[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$f3jnb6qhc77eql":3},[4],{"id":5,"Title":6,"Slug":7,"Date":8,"Story":9,"Links":10,"createdAt":11,"updatedAt":12,"publishedAt":13,"MainVisualContent":14,"SidePhotos":48,"SideVideos":10,"Documents":10,"Projects":124,"Clients":131,"Countries":138,"Locations":145,"Companies":152,"Tags":159},38,"Since mid-May 2015, SEC has been participating in the prestigious Nyhamna project at the Shell Gas Production Plant in Norway","since-mid-may-2015-sec-has-been-participating-in-the-prestigious-nyhamna-project-at-the-shell-gas-production-plant-in-norway","2015-05-18","The first group of SEC employees, who will be performing modernisation work on the Shell Gas Production Plant on the Norwegian island of Aukra, were sent in mid-May and include a group of welders and fitters, together with a management team. According to the preliminary negotiations, our crew is scheduled to finish their work by the end of June.\nSEC Norge is one of two subcontractors selected by Kvaerner Stord to have qualified for this prestigious project, in which the object will be shut down.\nOrmen Lange is the third largest gas field in Norway and has the highest number of gas wells in the world. Gas was discovered there in 1997 at depths of 850-1200m, making it a true deepwater project for Norway, and gas production from the field started in 2007. Gas processing is carried out on the island of Aukra, before being transported to Eastington in the UK by Langeled – the longest gas installation in the world.",null,"2022-04-16T18:28:58.185Z","2022-04-21T10:50:33.388Z","2022-04-16T18:28:59.637Z",{"id":15,"name":16,"alternativeText":17,"caption":17,"width":18,"height":19,"formats":20,"hash":43,"ext":22,"mime":25,"size":44,"url":45,"previewUrl":10,"provider":46,"provider_metadata":10,"createdAt":47,"updatedAt":47},44,"Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG","Inspection works on the gas modules of Nyhamna Gas Plant at Aukra",750,1000,{"small":21,"medium":30,"thumbnail":36},{"ext":22,"url":23,"hash":24,"mime":25,"name":26,"path":10,"size":27,"width":28,"height":29},".JPG","https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Inspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-49.JPG","38206b43e4e1762c4a8d0b979f953f83","image\u002Fjpeg","small_Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG",57.06,375,500,{"ext":22,"url":31,"hash":32,"mime":25,"name":33,"path":10,"size":34,"width":35,"height":18},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Inspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-49.JPG","e09d45d6dd761aa2353a29b6b9ec3ffa","medium_Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG",109.89,563,{"ext":22,"url":37,"hash":38,"mime":25,"name":39,"path":10,"size":40,"width":41,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Inspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-48.JPG","a75bc3da2b7317a053fc5f3980c91ba8","thumbnail_Inspection works on the gas modules of Nyhamna Gas Plant at Aukra.JPG",8.07,117,156,"97b7aa8b57b557dbfacbcf00e87f875d",567.22,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FInspection-works-on-the-gas-modules-of-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-46-48.JPG","strapi-do-spaces-pabd","2022-04-21T10:46:49.449Z",[49,76,100],{"id":50,"name":51,"alternativeText":52,"caption":52,"width":53,"height":54,"formats":55,"hash":72,"ext":22,"mime":25,"size":73,"url":74,"previewUrl":10,"provider":46,"provider_metadata":10,"createdAt":75,"updatedAt":75},45,"SEC has been participating in the prestigious Nyhamna project at the Shell Gas Production Plant at Aukra Norway.JPG","SEC has been participating in the prestigious Nyhamna project at the Shell Gas Production Plant at Aukra Norway",800,600,{"small":56,"medium":61,"thumbnail":66},{"ext":22,"url":57,"hash":58,"mime":25,"name":59,"path":10,"size":60,"width":29,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-has-been-participating-in-the-prestigious-Nyhamna-project-at-the-Shell-Gas-Production-Plant-at-Aukra-Norway_2022-04-21T10-50-17.JPG","e8bc4524b3698cbc1d8e887e82fa8cb1","small_SEC has been participating in the prestigious Nyhamna project at the Shell Gas Production Plant at Aukra Norway.JPG",35.57,{"ext":22,"url":62,"hash":63,"mime":25,"name":64,"path":10,"size":65,"width":18,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-has-been-participating-in-the-prestigious-Nyhamna-project-at-the-Shell-Gas-Production-Plant-at-Aukra-Norway_2022-04-21T10-50-17.JPG","44e1ee07dd12358f462a6b6632dc9989","medium_SEC has been participating in the prestigious Nyhamna project at the Shell Gas Production Plant at Aukra Norway.JPG",66.25,{"ext":22,"url":67,"hash":68,"mime":25,"name":69,"path":10,"size":70,"width":71,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-has-been-participating-in-the-prestigious-Nyhamna-project-at-the-Shell-Gas-Production-Plant-at-Aukra-Norway_2022-04-21T10-50-16.JPG","a5d4c965f31787f3f6176648ce68e461","thumbnail_SEC has been participating in the prestigious Nyhamna project at the Shell Gas Production Plant at Aukra Norway.JPG",8.78,208,"65b6c61eb3967e85794ec3bf8e27873b",376.33,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-has-been-participating-in-the-prestigious-Nyhamna-project-at-the-Shell-Gas-Production-Plant-at-Aukra-Norway_2022-04-21T10-50-16.JPG","2022-04-21T10:50:17.294Z",{"id":77,"name":78,"alternativeText":79,"caption":79,"width":53,"height":54,"formats":80,"hash":96,"ext":22,"mime":25,"size":97,"url":98,"previewUrl":10,"provider":46,"provider_metadata":10,"createdAt":99,"updatedAt":99},46,"SEC Norge Supervision Team at Nyhamna Gas Plant at Aukra.JPG","SEC Norge Supervision Team at Nyhamna Gas Plant at Aukra",{"small":81,"medium":86,"thumbnail":91},{"ext":22,"url":82,"hash":83,"mime":25,"name":84,"path":10,"size":85,"width":29,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-Supervision-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","7987454e778e4b16c3197782b7bc3b22","small_SEC Norge Supervision Team at Nyhamna Gas Plant at Aukra.JPG",50.32,{"ext":22,"url":87,"hash":88,"mime":25,"name":89,"path":10,"size":90,"width":18,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-Supervision-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","374e110c5b1c409acae3a0653525c5a2","medium_SEC Norge Supervision Team at Nyhamna Gas Plant at Aukra.JPG",101.83,{"ext":22,"url":92,"hash":93,"mime":25,"name":94,"path":10,"size":95,"width":71,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-Supervision-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","1517fd23e268dd0cd378adaec9814e9a","thumbnail_SEC Norge Supervision Team at Nyhamna Gas Plant at Aukra.JPG",10.43,"630026e68276246fd5d51eaa5019304a",461.89,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Norge-Supervision-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","2022-04-21T10:50:18.025Z",{"id":101,"name":102,"alternativeText":103,"caption":103,"width":53,"height":54,"formats":104,"hash":120,"ext":22,"mime":25,"size":121,"url":122,"previewUrl":10,"provider":46,"provider_metadata":10,"createdAt":123,"updatedAt":123},47,"SEC Norge Welding Team at Nyhamna Gas Plant at Aukra.JPG","SEC Norge Welding Team at Nyhamna Gas Plant at Aukra",{"small":105,"medium":110,"thumbnail":115},{"ext":22,"url":106,"hash":107,"mime":25,"name":108,"path":10,"size":109,"width":29,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-Welding-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","42f2d5a907d94ab1d6e32a372502b71e","small_SEC Norge Welding Team at Nyhamna Gas Plant at Aukra.JPG",53.03,{"ext":22,"url":111,"hash":112,"mime":25,"name":113,"path":10,"size":114,"width":18,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-Welding-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","47116f277674ec6016eaed012d94dda3","medium_SEC Norge Welding Team at Nyhamna Gas Plant at Aukra.JPG",103.49,{"ext":22,"url":116,"hash":117,"mime":25,"name":118,"path":10,"size":119,"width":71,"height":42},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-Welding-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","7da78e526322014d2edd8098cae602d7","thumbnail_SEC Norge Welding Team at Nyhamna Gas Plant at Aukra.JPG",11.26,"85259dc2edc52523fb819db8a985fb14",448.24,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Norge-Welding-Team-at-Nyhamna-Gas-Plant-at-Aukra_2022-04-21T10-50-17.JPG","2022-04-21T10:50:18.029Z",[125],{"id":126,"Project":127,"createdAt":128,"updatedAt":129,"publishedAt":130},26,"Nyhamna","2022-04-19T08:43:27.395Z","2022-04-19T08:43:28.052Z","2022-04-19T08:43:28.048Z",[132],{"id":133,"Client":134,"createdAt":135,"updatedAt":136,"publishedAt":137},1,"Kvaerner","2022-04-19T09:57:10.381Z","2022-04-19T09:57:14.361Z","2022-04-19T09:57:14.358Z",[139],{"id":140,"Country":141,"createdAt":142,"updatedAt":143,"publishedAt":144},6,"Norway","2022-04-19T10:07:22.099Z","2022-04-19T10:07:22.890Z","2022-04-19T10:07:22.888Z",[146],{"id":147,"Location":148,"createdAt":149,"updatedAt":150,"publishedAt":151},2,"Aukra","2022-04-19T10:01:00.142Z","2022-04-19T10:01:00.936Z","2022-04-19T10:01:00.933Z",[153],{"id":154,"SEC":155,"createdAt":156,"updatedAt":157,"publishedAt":158},3,"SEC Norge AS","2022-04-19T08:45:05.104Z","2022-04-19T08:45:06.256Z","2022-04-19T08:45:06.251Z",[160,166,171,177,183,189,195],{"id":161,"Tag":162,"createdAt":163,"updatedAt":164,"publishedAt":165},5,"Engineering","2022-04-19T08:21:01.478Z","2022-04-19T08:21:02.208Z","2022-04-19T08:21:02.205Z",{"id":140,"Tag":167,"createdAt":168,"updatedAt":169,"publishedAt":170},"Fitting and assembling","2022-04-19T08:21:18.424Z","2022-04-19T08:21:19.165Z","2022-04-19T08:21:19.161Z",{"id":172,"Tag":173,"createdAt":174,"updatedAt":175,"publishedAt":176},9,"Inspection","2022-04-19T08:21:51.816Z","2022-04-19T08:21:56.870Z","2022-04-19T08:21:52.629Z",{"id":178,"Tag":179,"createdAt":180,"updatedAt":181,"publishedAt":182},10,"Welding","2022-04-19T08:22:16.519Z","2022-04-19T08:22:17.441Z","2022-04-19T08:22:17.436Z",{"id":184,"Tag":185,"createdAt":186,"updatedAt":187,"publishedAt":188},13,"Supervision","2022-04-19T08:22:46.120Z","2022-04-19T08:22:46.763Z","2022-04-19T08:22:46.760Z",{"id":190,"Tag":191,"createdAt":192,"updatedAt":193,"publishedAt":194},28,"IWE","2022-04-19T08:28:05.850Z","2022-04-19T08:28:06.983Z","2022-04-19T08:28:06.980Z",{"id":196,"Tag":197,"createdAt":198,"updatedAt":199,"publishedAt":200},29,"IWI","2022-04-19T08:28:13.449Z","2022-04-19T08:28:14.234Z","2022-04-19T08:28:14.231Z"]