[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$f1viznukdmu39e":3},[4],{"id":5,"Title":6,"Slug":7,"Date":8,"Story":9,"Links":10,"createdAt":11,"updatedAt":12,"publishedAt":13,"MainVisualContent":14,"SidePhotos":49,"SideVideos":10,"Documents":10,"Projects":171,"Clients":178,"Countries":185,"Locations":192,"Companies":199,"Tags":206},42,"Nyhamna Project at the Kvaerner Stord AS production plant enters a new stage","nyhamna-project-at-the-kvaerner-stord-as-production-plant-enters-a-new-stage","2015-11-05","Having recognised the high quality of our services, our client Kvaerner Stord AS commissioned SEC Group with the prefabrication of pipes that will connect the modules being installed at the Ormen Lange gas production and processing plant, located on the Norwegian island of Nyhamna.\nThe pipeline fabrication process is subject to strict regulations regarding dimensional tolerances, which will allow for the pipes to be mounted on the construction site in a smooth and timely manner. During the Nyhamna Project, we are once again working with a full range of steel types used in production:\n- carbon steel,\n- stainless steel,\n- 6MO,\n- duplex,\n- super duplex,\n- Inconel,\n- as well as titanium.",null,"2022-04-16T18:42:02.447Z","2022-04-21T12:53:59.936Z","2022-04-16T18:42:03.720Z",{"id":15,"name":16,"alternativeText":17,"caption":17,"width":18,"height":19,"formats":20,"hash":44,"ext":22,"mime":25,"size":45,"url":46,"previewUrl":10,"provider":47,"provider_metadata":10,"createdAt":48,"updatedAt":48},57,"Preparing of piping spools for Nyhamna Project at Stord yard.JPG","Preparing of piping spools for Nyhamna Project at Stord yard",800,450,{"small":21,"medium":30,"thumbnail":37},{"ext":22,"url":23,"hash":24,"mime":25,"name":26,"path":10,"size":27,"width":28,"height":29},".JPG","https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Preparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","171efb0b5f703fc49828e1a9b5ddc9b2","image\u002Fjpeg","small_Preparing of piping spools for Nyhamna Project at Stord yard.JPG",34.1,500,281,{"ext":22,"url":31,"hash":32,"mime":25,"name":33,"path":10,"size":34,"width":35,"height":36},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Preparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","cc4fda61c1d61d5b1e6d889dad53e5cd","medium_Preparing of piping spools for Nyhamna Project at Stord yard.JPG",63.47,750,422,{"ext":22,"url":38,"hash":39,"mime":25,"name":40,"path":10,"size":41,"width":42,"height":43},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Preparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","a99bc670b896ac65c3d555aeeb21c1c7","thumbnail_Preparing of piping spools for Nyhamna Project at Stord yard.JPG",10.46,245,138,"64924deec44c25e7cfa6c7dde49134eb",279.21,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FPreparing-of-piping-spools-for-Nyhamna-Project-at-Stord-yard_2022-04-21T12-49-46.JPG","strapi-do-spaces-pabd","2022-04-21T12:49:46.936Z",[50,84,113,142],{"id":51,"name":52,"alternativeText":53,"caption":53,"width":18,"height":54,"formats":55,"hash":80,"ext":22,"mime":25,"size":81,"url":82,"previewUrl":10,"provider":47,"provider_metadata":10,"createdAt":83,"updatedAt":83},58,"Welding flanges to wide dimension pipise for Nyhamna Project.JPG","Welding flanges to wide dimension pipise for Nyhamna Project",1422,{"large":56,"small":63,"medium":68,"thumbnail":73},{"ext":22,"url":57,"hash":58,"mime":25,"name":59,"path":10,"size":60,"width":61,"height":62},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_Welding-flanges-to-wide-dimension-pipise-for-Nyhamna-Project_2022-04-21T12-53-08.JPG","20270ca28a002cb99053aa5c06fef614","large_Welding flanges to wide dimension pipise for Nyhamna Project.JPG",62.33,563,1000,{"ext":22,"url":64,"hash":65,"mime":25,"name":66,"path":10,"size":67,"width":29,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Welding-flanges-to-wide-dimension-pipise-for-Nyhamna-Project_2022-04-21T12-53-09.JPG","d1c2ecc1eb33139c3bd5055ec9a01426","small_Welding flanges to wide dimension pipise for Nyhamna Project.JPG",21.94,{"ext":22,"url":69,"hash":70,"mime":25,"name":71,"path":10,"size":72,"width":36,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Welding-flanges-to-wide-dimension-pipise-for-Nyhamna-Project_2022-04-21T12-53-09.JPG","ddc6fedc446486abcdc2d6611dc8169c","medium_Welding flanges to wide dimension pipise for Nyhamna Project.JPG",40.67,{"ext":22,"url":74,"hash":75,"mime":25,"name":76,"path":10,"size":77,"width":78,"height":79},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Welding-flanges-to-wide-dimension-pipise-for-Nyhamna-Project_2022-04-21T12-53-07.JPG","08667833c953af696f20b341805b64e3","thumbnail_Welding flanges to wide dimension pipise for Nyhamna Project.JPG",3.38,88,156,"eb0cc820171ed52441ceb00d83333fd7",551.64,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FWelding-flanges-to-wide-dimension-pipise-for-Nyhamna-Project_2022-04-21T12-53-07.JPG","2022-04-21T12:53:09.769Z",{"id":85,"name":86,"alternativeText":87,"caption":87,"width":18,"height":54,"formats":88,"hash":109,"ext":22,"mime":25,"size":110,"url":111,"previewUrl":10,"provider":47,"provider_metadata":10,"createdAt":112,"updatedAt":112},59,"SEC Norge TIG welder during work on piping prefabrication facility.JPG","SEC Norge TIG welder during work on piping prefabrication facility",{"large":89,"small":94,"medium":99,"thumbnail":104},{"ext":22,"url":90,"hash":91,"mime":25,"name":92,"path":10,"size":93,"width":61,"height":62},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-TIG-welder-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-09.JPG","e798f650b59dc7a4b7ce12527e46f77b","large_SEC Norge TIG welder during work on piping prefabrication facility.JPG",78.92,{"ext":22,"url":95,"hash":96,"mime":25,"name":97,"path":10,"size":98,"width":29,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-TIG-welder-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-09.JPG","34e65c4887c280b98ced119a85927baa","small_SEC Norge TIG welder during work on piping prefabrication facility.JPG",28,{"ext":22,"url":100,"hash":101,"mime":25,"name":102,"path":10,"size":103,"width":36,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-TIG-welder-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-09.JPG","059fe7fe5de089c23e5a4025167549c8","medium_SEC Norge TIG welder during work on piping prefabrication facility.JPG",51.53,{"ext":22,"url":105,"hash":106,"mime":25,"name":107,"path":10,"size":108,"width":78,"height":79},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-TIG-welder-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-07.JPG","214297a222ff674fdabdfaac83d9ac29","thumbnail_SEC Norge TIG welder during work on piping prefabrication facility.JPG",4.38,"2aafa5d1086252c74aee817604ea93b0",608.54,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Norge-TIG-welder-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-07.JPG","2022-04-21T12:53:09.865Z",{"id":114,"name":115,"alternativeText":116,"caption":116,"width":18,"height":54,"formats":117,"hash":138,"ext":22,"mime":25,"size":139,"url":140,"previewUrl":10,"provider":47,"provider_metadata":10,"createdAt":141,"updatedAt":141},60,"Flange tests on piping prefabrication facility for Nyhamna Project.JPG","Flange tests on piping prefabrication facility for Nyhamna Project",{"large":118,"small":123,"medium":128,"thumbnail":133},{"ext":22,"url":119,"hash":120,"mime":25,"name":121,"path":10,"size":122,"width":61,"height":62},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_Flange-tests-on-piping-prefabrication-facility-for-Nyhamna-Project_2022-04-21T12-53-09.JPG","bbb949b3b90520cc9af8c358490c134e","large_Flange tests on piping prefabrication facility for Nyhamna Project.JPG",80.57,{"ext":22,"url":124,"hash":125,"mime":25,"name":126,"path":10,"size":127,"width":29,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_Flange-tests-on-piping-prefabrication-facility-for-Nyhamna-Project_2022-04-21T12-53-09.JPG","9bd446ed8d1bd011d7bf3d29deeb9d81","small_Flange tests on piping prefabrication facility for Nyhamna Project.JPG",27.07,{"ext":22,"url":129,"hash":130,"mime":25,"name":131,"path":10,"size":132,"width":36,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_Flange-tests-on-piping-prefabrication-facility-for-Nyhamna-Project_2022-04-21T12-53-09.JPG","0a9714b4a777971caab53b6b63a6b379","medium_Flange tests on piping prefabrication facility for Nyhamna Project.JPG",51.42,{"ext":22,"url":134,"hash":135,"mime":25,"name":136,"path":10,"size":137,"width":78,"height":79},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_Flange-tests-on-piping-prefabrication-facility-for-Nyhamna-Project_2022-04-21T12-53-07.JPG","a0db2dd0379944599e90f7c3c6587807","thumbnail_Flange tests on piping prefabrication facility for Nyhamna Project.JPG",3.91,"3cf30ee97063c41789ebdd90e10a757c",614.87,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FFlange-tests-on-piping-prefabrication-facility-for-Nyhamna-Project_2022-04-21T12-53-07.JPG","2022-04-21T12:53:09.918Z",{"id":143,"name":144,"alternativeText":145,"caption":145,"width":18,"height":54,"formats":146,"hash":167,"ext":22,"mime":25,"size":168,"url":169,"previewUrl":10,"provider":47,"provider_metadata":10,"createdAt":170,"updatedAt":170},61,"SEC Norge pipe fitter during work on piping prefabrication facility.JPG","SEC Norge pipe fitter during work on piping prefabrication facility",{"large":147,"small":152,"medium":157,"thumbnail":162},{"ext":22,"url":148,"hash":149,"mime":25,"name":150,"path":10,"size":151,"width":61,"height":62},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Flarge_SEC-Norge-pipe-fitter-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-09.JPG","0fe2761181c8a8b982a08440b49e5e2e","large_SEC Norge pipe fitter during work on piping prefabrication facility.JPG",101.63,{"ext":22,"url":153,"hash":154,"mime":25,"name":155,"path":10,"size":156,"width":29,"height":28},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fsmall_SEC-Norge-pipe-fitter-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-09.JPG","d61c839c8ac43a53298e589d18927e85","small_SEC Norge pipe fitter during work on piping prefabrication facility.JPG",32.72,{"ext":22,"url":158,"hash":159,"mime":25,"name":160,"path":10,"size":161,"width":36,"height":35},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fmedium_SEC-Norge-pipe-fitter-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-09.JPG","481a3c67032754dc717e61db92027ad9","medium_SEC Norge pipe fitter during work on piping prefabrication facility.JPG",64.17,{"ext":22,"url":163,"hash":164,"mime":25,"name":165,"path":10,"size":166,"width":78,"height":79},"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002Fthumbnail_SEC-Norge-pipe-fitter-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-08.JPG","1e7bc92ef53fd5a78b4bf485f3700ffe","thumbnail_SEC Norge pipe fitter during work on piping prefabrication facility.JPG",4.26,"4425c79ddd7649cbcdaf1df4ab98c6d7",715.95,"https:\u002F\u002Fsec-resources.fra1.digitaloceanspaces.com\u002Fsec-website-storage\u002FSEC-Norge-pipe-fitter-during-work-on-piping-prefabrication-facility_2022-04-21T12-53-07.JPG","2022-04-21T12:53:09.989Z",[172],{"id":173,"Project":174,"createdAt":175,"updatedAt":176,"publishedAt":177},26,"Nyhamna","2022-04-19T08:43:27.395Z","2022-04-19T08:43:28.052Z","2022-04-19T08:43:28.048Z",[179],{"id":180,"Client":181,"createdAt":182,"updatedAt":183,"publishedAt":184},1,"Kvaerner","2022-04-19T09:57:10.381Z","2022-04-19T09:57:14.361Z","2022-04-19T09:57:14.358Z",[186],{"id":187,"Country":188,"createdAt":189,"updatedAt":190,"publishedAt":191},6,"Norway","2022-04-19T10:07:22.099Z","2022-04-19T10:07:22.890Z","2022-04-19T10:07:22.888Z",[193],{"id":194,"Location":195,"createdAt":196,"updatedAt":197,"publishedAt":198},15,"Stord","2022-04-19T10:03:17.327Z","2022-04-19T10:03:17.903Z","2022-04-19T10:03:17.900Z",[200],{"id":201,"SEC":202,"createdAt":203,"updatedAt":204,"publishedAt":205},3,"SEC Norge AS","2022-04-19T08:45:05.104Z","2022-04-19T08:45:06.256Z","2022-04-19T08:45:06.251Z",[207,212,218,224,230,236],{"id":187,"Tag":208,"createdAt":209,"updatedAt":210,"publishedAt":211},"Fitting and assembling","2022-04-19T08:21:18.424Z","2022-04-19T08:21:19.165Z","2022-04-19T08:21:19.161Z",{"id":213,"Tag":214,"createdAt":215,"updatedAt":216,"publishedAt":217},10,"Welding","2022-04-19T08:22:16.519Z","2022-04-19T08:22:17.441Z","2022-04-19T08:22:17.436Z",{"id":219,"Tag":220,"createdAt":221,"updatedAt":222,"publishedAt":223},11,"Prefabrication","2022-04-19T08:22:27.784Z","2022-04-19T08:22:28.632Z","2022-04-19T08:22:28.629Z",{"id":225,"Tag":226,"createdAt":227,"updatedAt":228,"publishedAt":229},13,"Supervision","2022-04-19T08:22:46.120Z","2022-04-19T08:22:46.763Z","2022-04-19T08:22:46.760Z",{"id":231,"Tag":232,"createdAt":233,"updatedAt":234,"publishedAt":235},25,"Pipe prefabrication","2022-04-19T08:27:12.538Z","2022-04-19T08:27:13.648Z","2022-04-19T08:27:13.644Z",{"id":173,"Tag":237,"createdAt":238,"updatedAt":239,"publishedAt":240},"Piping","2022-04-19T08:27:35.113Z","2022-04-19T08:27:35.998Z","2022-04-19T08:27:35.995Z"]