaerner Stord AS, our Norwegian customer.","2022-04-16T18:07:07.383Z","2022-04-20T10:07:54.801Z","2022-04-16T18:07:08.740Z",[3322],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3324],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3326],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3328],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3330],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3332,3333,3334],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":990,"Title":3336,"Slug":3337,"Date":3338,"Story":3339,"Links":10,"createdAt":3340,"updatedAt":3341,"publishedAt":3342,"MainVisualContent":3343,"Projects":3371,"Clients":3374,"Countries":3376,"Locations":3378,"Companies":3380,"Tags":3382},"Eldfisk 2\u002F7S Platform in Kvaerner Stord AS. The final stage of work","eldfisk-2-7-s-platform-in-kvaerner-stord-as-the-final-stage-of-work","2013-12-22","In ongoing month we finished our activity on the construction of Eldfisk 2\u002F7 S platform. The majority of work has been done on two following modules: utility and production. At the moment the platform is being prepared to sail to the North Sea for sea trials.","2022-04-16T18:05:43.387Z","2022-04-20T09:57:20.574Z","2022-04-18T19:10:38.268Z",{"id":1554,"name":3344,"alternativeText":3345,"caption":3345,"width":1030,"height":1688,"formats":3346,"hash":3367,"ext":21,"mime":24,"size":3368,"url":3369,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":3370,"updatedAt":3370},"SEC personnel under the Eldfisk 2 7 S LQ module with helideck on the Stord yard.png","SEC personnel under the Eldfisk 2 7 S LQ module with helideck on the Stord yard",{"large":3347,"small":3352,"medium":3357,"thumbnail":3362},{"ext":21,"url":3348,"hash":3349,"mime":24,"name":3350,"path":10,"size":3351,"width":42,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_SEC-personnel-under-the-Eldfisk-2-7-S-LQ-module-with-helideck-on-the-Stord-yard_2022-04-20T09-56-45.png","b363415f7a1936f10563e930a8b7aa8b","large_SEC personnel under the Eldfisk 2 7 S LQ module with helideck on the Stord yard.png",1587.02,{"ext":21,"url":3353,"hash":3354,"mime":24,"name":3355,"path":10,"size":3356,"width":183,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-personnel-under-the-Eldfisk-2-7-S-LQ-module-with-helideck-on-the-Stord-yard_2022-04-20T09-56-45.png","d1ae66707739e41c08547d00823a6353","small_SEC personnel under the Eldfisk 2 7 S LQ module with helideck on the Stord yard.png",429.98,{"ext":21,"url":3358,"hash":3359,"mime":24,"name":3360,"path":10,"size":3361,"width":129,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-personnel-under-the-Eldfisk-2-7-S-LQ-module-with-helideck-on-the-Stord-yard_2022-04-20T09-56-45.png","10ffba97ad8013e151a589f3d660ef21","medium_SEC personnel under the Eldfisk 2 7 S LQ module with helideck on the Stord yard.png",926.26,{"ext":21,"url":3363,"hash":3364,"mime":24,"name":3365,"path":10,"size":3366,"width":194,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-personnel-under-the-Eldfisk-2-7-S-LQ-module-with-helideck-on-the-Stord-yard_2022-04-20T09-56-44.png","600604c010f878da9188f4a716c44268","thumbnail_SEC personnel under the Eldfisk 2 7 S LQ module with helideck on the Stord yard.png",47.08,"69d6ed916752fbd5b59ed1a8b403e468",1203.84,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-personnel-under-the-Eldfisk-2-7-S-LQ-module-with-helideck-on-the-Stord-yard_2022-04-20T09-56-43.png","2022-04-20T09:56:45.957Z",[3372,3373],{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},[3375],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3377],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3379],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3381],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3383,3384,3385,3386],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":1008,"Title":3388,"Slug":3389,"Date":3390,"Story":3391,"Links":10,"createdAt":3392,"updatedAt":3393,"publishedAt":3394,"MainVisualContent":3395,"Projects":3422,"Clients":3423,"Countries":3424,"Locations":3426,"Companies":3428,"Tags":3430},"SEC Pomorze awarded with a prize by National Labour Inspectorate!","sec-pomorze-awarded-with-a-prize-by-national-labour-inspectorate","2013-11-20","We are pleased to announce that SEC Pomorze company has been awarded in the competition organised by National Labour Inspectorate. Ceremony of handing in the statues \"Employer- Organiser of safe work\" was held on 20th November 2013 in Dwór Artusa in Gdańsk. Mr. Piotr Piłat collected the award in the category of employers having between 51- 250 workers. It was 20th, jubilee edition of plebiscite which aim is to promote the activities improving the safety at work and favour employers who eliminate potential risks.","2022-04-16T18:03:41.104Z","2022-04-20T09:41:56.725Z","2022-04-16T18:03:43.132Z",{"id":669,"name":3396,"alternativeText":3397,"caption":3397,"width":1030,"height":3398,"formats":3399,"hash":3418,"ext":123,"mime":126,"size":3419,"url":3420,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":3421,"updatedAt":3421},"Mr Piotr Piłat collects the award of Organizer of safe work.jpg","Mr Piotr Piłat collects the award of Organizer of safe work",481,{"small":3400,"medium":3406,"thumbnail":3412},{"ext":123,"url":3401,"hash":3402,"mime":126,"name":3403,"path":10,"size":3404,"width":35,"height":3405},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Mr-Piotr-Pi%C5%82at-collects-the-award-of-Organizer-of-safe-work_2022-04-20T09-40-07.jpg","9f0908d8b1d0fa40c4e69d355eb46b0e","small_Mr Piotr Piłat collects the award of Organizer of safe work.jpg",26.66,301,{"ext":123,"url":3407,"hash":3408,"mime":126,"name":3409,"path":10,"size":3410,"width":42,"height":3411},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Mr-Piotr-Pi%C5%82at-collects-the-award-of-Organizer-of-safe-work_2022-04-20T09-40-07.jpg","cd097e0bf77a4bc378d15e2035c55a98","medium_Mr Piotr Piłat collects the award of Organizer of safe work.jpg",47.7,451,{"ext":123,"url":3413,"hash":3414,"mime":126,"name":3415,"path":10,"size":3416,"width":240,"height":3417},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Mr-Piotr-Pi%C5%82at-collects-the-award-of-Organizer-of-safe-work_2022-04-20T09-40-07.jpg","06010b6dfcfe6ff2ec7c9fbbc0228e91","thumbnail_Mr Piotr Piłat collects the award of Organizer of safe work.jpg",9.37,147,"f7db174b3faa73dd97f2e4c705dde16f",233.62,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FMr-Piotr-Pi%C5%82at-collects-the-award-of-Organizer-of-safe-work_2022-04-20T09-40-07.jpg","2022-04-20T09:40:08.070Z",[],[],[3425],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3427],{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},[3429],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3431,3432],{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":2369,"Tag":3433,"createdAt":3434,"updatedAt":3435,"publishedAt":3436},"Awards","2022-04-19T08:27:50.793Z","2022-04-19T08:27:51.618Z","2022-04-19T08:27:51.616Z",{"id":2731,"Title":3438,"Slug":3439,"Date":3440,"Story":3441,"Links":10,"createdAt":3442,"updatedAt":3443,"publishedAt":3444,"MainVisualContent":3445,"Projects":3468,"Clients":3474,"Countries":3476,"Locations":3478,"Companies":3480,"Tags":3482},"Lifting of Goliath Gantry Crane succeded","lifting-of-goliath-gantry-crane-succeded","2013-11-06","At the beginning of November lifting operation of Goliath Gantry Crane in Kværner Stord has been finished. Employees of SEC Pomorze has started fitting and welding works at this stage of the project. Element is being fitted in bad weather conditions, at the height of 115 meters, what means that works require precision and experienced personnel.","2022-04-16T17:51:51.775Z","2022-04-20T09:22:57.842Z","2022-04-16T17:51:53.079Z",{"id":996,"name":3446,"alternativeText":3447,"caption":3447,"width":1030,"height":1031,"formats":3448,"hash":3464,"ext":1034,"mime":24,"size":3465,"url":3466,"previewUrl":10,"provider":53,"provider_metadata":10,"createdAt":3467,"updatedAt":3467},"Two SEC Norge foremen in front of the Goliath Gantry Crane during  assembling works at Stord Yard in Norway.PNG","Two SEC Norge foremen in front of the Goliath Gantry Crane during  assembling works at Stord Yard in Norway",{"small":3449,"medium":3454,"thumbnail":3459},{"ext":1034,"url":3450,"hash":3451,"mime":24,"name":3452,"path":10,"size":3453,"width":35,"height":183},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Two-SEC-Norge-foremen-in-front-of-the-Goliath-Gantry-Crane-during--assembling-works-at-Stord-Yard-in-Norway_2022-04-20T09-20-21.PNG","abe3ed3fa16698f032b40fa864057a07","small_Two SEC Norge foremen in front of the Goliath Gantry Crane during  assembling works at Stord Yard in Norway.PNG",405.55,{"ext":1034,"url":3455,"hash":3456,"mime":24,"name":3457,"path":10,"size":3458,"width":42,"height":129},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Two-SEC-Norge-foremen-in-front-of-the-Goliath-Gantry-Crane-during--assembling-works-at-Stord-Yard-in-Norway_2022-04-20T09-20-20.PNG","caec1a18457ef8d7a4e4d1d32d08d352","medium_Two SEC Norge foremen in front of the Goliath Gantry Crane during  assembling works at Stord Yard in Norway.PNG",860.18,{"ext":1034,"url":3460,"hash":3461,"mime":24,"name":3462,"path":10,"size":3463,"width":775,"height":49},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Two-SEC-Norge-foremen-in-front-of-the-Goliath-Gantry-Crane-during--assembling-works-at-Stord-Yard-in-Norway_2022-04-20T09-20-20.PNG","c8c64e3243a5862a5f31fd1b8eb1da1b","thumbnail_Two SEC Norge foremen in front of the Goliath Gantry Crane during  assembling works at Stord Yard in Norway.PNG",77.29,"89410b796deae8338fc71ab2a41f6921",599.19,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FTwo-SEC-Norge-foremen-in-front-of-the-Goliath-Gantry-Crane-during--assembling-works-at-Stord-Yard-in-Norway_2022-04-20T09-20-19.PNG","2022-04-20T09:20:21.201Z",[3469],{"id":669,"Project":3470,"createdAt":3471,"updatedAt":3472,"publishedAt":3473},"Goliath Gantry Crane","2022-04-19T08:41:24.027Z","2022-04-19T08:41:24.770Z","2022-04-19T08:41:24.767Z",[3475],{"id":858,"Client":2376,"createdAt":2377,"updatedAt":2378,"publishedAt":2379},[3477],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3479],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3481],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3483,3484,3485],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":648,"Title":3487,"Slug":3488,"Date":3489,"Story":3490,"Links":10,"createdAt":3491,"updatedAt":3492,"publishedAt":3493,"MainVisualContent":10,"Projects":3494,"Clients":3496,"Countries":3498,"Locations":3500,"Companies":3502,"Tags":3504},"Works at Piping Prefab workshop on Edvard Grieg Project commenced","works-at-piping-prefab-workshop-on-edvard-grieg-project-commenced","2013-10-20","SEC Norge is entering piping prefabrication stage of the Edvard Grieg project. At the end of October, we are starting works on the piping prafabrication facility at Stord, Norway for Kværner Stord AS.\nOur highly skilled teams of TIG welders and piping fitters under supervision of experienced foremen will commence prefabrication of the piping spools to secure the workfront on the installation field at Stord' yard. \nTechnology of pipe spools requires them to be made of advanced materials such as:\n- steel 316L\n- duplex\n- super duplex\n- 6Mo\n- titanium","2022-04-16T17:50:54.628Z","2022-04-20T09:04:06.967Z","2022-04-16T17:50:56.029Z",[3495],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3497],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3499],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3501],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3503],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3505,3506,3507,3508,3509,3510],{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":978,"Tag":979,"createdAt":980,"updatedAt":981,"publishedAt":982},{"id":1136,"Title":3512,"Slug":3513,"Date":3514,"Story":3515,"Links":10,"createdAt":3516,"updatedAt":3517,"publishedAt":3518,"MainVisualContent":10,"Projects":3519,"Clients":3525,"Countries":3531,"Locations":3533,"Companies":3535,"Tags":3537},"Execution of bridge construction elements","execution-of-bridge-construction-elements","2013-10-14","SEC Pomorze welding teams have assisted Vistal Eko in execution of bridge construction elements. The 30-ton duplex construction is part of the Hardanger Bridge. The Hardanger Bridge opened August 2013 is an 1,380 meter long suspension bridge floats 200m above water. It connects two shores between Hardanger Fjord to improve travel and transport on the routes between Odda - Voss and Bergen - Hardanger.","2022-04-16T17:44:15.266Z","2022-04-20T09:02:59.815Z","2022-04-16T17:44:17.035Z",[3520],{"id":1002,"Project":3521,"createdAt":3522,"updatedAt":3523,"publishedAt":3524},"Hardanger Bridge","2022-04-19T08:41:31.861Z","2022-04-19T08:41:32.545Z","2022-04-19T08:41:32.542Z",[3526],{"id":1002,"Client":3527,"createdAt":3528,"updatedAt":3529,"publishedAt":3530},"Vistal Eko","2022-04-19T09:59:01.531Z","2022-04-19T09:59:02.162Z","2022-04-19T09:59:02.159Z",[3532],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3534],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3536],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3538,3539,3540],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":1065,"Title":3542,"Slug":3543,"Date":3544,"Story":3545,"Links":10,"createdAt":3546,"updatedAt":3547,"publishedAt":3548,"MainVisualContent":10,"Projects":3549,"Clients":3551,"Countries":3558,"Locations":3560,"Companies":3562,"Tags":3564},"Edvard Grieg Project- supervision of steel modules","edvard-grieg-project-supervision-of-steel-modules","2013-09-19","Polish site of Edvard Grieg project goes to the next stage, all according with the Kvaerner' plan. Due to constantly growing workfront our Polish site-team is still growing, too. New engineers and inspectors are joining our team. Our team is responsible for supervision over quality and punctuality of Edvard Grieg platform construction works at yards of Polish subcontractors in Gdynia.\n","2022-04-16T17:42:27.562Z","2022-04-20T09:01:18.910Z","2022-04-16T17:42:28.786Z",[3550],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3552,3553],{"id":577,"Client":3044,"createdAt":3045,"updatedAt":3046,"publishedAt":3047},{"id":353,"Client":3554,"createdAt":3555,"updatedAt":3556,"publishedAt":3557},"CRIST Offshore","2022-04-19T09:57:35.654Z","2022-04-19T09:57:36.765Z","2022-04-19T09:57:36.762Z",[3559],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3561],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3563],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3565,3566,3567,3568,3569,3570,3571],{"id":939,"Tag":940,"createdAt":941,"updatedAt":942,"publishedAt":943},{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":930,"Title":3573,"Slug":3574,"Date":3575,"Story":3576,"Links":10,"createdAt":3577,"updatedAt":3578,"publishedAt":3579,"MainVisualContent":10,"Projects":3580,"Clients":3582,"Countries":3585,"Locations":3587,"Companies":3589,"Tags":3591},"Welding inspections and work supervisions for Aker Egersund","welding-inspections-and-work-supervisions-for-aker-egersund","2013-09-06","Under the agreement with Aker Egersund AS we were asked to provide services on the Polish part of the Edvard Grieg project. This resulted in receiving an order from EPG (Energomontaż-Północ Gdynia) for inspection works at their yard in Gdynia, Poland.\nIn frames of the contract since beginning of September inspectors from SEC Pomorze perform welding inspections and supervision works over execution of Edvard Grieg Project elements on modules such as P10, P20, P30 and P40 at the total weight of 1800 tons. Works are conducted at EPGs production facility in Gdynia.","2022-04-16T17:35:19.718Z","2022-04-20T08:57:16.142Z","2022-04-16T17:35:21.048Z",[3581],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3583,3584],{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},{"id":577,"Client":3044,"createdAt":3045,"updatedAt":3046,"publishedAt":3047},[3586],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3588],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3590],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3592,3593,3594,3595,3596],{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":842,"Title":3598,"Slug":3599,"Date":3600,"Story":3601,"Links":10,"createdAt":3602,"updatedAt":3603,"publishedAt":3604,"MainVisualContent":10,"Projects":3605,"Clients":3607,"Countries":3609,"Locations":3611,"Companies":3613,"Tags":3615},"Frame agreement with Konecranes Finland Corporation signed on 2nd July 2013","frame-agreement-with-konecranes-finland-corporation-signed-on-2nd-july-2013","2013-07-02","Our company SEC Pomorze has just signed the frame agreement with worldwide lifting business concern Konecranes Finland Corporation. Our first task is to perform welding works of newly buily Goliath Gantry Crane that will be erected at Kvaerner Stord Yard in Norway. Above mentioned new gantry crane will have a lifting capacity of 800 tonnes with the operating area below wide of 153 meters. The total height of the new crane will be 115 meters.","2022-04-16T17:34:04.265Z","2022-04-20T08:54:35.389Z","2022-04-16T17:34:05.755Z",[3606],{"id":669,"Project":3470,"createdAt":3471,"updatedAt":3472,"publishedAt":3473},[3608],{"id":858,"Client":2376,"createdAt":2377,"updatedAt":2378,"publishedAt":2379},[3610],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3612],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3614],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3616,3617,3618],{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":1554,"Title":3620,"Slug":3621,"Date":3622,"Story":3623,"Links":10,"createdAt":3624,"updatedAt":3625,"publishedAt":3626,"MainVisualContent":10,"Projects":3627,"Clients":3629,"Countries":3632,"Locations":3634,"Companies":3636,"Tags":3638},"Welding supervision in CRIST OFFSHORE on the Edvard Grieg platform project","welding-supervision-in-crist-offshore-on-the-edvard-grieg-platform-project","2013-06-26","Under the agreement with Kvaerner Stord AS we were asked to provide services on the Polish part of the Edvard Grieg project. This resulted in receiving an order from CRIST Offshore for inspection works at their yard in Gdynia, Poland.\nCrist Offshore, as the Kvaerner' main subcontractor in Poland, is manufacturing the steel structures for the Edvard Grieg platform. In frames of the contract our engineering staff performs the welding inspections on the on the emerging construction.","2022-04-16T17:33:05.741Z","2022-04-20T08:53:20.442Z","2022-04-16T17:33:07.111Z",[3628],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3630,3631],{"id":353,"Client":3554,"createdAt":3555,"updatedAt":3556,"publishedAt":3557},{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3633],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3635],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3637],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3639,3640,3641,3642,3643,3644],{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":346,"Title":3646,"Slug":3647,"Date":3648,"Story":3649,"Links":10,"createdAt":3650,"updatedAt":3651,"publishedAt":3652,"MainVisualContent":10,"Projects":3653,"Clients":3655,"Countries":3657,"Locations":3659,"Companies":3661,"Tags":3663},"Establishing the cooperation with KONECRANES Finland Corporation","establishing-the-cooperation-with-konecranes-finland-corporation","2013-06-13","We would like to announce that we have established cooperation with Konecranes Finland. The agreement concerns the provision of logistic services to Konecranes for the needs of various projects carried out in Norway and Poland.\nIn the future, we are counting on the development of cooperation in a wider range of services. Presently we are in the middle of negotiation concerning provision of fitting and welding works on the Goliath Gantry Crane in Stord, Norway.\n","2022-04-16T17:31:39.789Z","2022-04-20T08:47:58.278Z","2022-04-16T17:31:41.122Z",[3654],{"id":669,"Project":3470,"createdAt":3471,"updatedAt":3472,"publishedAt":3473},[3656],{"id":858,"Client":2376,"createdAt":2377,"updatedAt":2378,"publishedAt":2379},[3658],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3660],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3662],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3664,3665,3670],{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":2901,"Tag":3666,"createdAt":3667,"updatedAt":3668,"publishedAt":3669},"Logistics","2022-04-19T08:29:13.722Z","2022-04-19T08:29:14.486Z","2022-04-19T08:29:14.483Z",{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":1002,"Title":3672,"Slug":3673,"Date":3674,"Story":3675,"Links":10,"createdAt":3676,"updatedAt":3677,"publishedAt":3678,"MainVisualContent":10,"Projects":3679,"Clients":3681,"Countries":3683,"Locations":3686,"Companies":3690,"Tags":3693},"Edvard Grieg Project for Kværner Stord","edvard-grieg-project-for-kvaerner-stord","2013-05-05","We are pleased to announce that we have got awarded contract for services on the Edvard Grieg Project by Kværner Stord AS. We will provide our services on the client's premises both on Polish yards (Gdańsk, Gdynia) and Norwegian yard (Stord). First works have already started. Our first task will be to create a Polish site-team to support the Edvard Grieg project. \nLogistic and technical services will include:\n- welding inspections\n- dimension control\n- engineering\n- office administration\n- car fleet rental\n- welding and assembly","2022-04-16T17:30:13.444Z","2022-04-20T08:44:10.360Z","2022-04-16T17:30:15.136Z",[3680],{"id":566,"Project":2654,"createdAt":2655,"updatedAt":2656,"publishedAt":2657},[3682],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3684,3685],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3687,3688,3689],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},{"id":577,"Location":730,"createdAt":731,"updatedAt":732,"publishedAt":733},{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3691,3692],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3694,3699,3700,3705,3706,3707,3708,3709,3710,3711],{"id":2805,"Tag":3695,"createdAt":3696,"updatedAt":3697,"publishedAt":3698},"Office administration","2022-04-20T08:43:57.886Z","2022-04-20T08:43:58.827Z","2022-04-20T08:43:58.821Z",{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":633,"Tag":3701,"createdAt":3702,"updatedAt":3703,"publishedAt":3704},"Car fleet rental","2022-04-19T08:29:33.385Z","2022-04-19T08:29:34.399Z","2022-04-19T08:29:34.396Z",{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":1008,"Tag":1009,"createdAt":1010,"updatedAt":1011,"publishedAt":1012},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":566,"Tag":945,"createdAt":946,"updatedAt":947,"publishedAt":948},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":669,"Title":3713,"Slug":3714,"Date":3715,"Story":3716,"Links":10,"createdAt":3717,"updatedAt":3718,"publishedAt":3719,"MainVisualContent":10,"Projects":3720,"Clients":3723,"Countries":3725,"Locations":3727,"Companies":3729,"Tags":3731},"Building of the platform fo Kværner Stord AS - installation works have begun","building-of-the-platform-fo-kvaerner-stord-as-installation-works-have-begun","2012-12-02","SEC Norge AS has begun work no the next building stage of Eldfisk 2\u002F7S offshore platform. Erection works are continuing at the Stord facility for Kvaerner Stord AS. So far, each stages have been going according to plan, with no delays or disruptions. We are going to maintain this trend thanks to the good progress and quality of the tasks performed.\nThe scope of activities on current stage includes works on steel structures and piping installations. Range of materials is very wide starting with carbon steel and ending up with duplex, super duplex, 6Mo and titanium.","2022-04-16T17:27:57.781Z","2022-04-20T08:38:52.443Z","2022-04-16T17:27:59.152Z",[3721,3722],{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},[3724],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3726],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3728],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3730],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3732,3733,3734,3735],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":984,"Title":3737,"Slug":3738,"Date":3739,"Story":3740,"Links":10,"createdAt":3741,"updatedAt":3742,"publishedAt":3743,"MainVisualContent":10,"Projects":3744,"Clients":3745,"Countries":3746,"Locations":3748,"Companies":3749,"Tags":3751},"We care for our employees - agreement with trade unions in Norway already signed","we-care-for-our-employees-agreement-with-trade-unions-in-norway-already-signed","2012-11-06","We always takes into consideration the wellbeing of SEC employees and we put it in the first place.\nSEC Norge, bearing in mind the good of our employees, has just signed the collective agreement with the Fellesforbundet - federation of trade unions in Norway. The agreement with Fellesforbundet, will let the SEC employees in Norway to benefit from the full range of rights that associated employees have thanks to the trade unions’ activity.","2022-04-16T17:26:10.046Z","2022-04-20T07:57:35.773Z","2022-04-16T17:26:11.354Z",[],[],[3747],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[],[3750],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3752,3757,3758],{"id":930,"Tag":3753,"createdAt":3754,"updatedAt":3755,"publishedAt":3756},"Fellesforbundet","2022-04-19T08:23:57.563Z","2022-04-19T08:23:58.350Z","2022-04-19T08:23:58.348Z",{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":1136,"Tag":3759,"createdAt":3760,"updatedAt":3761,"publishedAt":3762},"Trade unions","2022-04-19T08:24:23.943Z","2022-04-19T08:24:24.605Z","2022-04-19T08:24:24.602Z",{"id":3764,"Title":3765,"Slug":3766,"Date":3767,"Story":3768,"Links":10,"createdAt":3769,"updatedAt":3770,"publishedAt":3771,"MainVisualContent":10,"Projects":3772,"Clients":3775,"Countries":3777,"Locations":3779,"Companies":3781,"Tags":3783},74,"Quality control and welding inspection services for EPG","quality-control-and-welding-inspection-services-for-epg","2012-10-29","Quality control and welding inspection services extend the scope of the commissioned contract with EPG (Energomontaż-Północ Gdynia), previously signed for welding and assembling works. In the frame of the expanded contract, our QC and IWI\u002FIWE personnel will conduct inspection and supervision work on the part of Eldfisk 2\u002F7S project realised on the EPG yard in Gdynia.\n\nWe are glad that the services we provide are appreciated by the Client, which allows us to comprehensively provide a wide range of specialists supporting the development of entire project.","2022-04-20T07:51:44.168Z","2022-04-20T07:51:46.340Z","2022-04-20T07:51:46.334Z",[3773,3774],{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},[3776],{"id":577,"Client":3044,"createdAt":3045,"updatedAt":3046,"publishedAt":3047},[3778],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3780],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3782],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3784,3785,3786,3787,3788,3789],{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":939,"Tag":940,"createdAt":941,"updatedAt":942,"publishedAt":943},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":978,"Title":3791,"Slug":3792,"Date":3793,"Story":3794,"Links":10,"createdAt":3795,"updatedAt":3796,"publishedAt":3797,"MainVisualContent":10,"Projects":3798,"Clients":3800,"Countries":3802,"Locations":3804,"Companies":3806,"Tags":3808},"Welding works for EPG started in October 2012","welding-works-for-epg-started-in-october-2012","2012-10-21","SEC Pomorze gain order from next Polish manufacturer of the Eldfisk II project. EPG (Energomontaż-Północ Gdynia) is responsible for construction of pipelines for the modules of Eldfisk II platform. We were chosen due to the fact that we have know-how and experience in welding and assembly of similar structures, as well as our teams are currentl prefabricating the pipelines for this very project directly at the final yard in Norway for Kværner Stord AS.\nDesign and construction of such pipelines are very challenging and need precision due to usage of extraordinary materials like titanium, super duplex and 6Mo.\n","2022-04-16T17:24:48.584Z","2022-04-20T07:32:25.383Z","2022-04-16T17:24:50.177Z",[3799],{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},[3801],{"id":577,"Client":3044,"createdAt":3045,"updatedAt":3046,"publishedAt":3047},[3803],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3805],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3807],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3809,3810,3811,3812,3813],{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":663,"Title":3815,"Slug":3816,"Date":3817,"Story":3818,"Links":10,"createdAt":3819,"updatedAt":3820,"publishedAt":3821,"MainVisualContent":10,"Projects":3822,"Clients":3825,"Countries":3827,"Locations":3829,"Companies":3831,"Tags":3833},"Eldfisk job on Piping Prefab in Kværner Stord AS is getting started","eldfisk-job-on-piping-prefab-in-kvaerner-stord-as-is-getting-started","2012-09-09","SEC Norge AS has gained next order for the Eldfisk 2\u002F7S Project. We are entering Piping Prefabrication Workshop at Stord, Norway. Today, first group, from three ordered in total, started work at piping workshop for Kværner Stord AS. This skilled team of TIG welders and piping fitters will prefabricated the pipe spools from such demanding materials, like: titanium, duplex, super duplex and 6Mo.\nNext two teams will join the first group in following weeks. Their main task will be to continue work in the piping prefabrication workshop to cater for the increased on-yard production at this stage of the project.","2022-04-16T17:23:15.675Z","2022-04-20T07:30:44.296Z","2022-04-16T17:23:17.233Z",[3823,3824],{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},[3826],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3828],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3830],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3832],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3834,3835,3836,3837,3838],{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":657,"Tag":658,"createdAt":659,"updatedAt":660,"publishedAt":661},{"id":996,"Title":3840,"Slug":3841,"Date":3842,"Story":3843,"Links":10,"createdAt":3844,"updatedAt":3845,"publishedAt":3846,"MainVisualContent":10,"Projects":3847,"Clients":3854,"Countries":3860,"Locations":3866,"Companies":3872,"Tags":3874},"Cooperation with STX Finland Oy and another job at the Eldfisk II project","cooperation-with-stx-finland-oy-and-another-job-at-the-eldfisk-ii-project","2012-08-12","The cooperation on the Eldfisk II project goes beyond the borders of Poland and Norway. SEC Pomorze has been awarded contract by STX Finland Oy for supplying groups of highly skilled personnel to work at manufacturing of steel modules of offshore platform Eldfisk II at yard in Turku.\nAt yard in Turku the 154-cabin accommodation module will be fabricated. Contracted assembly and welding works have started in August 2012, and will be performed for STX Finland Oy part of the STX Europe Group, an international shipbuilding group.\nEldfisk II is part of Greater Ekofisk Area Development project. It is a project of development of The Greater Ekofisk area, one of the oldest operational field complexes on the Norwegian continental shelf located in the North Sea, approximately 300km south-west of Stavanger. This area consists of three fields: Ekofisk, Eldfisk and Embla.\n","2022-04-16T17:20:44.886Z","2022-04-20T07:21:28.870Z","2022-04-16T17:20:46.262Z",[3848,3853],{"id":551,"Project":3849,"createdAt":3850,"updatedAt":3851,"publishedAt":3852},"Ekofisk","2022-04-19T08:40:31.903Z","2022-04-19T08:40:32.822Z","2022-04-19T08:40:32.819Z",{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},[3855],{"id":669,"Client":3856,"createdAt":3857,"updatedAt":3858,"publishedAt":3859},"STX Finland","2022-04-19T09:58:53.799Z","2022-04-19T09:58:54.364Z","2022-04-19T09:58:54.362Z",[3861],{"id":360,"Country":3862,"createdAt":3863,"updatedAt":3864,"publishedAt":3865},"Finland","2022-04-19T10:05:09.661Z","2022-04-19T10:05:10.764Z","2022-04-19T10:05:10.761Z",[3867],{"id":842,"Location":3868,"createdAt":3869,"updatedAt":3870,"publishedAt":3871},"Turku","2022-04-19T10:03:31.180Z","2022-04-19T10:03:31.745Z","2022-04-19T10:03:31.741Z",[3873],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3875,3876,3877],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":858,"Title":3879,"Slug":3880,"Date":3881,"Story":3882,"Links":10,"createdAt":3883,"updatedAt":3884,"publishedAt":3885,"MainVisualContent":10,"Projects":3886,"Clients":3900,"Countries":3906,"Locations":3908,"Companies":3910,"Tags":3912},"Eldfisk 2\u002F7S B01 & F01 for Vistal Gdynia SA - welding works","eldfisk-2-7-s-b01-and-f01-for-vistal-gdynia-sa-welding-works","2012-05-09","After two months of conducting the inspection works on two structures of the Eldfisk 2\u002F7S project:\n- Bridge B01, a bridge connecting the Eldfisk II platform with the Ekofisk platform complex;\n- Flare F01, a 105 meter high flare of the Eldfisk II platform.\n\nWe were finally invited by Vistal Gdynia SA to support the production process with our welding teams. Therefore, in May 2012, our teams of FCAW welders and fitters of steel structures supervised by experienced foremen started welding works at the Vistal yard in Gdynia, Poland. We are very pleased that SEC specialists, both engineering and production professionals, are part of Eldfisk II project on it's various stages. Proving our values, skills and quality both on domestic and Norwegian market.\n","2022-04-15T09:58:40.741Z","2022-04-20T07:06:51.706Z","2022-04-15T09:58:42.358Z",[3887,3888,3893,3898,3899],{"id":551,"Project":3849,"createdAt":3850,"updatedAt":3851,"publishedAt":3852},{"id":984,"Project":3889,"createdAt":3890,"updatedAt":3891,"publishedAt":3892},"Eldfisk 2\u002F7S F01","2022-04-19T08:41:15.652Z","2022-04-19T08:41:16.847Z","2022-04-19T08:41:16.843Z",{"id":978,"Project":3894,"createdAt":3895,"updatedAt":3896,"publishedAt":3897},"Eldfisk 2\u002F7S B01","2022-04-19T08:41:08.571Z","2022-04-19T08:41:09.294Z","2022-04-19T08:41:09.292Z",{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},[3901],{"id":346,"Client":3902,"createdAt":3903,"updatedAt":3904,"publishedAt":3905},"Vistal Gdynia","2022-04-19T09:59:09.790Z","2022-04-19T09:59:10.347Z","2022-04-19T09:59:10.344Z",[3907],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3909],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3911],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3913,3914],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":551,"Title":3916,"Slug":3917,"Date":3918,"Story":3919,"Links":10,"createdAt":3920,"updatedAt":3921,"publishedAt":3922,"MainVisualContent":10,"Projects":3923,"Clients":3926,"Countries":3928,"Locations":3930,"Companies":3932,"Tags":3934},"SEC Norge AS has signed the frame agreement with Kværner Stord AS","sec-norge-as-has-signed-the-frame-agreement-with-kvaerner-stord-as","2012-04-25","SEC has achieved next mile stone on the Norwegian market. On April 25, 2012 SEC Norge AS has signed long-term frame agreement with Kværner Stord AS for hiring out of the highly skilled personnel of various specializations. With the signing of the contract, we were invited to an exclusive group of personnel suppliers for the Kværner's yard at Stord, Norway. First works are planned to commence on the beginning of September 2012. It will be continuation of welding works at the Eldfisk 2\u002F7S project, which we are part from 2011.\nAs part of this assignment, we will be responsible for conducting welding and assembling works and delivery of piping and structural teams with foremen supervision.","2022-04-15T06:19:25.137Z","2022-04-20T07:05:00.856Z","2022-04-15T06:19:26.983Z",[3924,3925],{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},[3927],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[3929],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3931],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},[3933],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3935,3936,3937,3938,3939,3940],{"id":663,"Tag":664,"createdAt":665,"updatedAt":666,"publishedAt":667},{"id":680,"Tag":681,"createdAt":682,"updatedAt":683,"publishedAt":684},{"id":339,"Tag":792,"createdAt":793,"updatedAt":794,"publishedAt":795},{"id":360,"Tag":361,"createdAt":362,"updatedAt":363,"publishedAt":364},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":1065,"Tag":2175,"createdAt":2176,"updatedAt":2177,"publishedAt":2178},{"id":339,"Title":3942,"Slug":3943,"Date":3944,"Story":3945,"Links":10,"createdAt":3946,"updatedAt":3947,"publishedAt":3948,"MainVisualContent":10,"Projects":3949,"Clients":3955,"Countries":3957,"Locations":3959,"Companies":3961,"Tags":3963},"Eldfisk 2\u002F7S B01 & F01 for Vistal Gdynia SA - welding inspections","eldfisk-2-7-s-b01-and-f01-for-vistal-gdynia-sa-welding-inspections","2012-03-01","As part of cooperation on Eldfisk 2\u002F7S project with Kværner and Aker Solutions, we were asked to supervise and inspect construction sites in Poland as well. As result in March 2012, a contract was signed with Vistal Gdynia SA for work in the field of inspection of welded structures. Welding inspections will be carried out as part of work on two structures:\n\n- Bridge B01, a bridge connecting the Eldfisk II platform with the Ekofisk platform complex.\n- Flare F01, a 105 meter high flare of the Eldfisk II platform.\n\nOur certified IWI teams will taking care of whole welding process including keeping a register of weld defects and approval of construction readiness for next production stages.","2022-04-15T06:15:06.372Z","2022-04-20T07:01:58.572Z","2022-04-15T06:15:08.614Z",[3950,3951,3952,3953,3954],{"id":978,"Project":3894,"createdAt":3895,"updatedAt":3896,"publishedAt":3897},{"id":984,"Project":3889,"createdAt":3890,"updatedAt":3891,"publishedAt":3892},{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},{"id":551,"Project":3849,"createdAt":3850,"updatedAt":3851,"publishedAt":3852},[3956],{"id":346,"Client":3902,"createdAt":3903,"updatedAt":3904,"publishedAt":3905},[3958],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},[3960],{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[3962],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[3964,3965,3966,3967,3968],{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":669,"Tag":670,"createdAt":671,"updatedAt":672,"publishedAt":673},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":566,"Title":3970,"Slug":3971,"Date":3972,"Story":3973,"Links":10,"createdAt":3974,"updatedAt":3975,"publishedAt":3976,"MainVisualContent":10,"Projects":3977,"Clients":3985,"Countries":3987,"Locations":3989,"Companies":3991,"Tags":3993},"New year and two new projects Ekofisk-2\u002F4Z and Kristin LPP for Aker Egersund AS","new-year-and-two-new-projects-ekofisk-2-4-z-and-kristin-lpp-for-aker-egersund-as","2012-01-10","Finally we have established legal entity - **SEC Norge AS** - in the Norway. Establishment of SEC Norge response to the growing needs of the Norwegian market. As a result, SEC presence on the Norwegian market is gaining momentum. Cooperation on the Eldfisk II project allowed us to gain new client and contracts. Since beginning of January our IWE\u002FIWI teams are performing welding inspections for our new client Aker Solutions AS at yard in Egersund. The work will be carried out simultaneously on two projects Ekofisk 2\u002F4Z and Kristin LPP projects.","2022-04-15T06:09:22.593Z","2022-04-20T06:58:06.054Z","2022-04-15T06:09:24.830Z",[3978,3979,3980],{"id":551,"Project":3849,"createdAt":3850,"updatedAt":3851,"publishedAt":3852},{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},{"id":858,"Project":3981,"createdAt":3982,"updatedAt":3983,"publishedAt":3984},"Ekofisk 2\u002F4Z","2022-04-19T08:40:44.885Z","2022-04-19T08:40:46.076Z","2022-04-19T08:40:46.072Z",[3986],{"id":360,"Client":640,"createdAt":641,"updatedAt":642,"publishedAt":643},[3988],{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[3990],{"id":353,"Location":1414,"createdAt":1415,"updatedAt":1416,"publishedAt":1417},[3992],{"id":353,"SEC":354,"createdAt":355,"updatedAt":356,"publishedAt":357},[3994,3995,3996],{"id":950,"Tag":951,"createdAt":952,"updatedAt":953,"publishedAt":954},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":2749,"Tag":2750,"createdAt":2751,"updatedAt":2752,"publishedAt":2753},{"id":577,"Title":3998,"Slug":3999,"Date":4000,"Story":4001,"Links":10,"createdAt":4002,"updatedAt":4003,"publishedAt":4004,"MainVisualContent":10,"Projects":4005,"Clients":4008,"Countries":4010,"Locations":4013,"Companies":4016,"Tags":4018},"Logistics and inspection services at Eldfisk 2\u002F7S Project for Kværner Stord AS","logistics-and-inspection-services-at-eldfisk-2-7-s-project-for-kvaerner-stord-as","2011-12-12","We are really proud to announce that we got awarded the contract for logistics and inspection services at Eldfisk 2\u002F7S Project. Since November 2011 we are providing our main services to Kværner Stord AS on the construction site at Stord, Norway and supporting their Polish site in Gdynia. Scope of works on both construction sites includes, among others:\n- welding inspections\n- dimensional control\n- QC and RI activities\n- and car fleet rental\n\nWe are convinced that the development of cooperation with one of the world leaders in the production of offshore structures and drilling platforms will allow us to build a strong and reliable brand in Norway in the long term.","2022-04-14T11:58:47.129Z","2022-04-20T06:44:23.914Z","2022-04-14T11:58:49.005Z",[4006,4007],{"id":996,"Project":3217,"createdAt":3218,"updatedAt":3219,"publishedAt":3220},{"id":663,"Project":3222,"createdAt":3223,"updatedAt":3224,"publishedAt":3225},[4009],{"id":559,"Client":921,"createdAt":922,"updatedAt":923,"publishedAt":924},[4011,4012],{"id":551,"Country":552,"createdAt":553,"updatedAt":554,"publishedAt":555},{"id":339,"Country":340,"createdAt":341,"updatedAt":342,"publishedAt":343},[4014,4015],{"id":346,"Location":347,"createdAt":348,"updatedAt":349,"publishedAt":350},{"id":566,"Location":3052,"createdAt":3053,"updatedAt":3054,"publishedAt":3055},[4017],{"id":360,"SEC":572,"createdAt":573,"updatedAt":574,"publishedAt":575},[4019,4020,4021,4022,4023],{"id":939,"Tag":940,"createdAt":941,"updatedAt":942,"publishedAt":943},{"id":1008,"Tag":1009,"createdAt":1010,"updatedAt":1011,"publishedAt":1012},{"id":627,"Tag":1015,"createdAt":1016,"updatedAt":1017,"publishedAt":1018},{"id":996,"Tag":997,"createdAt":998,"updatedAt":999,"publishedAt":1000},{"id":633,"Tag":3701,"createdAt":3702,"updatedAt":3703,"publishedAt":3704}]